Skip to content
Gridcensus

Datacenter Sites in HUNTINGTON, Indiana

HUNTINGTON has 62 scored datacenter candidate sites averaging 54.0/100 DC Readiness, with a catalogued aggregate of 1,600 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

62
Candidate sites
54.0/100
Avg DC Readiness
1,600 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in HUNTINGTON

Site-selection context for HUNTINGTON

Yessales_tax_exemption
Datacenter tax incentive
11.33¢/kWh
Commercial electricity
6.22¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$8,495
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

By site type

Top datacenter sites in HUNTINGTON

Top datacenter sites in HUNTINGTON
SiteTypeVoltageCapacityQueue waitScore
SORENSONSubstation-Adjacent765 kV1,000 MW3.8 yrs67.7
UNKNOWN122647Substation-Adjacent138 kV100 MW3.8 yrs59.5
OZ HuntingtonGreenfield——3.0 yrs58.7
HUNTINGTON JUNCTIONSubstation-Adjacent138 kV100 MW3.8 yrs57.9
UNKNOWN123273Substation-Adjacent138 kV100 MW3.8 yrs57.7
UNKNOWN123274Substation-Adjacent138 kV100 MW3.8 yrs57.5
UNKNOWN128134Substation-Adjacent138 kV100 MW3.8 yrs57.3
ROCK CREEKSubstation-Adjacent138 kV100 MW3.8 yrs57.0
ECONOMY MACHINE PRODUCTS, INC. (MACHINE SHOPS)Manufacturing——3.5 yrs55.5
PHD, INC. (FLUID POWER CYLINDER AND ACTUATOR MANUFACTURING)Manufacturing——3.5 yrs54.2
GLADIEUX TRADING, LLC (PETROLEUM REFINERIES)Manufacturing——3.5 yrs54.2
MIDWEST INDUSTRIAL METAL FABRICATION (IRON FOUNDRIES)Manufacturing——3.5 yrs54.2
ECOLAB, INC., HUNTINGTON PLT. (SOAP AND OTHER DETERGENT MANUFACTURING)Manufacturing——3.5 yrs54.0
E & B PAVING, INC. (ASPHALT PAVING MIXTURE AND BLOCK MANUFACTURING)Manufacturing——3.5 yrs54.0
PULLEY-KELLAM, INC. (NONUPHOLSTERED WOOD HOUSEHOLD FURNITURE MANUFACTURING)Manufacturing——3.5 yrs54.0
WABASH TECHNOLOGIES (MAGNETIC AND OPTICAL RECORDING MEDIA MANUFACTURING)Manufacturing——3.5 yrs54.0
HUNTINGTON ELECTRIC, INC. (ELECTRONIC RESISTOR MANUFACTURING)Manufacturing——3.5 yrs54.0
ISOLATEK INTERNATIONAL (MINERAL WOOL MANUFACTURING)Manufacturing——3.5 yrs54.0
CFM U. S. CORP. (HEATING EQUIPMENT (EXCEPT WARM AIR FURNACES) MANUFACTURING)Manufacturing——3.5 yrs54.0
OUR SUNDAY VISITOR, INC. (OTHER COMMERCIAL PRINTING)Manufacturing——3.5 yrs54.0
MIGNONE COMMUNICATIONS, INC. (UNLAMINATED PLASTICS FILM AND SHEET (EXCEPT PACKAGING) MANUFACTURING)Manufacturing——3.5 yrs54.0
PATHFINDER SERVICES (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing——3.5 yrs54.0
GOOD HUMOR-BREYERS ICE CREAM (ICE CREAM AND FROZEN DESSERT MANUFACTURING)Manufacturing——3.5 yrs53.9
GENERAL ALUMINUM MFG. CO. (ALUMINUM FOUNDRIES (EXCEPT DIE-CASTING))Manufacturing——3.5 yrs53.9
ART CHEMICAL PRODUCTS, INC. (GROUND OR TREATED MINERAL AND EARTH MANUFACTURING)Manufacturing——3.5 yrs53.9

HUNTINGTON datacenter FAQ

How many datacenter sites are in HUNTINGTON?
62 scored datacenter candidate sites, averaging 54.0/100 DC Readiness.
Does HUNTINGTON offer datacenter tax incentives?
Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
What is the natural-hazard risk in HUNTINGTON?
FEMA's National Risk Index rates HUNTINGTON as "Relatively Moderate" (score 32).
What are industrial electricity rates in HUNTINGTON?
Average industrial electricity is 6.22¢/kWh and commercial is 11.33¢/kWh in HUNTINGTON.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for HUNTINGTON, Indiana. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.