Datacenter Sites in JOHNSON, Indiana

JOHNSON has 99 scored datacenter candidate sites averaging 55.2/100 DC Readiness, with a catalogued aggregate of 2,052 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

JOHNSON, Indiana has 99 scored datacenter candidate sites averaging 55.2/100 DC Readiness, roughly in line with the Indiana average of 53.8. It ranks 23rd of 91 Indiana counties by number of sites and 15th by average score. The top-scoring site is Substation-Adjacent site · 048cc797 at 67.3/100.

99
Candidate sites
55.2/100
Avg DC Readiness
2,052 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in JOHNSON

Site-selection context for JOHNSON

Yessales_tax_exemption
Datacenter tax incentive
12.55¢/kWh
Commercial electricity
8.74¢/kWh
Industrial electricity
12
Fiber providers
Low
Water stress
$10,532
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

How does JOHNSON compare with other counties in Indiana?

By number of scored sites, JOHNSON ranks 23rd of the 91 Indiana counties with a county page, holding 1.1% of the state's 8,629 sites. Its average DC Readiness of 55.2/100 ranks 15th in the state and is roughly in line with the national average of 53.0. Nationally it has the 329th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 39 score 55 or higher.

What types of datacenter sites are in JOHNSON?

Manufacturing sites are the most common (68, 69% of the county's inventory), followed by industrial (13) and substation-adjacent (11). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in JOHNSON?

Industrial electricity averages 8.74¢/kWh and commercial 12.55¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (32). WRI water stress is low. 12 fiber providers report service in the county. The climate runs 1,000 cooling degree days a year with a mean temperature of 52°F. Land is valued around $10,532 an acre.

By site type

Top datacenter sites in JOHNSON

Top datacenter sites in JOHNSON
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN125074Substation-Adjacent345 kV600 MW3.0 yrs67.3
UNKNOWN125098Substation-Adjacent230 kV300 MW3.0 yrs64.8
FRANKLINSubstation-Adjacent230 kV300 MW3.0 yrs64.0
UNKNOWN128114Substation-Adjacent230 kV300 MW3.0 yrs63.7
UNKNOWN160263Substation-Adjacent138 kV100 MW3.0 yrs61.5
UNKNOWN125073Substation-Adjacent138 kV100 MW3.0 yrs61.3
EC Near Orme Park Water Treatment PlantGreenfield——3.0 yrs61.3
EC Near Orme Park Water Treatment PlantGreenfield——3.0 yrs60.7
TAP140392Substation-Adjacent138 kV100 MW3.0 yrs60.3
TAP140391Substation-Adjacent138 kV100 MW3.0 yrs59.7
Orme Park Water Treatment PlantBrownfield138 kV2 MW3.0 yrs58.2
MORGANTOWNSubstation-Adjacent69 kV50 MW3.0 yrs57.3
SAMARIASubstation-Adjacent69 kV50 MW3.0 yrs57.1
UNKNOWN128111Substation-Adjacent69 kV50 MW3.0 yrs57.1
OZ JohnsonGreenfield——3.0 yrs56.3
JOHNSON'S JEWELRY, J. L. (JEWELRY (EXCEPT COSTUME) MANUFACTURING)Manufacturing——3.0 yrs55.3
EC Near Orme Park Water Treatment PlantGreenfield——3.0 yrs55.3
WESSELS CO., INC. (NOT AVAILABLE)Manufacturing——3.0 yrs55.2
MCGEE & CO. FINE JEWELERS (JEWELRY (EXCEPT COSTUME) MANUFACTURING)Manufacturing——3.0 yrs55.2
AMERICAN INDUSTRIAL CORP. (AIR PURIFICATION EQUIPMENT MANUFACTURING)Manufacturing——3.0 yrs55.1
SAN JO STEEL, INC. (IRON AND STEEL MILLS)Manufacturing——3.0 yrs55.1
REDI CONTROLS, INC. (AUTOMATIC ENVIRONMENTAL CONTROL MANUFACTURING FOR RESIDENTIAL, COMMERCIAL, AND APPLIANCE USE)Manufacturing——3.0 yrs55.1
OAKEN BARREL BREWING CO. (BREWERIES)Manufacturing——3.0 yrs55.1
TETRA PAK, INC., PROCESSING SYSTEMS (COMMERCIAL LAUNDRY, DRYCLEANING, AND PRESSING MACHINE MANUFACTURING)Manufacturing——3.0 yrs55.1
R & R TECHNOLOGIES, LLC (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing——3.0 yrs55.1

Every scored site in JOHNSON

All 99 sites, best first.

JOHNSON datacenter FAQ

How many datacenter sites are in JOHNSON?

99 scored datacenter candidate sites, averaging 55.2/100 DC Readiness. That is the 23rd-most of 91 Indiana counties with five or more sites.

What is the highest-scoring datacenter site in JOHNSON?

Substation-Adjacent site · 048cc797 scores 67.3/100 DC Readiness, the highest of the 99 scored sites in JOHNSON (a substation-adjacent site).

Does JOHNSON offer datacenter tax incentives?

Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

What is the natural-hazard risk in JOHNSON?

FEMA's National Risk Index rates JOHNSON as "Relatively Moderate" (score 32).

What are industrial electricity rates in JOHNSON?

Average industrial electricity is 8.74¢/kWh and commercial is 12.55¢/kWh in JOHNSON.

More in Indiana

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in JOHNSON, Indiana”, https://gridcensus.com/datacenter-sites/indiana/johnson (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for JOHNSON, Indiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.