DC Readiness
64.1
Good / 100

UNKNOWN122649 is a substation-adjacent datacenter candidate site in WELLS, Indiana, interconnecting through PJM. It screens at 64.1/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN122649
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW
UtilityINDIANA MICHIGAN POWER COinvestor ownedmoderate to large load · terms ≥ 70 MWLarge Load / Industrial Power tariff (≥70 MW) · 80% min take · 12 yr

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth62
Avg queue wait3.8 yrs

Connectivity

Nearest IXPLifeline Ft Wayne
IXP distance29.0 mi
Fiber providers9
Fiber coverage68.0%

Site characteristics

Former usegas
Existing capacity236 MW

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score68/100

Location context

Nearest datacenterINdigital
DC distance35.7 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.22¢/kWh
Industrial electricity8.14¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$10,111

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN122649

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power20%
52
Fiber connectivity12%
69
Energy cost10%
50
Water risk7%
90
Natural hazard6%
68
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in WELLS, ranked by DC Readiness.

Sites near UNKNOWN122649
SiteTypeVoltageCapacityQueue waitScore
EC Near Montpelier Electric Generating StationGreenfield3.0 yrs59.4
EC Near Montpelier Electric Generating StationGreenfield3.0 yrs57.3
EC Near Montpelier Electric Generating StationGreenfield3.0 yrs56.8
EC Near Montpelier Electric Generating StationGreenfield3.0 yrs56.5
EC Near Montpelier Electric Generating StationGreenfield3.0 yrs55.8
EC Near Montpelier Electric Generating StationGreenfield3.0 yrs55.6
EC Near Montpelier Electric Generating StationGreenfield3.0 yrs55.5
EC Near Montpelier Electric Generating StationGreenfield3.0 yrs55.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN122649, WELLS. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.