Skip to content
Gridcensus

JOHNSON, Indiana · MISO

DC Readiness
57.1
Good / 100

At a glance

SAMARIA is a substation-adjacent datacenter candidate site in JOHNSON, Indiana, scoring 57.1/100 DC Readiness — 13th of 99 scored sites in the county. Its nearest substation is SAMARIA (0 mi, 69 kV). It sits in the MISO grid region and the DUKE ENERGY INDIANA, LLC service territory, where interconnection has averaged 3.0 years from request to operation. GridCensus catalogs 50 MW of candidate capacity here.

Power & interconnection

Nearest substationSAMARIA
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityDUKE ENERGY INDIANA, LLCinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionMISO
Queue depth170
Avg queue wait3.0 yrs
Recent queue wait4.9 yrs
Completion rate14%
Withdrawal rate87%

Connectivity

Nearest IXPDartPoints Columbus, IN - CLU1
IXP distance21.1 mi
Fiber providers12
Fiber coverage90.7%

Site characteristics

Land contactJohnson County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score68/100

Location context

Nearest datacenterDartPoints Columbus, IN - CLU1
DC distance21.1 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.55¢/kWh
Industrial electricity8.74¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$10,532

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track SAMARIA

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does SAMARIA compare with other sites in JOHNSON?

SAMARIA ranks 13th of 99 scored candidate sites in JOHNSON. Its 57.1/100 is roughly in line with the county average of 55.2. It is roughly in line with the Indiana average of 54.0 and roughly in line with the national average of 53.2.

Against the Indiana average, its strongest sub-score is power availability (46 vs 33) and its weakest is water (90 vs 90). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is SAMARIA to power, fiber and other datacenters?

The nearest mapped substation, SAMARIA, is about 0 miles away and operates at 69 kV. The nearest located transmission bottleneck is CIN23031_DRESSER_DRESS08ALE13_2_1 (MISO), 69 miles away. For connectivity, the nearest internet exchange facility is DartPoints Columbus, IN - CLU1 at 21.1 miles. 12 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is DartPoints Columbus, IN - CLU1, 21.1 miles away.

What are the flood, water and hazard risks at SAMARIA?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). At the county level, FEMA's National Risk Index rates JOHNSON "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
47
Fiber connectivity12%
81
Energy cost10%
50
Water risk7%
90
Natural hazard6%
68
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in JOHNSON, ranked by DC Readiness.

Sites near SAMARIA
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN125074Substation-Adjacent345 kV600 MW3.0 yrs67.3
UNKNOWN125098Substation-Adjacent230 kV300 MW3.0 yrs64.8
FRANKLINSubstation-Adjacent230 kV300 MW3.0 yrs64.0
UNKNOWN128114Substation-Adjacent230 kV300 MW3.0 yrs63.7
UNKNOWN160263Substation-Adjacent138 kV100 MW3.0 yrs61.5
EC Near Orme Park Water Treatment PlantGreenfield——3.0 yrs61.3
UNKNOWN125073Substation-Adjacent138 kV100 MW3.0 yrs61.3
EC Near Orme Park Water Treatment PlantGreenfield——3.0 yrs60.7

SAMARIA: common questions

What is the DC Readiness score of SAMARIA?

SAMARIA scores 57.1/100 on the GridCensus DC Readiness scale, rated good. It ranks 13th of 99 scored sites in JOHNSON. The JOHNSON average is 55.2 and the Indiana average is 54.0.

What is the nearest substation to SAMARIA?

The nearest mapped substation is SAMARIA, about 0 miles away, at 69 kV. GridCensus catalogs 50 MW of candidate capacity for the site.

Which electric utility serves SAMARIA?

DUKE ENERGY INDIANA, LLC (investor owned) holds the retail service territory that contains the site; its holding company is DUKE ENERGY CORP.

What grid region is SAMARIA in?

SAMARIA is in the MISO region. Projects interconnecting there have averaged a 3.0-year wait from queue request to operation.

Is SAMARIA in a flood zone?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).

How far is SAMARIA from an internet exchange?

The nearest internet exchange facility is DartPoints Columbus, IN - CLU1, about 21.1 miles away; 12 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “SAMARIA, JOHNSON, IN”, https://gridcensus.com/datacenter-sites/indiana/johnson/samaria-1983db17 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for SAMARIA, JOHNSON is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.