Skip to content
Gridcensus

Datacenter Sites in WELLS, Indiana

WELLS has 49 scored datacenter candidate sites averaging 52.1/100 DC Readiness, with a catalogued aggregate of 600 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

WELLS, Indiana has 49 scored datacenter candidate sites averaging 52.1/100 DC Readiness, roughly in line with the Indiana average of 53.8. It ranks 55th of 91 Indiana counties by number of sites and 72nd by average score. The top-scoring site is Substation-Adjacent site · f782ed51 at 63.9/100.

49
Candidate sites
52.1/100
Avg DC Readiness
600 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in WELLS

Site-selection context for WELLS

Yessales_tax_exemption
Datacenter tax incentive
10.22¢/kWh
Commercial electricity
8.14¢/kWh
Industrial electricity
9
Fiber providers
Low
Water stress
$10,111
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

How does WELLS compare with other counties in Indiana?

By number of scored sites, WELLS ranks 55th of the 91 Indiana counties with a county page, holding 0.6% of the state's 8,629 sites. Its average DC Readiness of 52.1/100 ranks 72nd in the state and is roughly in line with the national average of 53.0. Nationally it has the 777th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 7 score 55 or higher.

What types of datacenter sites are in WELLS?

Manufacturing sites are the most common (30, 61% of the county's inventory), followed by greenfield (13) and former mine (3). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in WELLS?

Industrial electricity averages 8.14¢/kWh and commercial 10.22¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (32). WRI water stress is low. 9 fiber providers report service in the county. The climate runs 1,000 cooling degree days a year with a mean temperature of 52°F. Land is valued around $10,111 an acre.

By site type

Top datacenter sites in WELLS

Top datacenter sites in WELLS
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN122649Substation-Adjacent345 kV600 MW3.0 yrs63.9
EC Near Montpelier Electric Generating StationGreenfield——3.0 yrs58.8
EC Near Montpelier Electric Generating StationGreenfield——3.0 yrs56.7
EC Near Montpelier Electric Generating StationGreenfield——3.0 yrs56.2
EC Near Montpelier Electric Generating StationGreenfield——3.0 yrs55.9
EC Near Montpelier Electric Generating StationGreenfield——3.0 yrs55.2
EC Near Montpelier Electric Generating StationGreenfield——3.0 yrs55.0
EC Near Montpelier Electric Generating StationGreenfield——3.0 yrs54.9
EC Near Montpelier Electric Generating StationGreenfield——3.0 yrs54.9
EC Near Montpelier Electric Generating StationGreenfield——3.0 yrs54.8
EC Near Montpelier Electric Generating StationGreenfield——3.0 yrs54.5
EC Near Montpelier Electric Generating StationGreenfield——3.0 yrs53.2
ENERGY CONTROL, INC. (ALL OTHER MISCELLANEOUS WOOD PRODUCT MANUFACTURING)Manufacturing——3.0 yrs51.6
DAWN FOOD PRODUCTS, INC. (FROZEN FRUIT, JUICE, AND VEGETABLE MANUFACTURING)Manufacturing——3.0 yrs51.5
TRUSTED MFG., INC. (IRON AND STEEL MILLS)Manufacturing——3.0 yrs51.5
LINDER OIL CO., INC. (PETROLEUM LUBRICATING OIL AND GREASE MANUFACTURING)Manufacturing——3.0 yrs51.5
ROEMBKE MFG. & DESIGN, INC. (SPECIAL DIE AND TOOL, DIE SET, JIG, AND FIXTURE MANUFACTURING)Manufacturing——3.0 yrs51.5
OSSIAN SMOKED MEATS (MEAT PROCESSED FROM CARCASSES)Manufacturing——3.0 yrs51.5
BENTZ TRANSPORT PRODUCTS, INC. (MOTOR VEHICLE BODY MANUFACTURING)Manufacturing——3.0 yrs51.5
TI GROUP AUTOMOTIVE SYSTEMS, LLC (METAL TANK (HEAVY GAUGE) MANUFACTURING)Manufacturing——3.0 yrs51.5
MELCHING'S MACHINE SHOP (MACHINE SHOPS)Manufacturing——3.0 yrs51.5
HOWER TOOL, INC. (CUTTING TOOL AND MACHINE TOOL ACCESSORY MANUFACTURING)Manufacturing——3.0 yrs51.3
MEYER BUILDING, LLC (PREFABRICATED WOOD BUILDING MANUFACTURING)Manufacturing——3.0 yrs51.0
ALMCO STEEL PRODUCTS CORP. (METAL STAMPING)Manufacturing——3.0 yrs50.7
BRC RUBBER & PLASTICS, INC. (ALL OTHER RUBBER PRODUCT MANUFACTURING)Manufacturing——3.0 yrs50.7

Every scored site in WELLS

All 49 sites, best first.

WELLS datacenter FAQ

How many datacenter sites are in WELLS?

49 scored datacenter candidate sites, averaging 52.1/100 DC Readiness. That is the 55th-most of 91 Indiana counties with five or more sites.

What is the highest-scoring datacenter site in WELLS?

Substation-Adjacent site · f782ed51 scores 63.9/100 DC Readiness, the highest of the 49 scored sites in WELLS (a substation-adjacent site).

Does WELLS offer datacenter tax incentives?

Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

What is the natural-hazard risk in WELLS?

FEMA's National Risk Index rates WELLS as "Relatively Moderate" (score 32).

What are industrial electricity rates in WELLS?

Average industrial electricity is 8.14¢/kWh and commercial is 10.22¢/kWh in WELLS.

More in Indiana

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in WELLS, Indiana”, https://gridcensus.com/datacenter-sites/indiana/wells (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for WELLS, Indiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.