Datacenter Sites in HENRY, Indiana
HENRY has 68 scored datacenter candidate sites averaging 51.4/100 DC Readiness, with a catalogued aggregate of 2,500 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
68
Candidate sites
51.4/100
Avg DC Readiness
2,500 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
Site-selection context for HENRY
Yessales_tax_exemption
Datacenter tax incentive
10.95¢/kWh
Commercial electricity
8.12¢/kWh
Industrial electricity
10
Fiber providers
Low
Water stress
$8,606
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
By site type
Top datacenter sites in HENRY
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| FALL CREEK | Substation-Adjacent | 345 kV | 600 MW | 3.8 yrs | 62.7 |
| GREENSBORO | Substation-Adjacent | 345 kV | 600 MW | 3.8 yrs | 61.6 |
| UNKNOWN167570 | Substation-Adjacent | 345 kV | 600 MW | 3.8 yrs | 61.2 |
| OZ Henry | Greenfield | — | — | 3.0 yrs | 57.0 |
| UNKNOWN124068 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 56.2 |
| UNKNOWN124067 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 56.0 |
| NEW CASTLE | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 55.4 |
| UNKNOWN124483 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 54.9 |
| UNKNOWN160340 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 54.7 |
| UNKNOWN124487 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 54.2 |
| TAP160339 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 53.8 |
| TAP160336 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 53.8 |
| TAP160338 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 53.4 |
| TAP160335 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 52.9 |
| AUCTION EXCHANGE & COLLECTORS NEWS (NOT AVAILABLE) | Manufacturing | — | — | 3.5 yrs | 52.9 |
| DMG WORLD MEDIA (PREPRESS SERVICES) | Manufacturing | — | — | 3.5 yrs | 52.9 |
| E-BIOFUELS, LLC (NOT AVAILABLE) | Manufacturing | — | — | 3.5 yrs | 52.8 |
| SPICELAND WOOD PRODUCTS, INC. (ALL OTHER MISCELLANEOUS WOOD PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 52.1 |
| DRAPER, INC. (BLIND AND SHADE MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 52.1 |
| OUTOKUMPU STAINLESS (IRON AND STEEL MILLS) | Manufacturing | — | — | 3.5 yrs | 51.8 |
| WESTERN PRODUCTS OF INDIANA (HARDWARE MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 51.8 |
| PHOENIX ASSETS, LLC (ORNAMENTAL AND ARCHITECTURAL METAL WORK MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 51.8 |
| ALLEGHENY LUDLUM STEEL CORP. (ELECTROPLATING, PLATING, POLISHING, ANODIZING AND COLORING) | Manufacturing | — | — | 3.5 yrs | 51.8 |
| NEW CASTLE WALL COVERINGS, LLC (COATED AND LAMINATED PAPER MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 51.7 |
| BONDED FOAM, INC. (POLYSTYRENE FOAM PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 51.7 |
HENRY datacenter FAQ
- How many datacenter sites are in HENRY?
- 68 scored datacenter candidate sites, averaging 51.4/100 DC Readiness.
- Does HENRY offer datacenter tax incentives?
- Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
- What is the natural-hazard risk in HENRY?
- FEMA's National Risk Index rates HENRY as "Relatively Moderate" (score 32).
- What are industrial electricity rates in HENRY?
- Average industrial electricity is 8.12¢/kWh and commercial is 10.95¢/kWh in HENRY.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for HENRY, Indiana. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.