Datacenter Sites in WARREN, Indiana
WARREN has 14 scored datacenter candidate sites averaging 56.9/100 DC Readiness, with a catalogued aggregate of 2,100 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
14
Candidate sites
56.9/100
Avg DC Readiness
2,100 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
Site-selection context for WARREN
Yessales_tax_exemption
Datacenter tax incentive
12.11¢/kWh
Commercial electricity
7.99¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$7,338
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
By site type
Top datacenter sites in WARREN
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| ATTICA 230KV SUBSTATION | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 58.3 |
| EC Coal Warren County | Greenfield | — | — | 3.0 yrs | 56.8 |
| UNKNOWN123135 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 53.7 |
| HOSE TECHNOLOGY, INC., DIVISION OF KURI (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 53.3 |
| S A L, INC. (MEAT PROCESSED FROM CARCASSES) | Manufacturing | — | — | 3.5 yrs | 53.2 |
| ACCUBURN WILLIAMSPORT, INC. (IRON AND STEEL MILLS) | Manufacturing | — | — | 3.5 yrs | 53.2 |
| TMF CENTER, INC. (MACHINE SHOPS) | Manufacturing | — | — | 3.5 yrs | 53.2 |
| GOOD ROADS, INC. (ALL OTHER MOTOR VEHICLE PARTS MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 53.1 |
| TRU-FLEX METAL HOSE CORP. (BOAT BUILDING) | Manufacturing | — | — | 3.5 yrs | 52.8 |
| DYNA-FAB CORP. (MACHINE SHOPS) | Manufacturing | — | — | 3.5 yrs | 52.7 |
| Mine Site | Former Mine | — | — | 3.8 yrs | 50.7 |
| Mine Site | Former Mine | — | — | 3.8 yrs | 50.2 |
WARREN datacenter FAQ
- How many datacenter sites are in WARREN?
- 14 scored datacenter candidate sites, averaging 56.9/100 DC Readiness.
- Does WARREN offer datacenter tax incentives?
- Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
- What is the natural-hazard risk in WARREN?
- FEMA's National Risk Index rates WARREN as "Relatively Moderate" (score 32).
- What are industrial electricity rates in WARREN?
- Average industrial electricity is 7.99¢/kWh and commercial is 12.11¢/kWh in WARREN.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen