ATTICA 230KV SUBSTATION
Substation-AdjacentWARREN, Indiana · PJM
ATTICA 230KV SUBSTATION is a substation-adjacent datacenter candidate site in WARREN, Indiana, interconnecting through PJM. It screens at 60.0/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
Site location
Get alerts
Track ATTICA 230KV SUBSTATION
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in WARREN, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN123135 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 56.5 |
| EC Coal Warren County | Greenfield | — | — | 3.0 yrs | 55.4 |
| HOSE TECHNOLOGY, INC., DIVISION OF KURI (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 52.3 |
| ACCUBURN WILLIAMSPORT, INC. (IRON AND STEEL MILLS) | Manufacturing | — | — | 3.5 yrs | 52.2 |
| S A L, INC. (MEAT PROCESSED FROM CARCASSES) | Manufacturing | — | — | 3.5 yrs | 52.1 |
| GOOD ROADS, INC. (ALL OTHER MOTOR VEHICLE PARTS MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 52.1 |
| TMF CENTER, INC. (MACHINE SHOPS) | Manufacturing | — | — | 3.5 yrs | 52.1 |
| TRU-FLEX METAL HOSE CORP. (BOAT BUILDING) | Manufacturing | — | — | 3.5 yrs | 51.8 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for ATTICA 230KV SUBSTATION, WARREN. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.