Skip to content
Gridcensus

KIMBALL OFFICE CASEGOODS (WOOD OFFICE FURNITURE MANUFACTURING)

Manufacturing

WASHINGTON, Indiana

DC Readiness
53.7
Fair / 100

KIMBALL OFFICE CASEGOODS (WOOD OFFICE FURNITURE MANUFACTURING) is a manufacturing datacenter candidate site in WASHINGTON, Indiana. It screens at 53.7/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

UtilityDUKE ENERGY INDIANA, LLCinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 3.5 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

Avg queue wait3.5 yrs

Connectivity

Nearest IXPHeyburn Building
IXP distance30.8 mi
Fiber providers5
Fiber coverage72.6%

Site characteristics

Site typeManufacturing

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score68/100

Location context

Nearest datacenterHeyburn Building
DC distance30.8 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.12¢/kWh
Industrial electricity9.95¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$5,753

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track KIMBALL OFFICE CASEGOODS (WOOD OFFICE FURNITURE MANUFACTURING)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
49
Fiber connectivity12%
70
Energy cost10%
50
Water risk7%
90
Natural hazard6%
68
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in WASHINGTON, ranked by DC Readiness.

Sites near KIMBALL OFFICE CASEGOODS (WOOD OFFICE FURNITURE MANUFACTURING)
SiteTypeVoltageCapacityQueue waitScore
OZ WashingtonGreenfield——3.0 yrs59.5
UNKNOWN125386Substation-Adjacent138 kV100 MW3.8 yrs56.6
NEW PEKINSubstation-Adjacent69 kV50 MW3.8 yrs55.8
TAP140173Substation-Adjacent69 kV50 MW3.8 yrs55.5
UNKNOWN140188Substation-Adjacent69 kV50 MW3.8 yrs55.3
UNKNOWN157619Substation-Adjacent69 kV50 MW3.8 yrs55.3
MOULD-RITE, INC. (OTHER MILLWORK (INCLUDING FLOORING ))Manufacturing——3.5 yrs54.7
FABRI-FORM CO. OF INDIANA, THE (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing——3.5 yrs54.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for KIMBALL OFFICE CASEGOODS (WOOD OFFICE FURNITURE MANUFACTURING), WASHINGTON is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.