HENRY has 68 scored datacenter candidate sites averaging 51.4/100 DC Readiness, with a catalogued aggregate of 2,500 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

68
Candidate sites
51.4/100
Avg DC Readiness
2,500 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in HENRY

Site-selection context for HENRY

Yessales_tax_exemption
Datacenter tax incentive
10.95¢/kWh
Commercial electricity
8.12¢/kWh
Industrial electricity
10
Fiber providers
Low
Water stress
$8,606
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

By site type

Top datacenter sites in HENRY

Top datacenter sites in HENRY
SiteTypeVoltageCapacityQueue waitScore
FALL CREEKSubstation-Adjacent345 kV600 MW3.8 yrs62.7
GREENSBOROSubstation-Adjacent345 kV600 MW3.8 yrs61.6
UNKNOWN167570Substation-Adjacent345 kV600 MW3.8 yrs61.2
OZ HenryGreenfield——3.0 yrs57.0
UNKNOWN124068Substation-Adjacent138 kV100 MW3.8 yrs56.2
UNKNOWN124067Substation-Adjacent138 kV100 MW3.8 yrs56.0
NEW CASTLESubstation-Adjacent138 kV100 MW3.8 yrs55.4
UNKNOWN124483Substation-Adjacent138 kV100 MW3.8 yrs54.9
UNKNOWN160340Substation-Adjacent69 kV50 MW3.8 yrs54.7
UNKNOWN124487Substation-Adjacent69 kV50 MW3.8 yrs54.2
TAP160339Substation-Adjacent69 kV50 MW3.8 yrs53.8
TAP160336Substation-Adjacent69 kV50 MW3.8 yrs53.8
TAP160338Substation-Adjacent69 kV50 MW3.8 yrs53.4
TAP160335Substation-Adjacent69 kV50 MW3.8 yrs52.9
AUCTION EXCHANGE & COLLECTORS NEWS (NOT AVAILABLE)Manufacturing——3.5 yrs52.9
DMG WORLD MEDIA (PREPRESS SERVICES)Manufacturing——3.5 yrs52.9
E-BIOFUELS, LLC (NOT AVAILABLE)Manufacturing——3.5 yrs52.8
SPICELAND WOOD PRODUCTS, INC. (ALL OTHER MISCELLANEOUS WOOD PRODUCT MANUFACTURING)Manufacturing——3.5 yrs52.1
DRAPER, INC. (BLIND AND SHADE MANUFACTURING)Manufacturing——3.5 yrs52.1
OUTOKUMPU STAINLESS (IRON AND STEEL MILLS)Manufacturing——3.5 yrs51.8
WESTERN PRODUCTS OF INDIANA (HARDWARE MANUFACTURING)Manufacturing——3.5 yrs51.8
PHOENIX ASSETS, LLC (ORNAMENTAL AND ARCHITECTURAL METAL WORK MANUFACTURING)Manufacturing——3.5 yrs51.8
ALLEGHENY LUDLUM STEEL CORP. (ELECTROPLATING, PLATING, POLISHING, ANODIZING AND COLORING)Manufacturing——3.5 yrs51.8
NEW CASTLE WALL COVERINGS, LLC (COATED AND LAMINATED PAPER MANUFACTURING)Manufacturing——3.5 yrs51.7
BONDED FOAM, INC. (POLYSTYRENE FOAM PRODUCT MANUFACTURING)Manufacturing——3.5 yrs51.7

HENRY datacenter FAQ

How many datacenter sites are in HENRY?
68 scored datacenter candidate sites, averaging 51.4/100 DC Readiness.
Does HENRY offer datacenter tax incentives?
Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
What is the natural-hazard risk in HENRY?
FEMA's National Risk Index rates HENRY as "Relatively Moderate" (score 32).
What are industrial electricity rates in HENRY?
Average industrial electricity is 8.12¢/kWh and commercial is 10.95¢/kWh in HENRY.