Datacenter Sites in MIAMI, Indiana

MIAMI has 44 scored datacenter candidate sites averaging 51.6/100 DC Readiness, with a catalogued aggregate of 1,235 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

MIAMI, Indiana has 44 scored datacenter candidate sites averaging 51.6/100 DC Readiness, roughly in line with the Indiana average of 53.8. It ranks 60th of 91 Indiana counties by number of sites and 81st by average score. The top-scoring site is DEEDSVILLE 345KV at 61.2/100.

44
Candidate sites
51.6/100
Avg DC Readiness
1,235 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in MIAMI

Site-selection context for MIAMI

Yessales_tax_exemption
Datacenter tax incentive
10.95¢/kWh
Commercial electricity
9.02¢/kWh
Industrial electricity
8
Fiber providers
Low
Water stress
$7,928
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

How does MIAMI compare with other counties in Indiana?

By number of scored sites, MIAMI ranks 60th of the 91 Indiana counties with a county page, holding 0.5% of the state's 8,629 sites. Its average DC Readiness of 51.6/100 ranks 81st in the state and is roughly in line with the national average of 53.0. Nationally it has the 868th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 7 score 55 or higher.

What types of datacenter sites are in MIAMI?

Manufacturing sites are the most common (25, 57% of the county's inventory), followed by greenfield (12) and industrial (2). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in MIAMI?

Industrial electricity averages 9.02¢/kWh and commercial 10.95¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (32). WRI water stress is low. 8 fiber providers report service in the county. The climate runs 1,000 cooling degree days a year with a mean temperature of 52°F. Land is valued around $7,928 an acre.

By site type

Top datacenter sites in MIAMI

Top datacenter sites in MIAMI
SiteTypeVoltageCapacityQueue waitScore
DEEDSVILLE 345KVSubstation-Adjacent345 kV600 MW3.0 yrs61.2
PERUSubstation-Adjacent230 kV300 MW3.0 yrs60.1
EC Near Peru (IN)Greenfield——3.0 yrs56.8
OZ MiamiGreenfield——3.0 yrs55.4
EC Coal Miami CountyGreenfield——3.0 yrs55.4
Peru (IN)Brownfield—35 MW3.0 yrs55.4
EC Near Peru (IN)Greenfield——3.0 yrs55.3
EC Near Peru (IN)Greenfield——3.0 yrs54.9
EC Near Peru (IN)Greenfield——3.0 yrs54.8
EC Near Peru (IN)Greenfield——3.0 yrs54.5
Greenfield (WALTON - PERU)Greenfield230 kV300 MW3.0 yrs53.7
EC Near Peru (IN)Greenfield——3.0 yrs53.3
EC Near Peru (IN)Greenfield——3.0 yrs52.9
OZ MiamiGreenfield——3.0 yrs52.3
STONE ROAD COMCAST, INC. (ALL OTHER MISCELLANEOUS TEXTILE PRODUCT MILLS)Manufacturing——3.0 yrs50.0
Mine SiteFormer Mine——3.0 yrs50.0
BRYAN STEAM, LLC (NOT AVAILABLE)Manufacturing——3.0 yrs50.0
SQUARE D CO. (SWITCHGEAR AND SWITCHBOARD APPARATUS MANUFACTURING)Manufacturing——3.0 yrs50.0
CLASSICO SEATING (NONUPHOLSTERED WOOD HOUSEHOLD FURNITURE MANUFACTURING)Manufacturing——3.0 yrs50.0
PERU TRIBUNE (OTHER COMMERCIAL PRINTING)Manufacturing——3.0 yrs50.0
AMERICAN STATIONERY CO., INC. (OTHER COMMERCIAL PRINTING)Manufacturing——3.0 yrs50.0
MODERN GRAPHICS, INC. (OTHER COMMERCIAL PRINTING)Manufacturing——3.0 yrs50.0
KUEPPER FAVOR CO., INC. (ALL OTHER CONVERTED PAPER PRODUCT MANUFACTURING)Manufacturing——3.0 yrs50.0
REDMON CO., INC., W. C. (NOT AVAILABLE)Manufacturing——3.0 yrs50.0
RADEL WOOD PRODUCTS, INC. (WOOD KITCHEN CABINET AND COUNTERTOP MANUFACTURING)Manufacturing——3.0 yrs50.0

Every scored site in MIAMI

All 44 sites, best first.

MIAMI datacenter FAQ

How many datacenter sites are in MIAMI?

44 scored datacenter candidate sites, averaging 51.6/100 DC Readiness. That is the 60th-most of 91 Indiana counties with five or more sites.

What is the highest-scoring datacenter site in MIAMI?

DEEDSVILLE 345KV scores 61.2/100 DC Readiness, the highest of the 44 scored sites in MIAMI (a substation-adjacent site).

Does MIAMI offer datacenter tax incentives?

Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

What is the natural-hazard risk in MIAMI?

FEMA's National Risk Index rates MIAMI as "Relatively Moderate" (score 32).

What are industrial electricity rates in MIAMI?

Average industrial electricity is 9.02¢/kWh and commercial is 10.95¢/kWh in MIAMI.

More in Indiana

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in MIAMI, Indiana”, https://gridcensus.com/datacenter-sites/indiana/miami (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for MIAMI, Indiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.