Datacenter Sites in WASHINGTON, Indiana

WASHINGTON has 25 scored datacenter candidate sites averaging 54.6/100 DC Readiness, with a catalogued aggregate of 4,900 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

25
Candidate sites
54.6/100
Avg DC Readiness
4,900 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating

Site-selection context for WASHINGTON

Yessales_tax_exemption
Datacenter tax incentive
12.12¢/kWh
Commercial electricity
9.95¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$5,753
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

By site type

Top datacenter sites in WASHINGTON

Top datacenter sites in WASHINGTON
SiteTypeVoltageCapacityQueue waitScore
Greenfield (JEFFERSON - ROCKPORT STATION)Greenfield765 kV1,000 MW4.6 yrs68.6
Greenfield (JEFFERSON - ROCKPORT STATION)Greenfield765 kV1,000 MW4.6 yrs68.1
Greenfield (JEFFERSON - ROCKPORT STATION)Greenfield765 kV1,000 MW4.6 yrs66.6
Greenfield (JEFFERSON - ROCKPORT STATION)Greenfield765 kV1,000 MW4.6 yrs65.9
Greenfield (UNKNOWN124908 - R GALLAGHER)Greenfield230 kV300 MW3.0 yrs62.1
Greenfield (R GALLAGHER - COLUMBUS (345KV))Greenfield230 kV300 MW3.0 yrs60.1
OZ WashingtonGreenfield3.0 yrs59.3
Greenfield (UNKNOWN125386 - UNKNOWN125389)Greenfield138 kV100 MW3.0 yrs58.6
Greenfield (UNKNOWN125386 - UNKNOWN125389)Greenfield138 kV100 MW3.0 yrs57.3
Greenfield (UNKNOWN125386 - BEDFORD (138KV)Greenfield138 kV100 MW3.0 yrs56.9
MOULD-RITE, INC. (OTHER MILLWORK (INCLUDING FLOORING ))Manufacturing51.6
SAROYAN HARDWOODS, INC. (SAWMILLS)Manufacturing51.5
FABRI-FORM CO. OF INDIANA, THE (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing51.4
GREEN BANNER PUBLICATIONS, INC. (OTHER COMMERCIAL PRINTING)Manufacturing51.4
VOYLES SAWMILL, INC., GEORGE (OTHER MILLWORK (INCLUDING FLOORING ))Manufacturing50.1
TECUMSEH POWER CO. (LAWN AND GARDEN TRACTOR AND HOME LAWN AND GARDEN EQUIPMENT MANUFACTURING)Manufacturing49.9
FRANK MILLER LUMBER CO., INC. (NOT AVAILABLE)Manufacturing49.7
GKN SINTER METALS, INC. (POWDER METALLURGY PART MANUFACTURING)Manufacturing49.7
SPEED FLEX, INC. (OTHER ELECTRONIC COMPONENT MANUFACTURING)Manufacturing49.6
KIMBALL OFFICE CASEGOODS (WOOD OFFICE FURNITURE MANUFACTURING)Manufacturing49.6
LEADER PUBLISHING CO. OF SALEM, INC. (NOT AVAILABLE)Manufacturing49.5
JEAN'S EXTRUSION, INC. (UNLAMINATED PLASTICS PROFILE SHAPE MANUFACTURING)Manufacturing48.7
INTERNATIONAL WOOD, INC. (NOT AVAILABLE)Manufacturing48.7
HOOSIER PRECAST, LLC (OTHER CONCRETE PRODUCT MANUFACTURING)Manufacturing48.7
Mine SiteFormer Mine41.6

WASHINGTON datacenter FAQ

How many datacenter sites are in WASHINGTON?
25 scored datacenter candidate sites, averaging 54.6/100 DC Readiness.
Does WASHINGTON offer datacenter tax incentives?
Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
What is the natural-hazard risk in WASHINGTON?
FEMA's National Risk Index rates WASHINGTON as "Relatively Moderate" (score 32).
What are industrial electricity rates in WASHINGTON?
Average industrial electricity is 9.95¢/kWh and commercial is 12.12¢/kWh in WASHINGTON.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WASHINGTON, Indiana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.