WASHINGTON has 22 scored datacenter candidate sites averaging 53.3/100 DC Readiness, with a catalogued aggregate of 350 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

WASHINGTON, Indiana has 22 scored datacenter candidate sites averaging 53.3/100 DC Readiness, roughly in line with the Indiana average of 53.8. It ranks 77th of 91 Indiana counties by number of sites and 40th by average score. The top-scoring site is OZ Washington at 59.9/100.

22
Candidate sites
53.3/100
Avg DC Readiness
350 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 22 in WASHINGTON

Site-selection context for WASHINGTON

Yessales_tax_exemption
Datacenter tax incentive
12.12¢/kWh
Commercial electricity
9.95¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$5,753
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

How does WASHINGTON compare with other counties in Indiana?

By number of scored sites, WASHINGTON ranks 77th of the 91 Indiana counties with a county page, holding 0.3% of the state's 8,629 sites. Its average DC Readiness of 53.3/100 ranks 40th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1603rd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 6 score 55 or higher.

What types of datacenter sites are in WASHINGTON?

Manufacturing sites are the most common (14, 64% of the county's inventory), followed by substation-adjacent (6) and former mine (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in WASHINGTON?

Industrial electricity averages 9.95¢/kWh and commercial 12.12¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (32). WRI water stress is low. 5 fiber providers report service in the county. The climate runs 1,000 cooling degree days a year with a mean temperature of 52°F. Land is valued around $5,753 an acre.

By site type

Top datacenter sites in WASHINGTON

Top datacenter sites in WASHINGTON
SiteTypeVoltageCapacityQueue waitScore
OZ WashingtonGreenfield——3.0 yrs59.9
UNKNOWN125386Substation-Adjacent138 kV100 MW3.0 yrs57.2
NEW PEKINSubstation-Adjacent69 kV50 MW3.0 yrs56.4
TAP140173Substation-Adjacent69 kV50 MW3.0 yrs56.0
UNKNOWN140188Substation-Adjacent69 kV50 MW3.0 yrs55.9
UNKNOWN157619Substation-Adjacent69 kV50 MW3.0 yrs55.8
UNKNOWN157618Substation-Adjacent69 kV50 MW3.0 yrs54.4
MOULD-RITE, INC. (OTHER MILLWORK (INCLUDING FLOORING ))Manufacturing——3.0 yrs52.8
GREEN BANNER PUBLICATIONS, INC. (OTHER COMMERCIAL PRINTING)Manufacturing——3.0 yrs52.7
SAROYAN HARDWOODS, INC. (SAWMILLS)Manufacturing——3.0 yrs52.7
FABRI-FORM CO. OF INDIANA, THE (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing——3.0 yrs52.7
GKN SINTER METALS, INC. (POWDER METALLURGY PART MANUFACTURING)Manufacturing——3.0 yrs51.9
KIMBALL OFFICE CASEGOODS (WOOD OFFICE FURNITURE MANUFACTURING)Manufacturing——3.0 yrs51.9
LEADER PUBLISHING CO. OF SALEM, INC. (NOT AVAILABLE)Manufacturing——3.0 yrs51.9
SPEED FLEX, INC. (OTHER ELECTRONIC COMPONENT MANUFACTURING)Manufacturing——3.0 yrs51.9
TECUMSEH POWER CO. (LAWN AND GARDEN TRACTOR AND HOME LAWN AND GARDEN EQUIPMENT MANUFACTURING)Manufacturing——3.0 yrs51.9
FRANK MILLER LUMBER CO., INC. (NOT AVAILABLE)Manufacturing——3.0 yrs51.6
VOYLES SAWMILL, INC., GEORGE (OTHER MILLWORK (INCLUDING FLOORING ))Manufacturing——3.0 yrs51.4
JEAN'S EXTRUSION, INC. (UNLAMINATED PLASTICS PROFILE SHAPE MANUFACTURING)Manufacturing——3.0 yrs51.0
HOOSIER PRECAST, LLC (OTHER CONCRETE PRODUCT MANUFACTURING)Manufacturing——3.0 yrs51.0
Mine SiteFormer Mine——3.0 yrs51.0
INTERNATIONAL WOOD, INC. (NOT AVAILABLE)Manufacturing——3.0 yrs50.8

Every scored site in WASHINGTON

All 22 sites, best first.

WASHINGTON datacenter FAQ

How many datacenter sites are in WASHINGTON?

22 scored datacenter candidate sites, averaging 53.3/100 DC Readiness. That is the 77th-most of 91 Indiana counties with five or more sites.

What is the highest-scoring datacenter site in WASHINGTON?

OZ Washington scores 59.9/100 DC Readiness, the highest of the 22 scored sites in WASHINGTON (a greenfield site).

Does WASHINGTON offer datacenter tax incentives?

Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

What is the natural-hazard risk in WASHINGTON?

FEMA's National Risk Index rates WASHINGTON as "Relatively Moderate" (score 32).

What are industrial electricity rates in WASHINGTON?

Average industrial electricity is 9.95¢/kWh and commercial is 12.12¢/kWh in WASHINGTON.

More in Indiana

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in WASHINGTON, Indiana”, https://gridcensus.com/datacenter-sites/indiana/washington (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for WASHINGTON, Indiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.