ROCK INDUSTRIES, INC. (H Q) (CUT STONE AND STONE PRODUCT MANUFACTURING)
ManufacturingMIAMI, Indiana
ROCK INDUSTRIES, INC. (H Q) (CUT STONE AND STONE PRODUCT MANUFACTURING) is a manufacturing datacenter candidate site in MIAMI, Indiana. It screens at 51.8/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in MIAMI, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| DEEDSVILLE 345KV | Substation-Adjacent | 345 kV | 600 MW | 3.8 yrs | 57.3 |
| EC Near Peru (IN) | Greenfield | — | — | 3.0 yrs | 56.6 |
| Peru (IN) | Brownfield | — | 35 MW | 3.0 yrs | 56.1 |
| PERU | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 55.4 |
| EC Coal Miami County | Greenfield | — | — | 3.0 yrs | 55.2 |
| EC Near Peru (IN) | Greenfield | — | — | 3.0 yrs | 55.1 |
| OZ Miami | Greenfield | — | — | 3.0 yrs | 55.0 |
| EC Near Peru (IN) | Greenfield | — | — | 3.0 yrs | 54.7 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for ROCK INDUSTRIES, INC. (H Q) (CUT STONE AND STONE PRODUCT MANUFACTURING), MIAMI. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.