OZ Huntington

Greenfield

HUNTINGTON, Indiana · PJM

DC Readiness
58.7
Good / 100

OZ Huntington is a greenfield datacenter candidate site in HUNTINGTON, Indiana, interconnecting through PJM. It screens at 58.7/100 DC Readiness and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.11¢/kWh
UtilityDUKE ENERGY INDIANA, LLCinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 4.2 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth62
Avg queue wait3.0 yrs
Recent queue wait4.2 yrs
Completion rate14%
Withdrawal rate87%

Connectivity

Nearest IXPLifeline Ft Wayne
IXP distance20.8 mi
Fiber providers7
Fiber coverage83.8%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance130.4 mi

Site characteristics

Site typeGreenfield
Land contactHuntington County Assessor
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteCASE CORP DBA CASE POWER EQUIPMENT
Hazard sub-score58/100
Construction cost index91.4 (avg 100)

Location context

Nearest datacenterINdigital
DC distance21.3 mi
Nearest rail1.2 mi
Nearest gas pipeline6.4 mi
Nearest fiber route73.5 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.33¢/kWh
Industrial electricity6.22¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$8,495

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track OZ Huntington

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
39
Fiber connectivity12%
81
Energy cost10%
89
Water risk7%
92
Natural hazard6%
58
Buildability7%
65
Labor market4%
50
DC cluster4%
65
Land / acreage3%
57
Construction cost3%
74
Gas pipeline2%
79
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in HUNTINGTON, ranked by DC Readiness.

Sites near OZ Huntington
SiteTypeVoltageCapacityQueue waitScore
SORENSONSubstation-Adjacent765 kV1,000 MW3.8 yrs67.7
UNKNOWN122647Substation-Adjacent138 kV100 MW3.8 yrs59.5
HUNTINGTON JUNCTIONSubstation-Adjacent138 kV100 MW3.8 yrs57.9
UNKNOWN123273Substation-Adjacent138 kV100 MW3.8 yrs57.7
UNKNOWN123274Substation-Adjacent138 kV100 MW3.8 yrs57.5
UNKNOWN128134Substation-Adjacent138 kV100 MW3.8 yrs57.3
ROCK CREEKSubstation-Adjacent138 kV100 MW3.8 yrs57.0
ECONOMY MACHINE PRODUCTS, INC. (MACHINE SHOPS)Manufacturing——3.5 yrs55.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OZ Huntington, HUNTINGTON. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.