Datacenter Sites in HENRY, Indiana

HENRY has 68 scored datacenter candidate sites averaging 52.5/100 DC Readiness, with a catalogued aggregate of 2,500 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

HENRY, Indiana has 68 scored datacenter candidate sites averaging 52.5/100 DC Readiness, roughly in line with the Indiana average of 53.8. It ranks 38th of 91 Indiana counties by number of sites and 62nd by average score. The top-scoring site is FALL CREEK at 64.5/100.

68
Candidate sites
52.5/100
Avg DC Readiness
2,500 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in HENRY

Site-selection context for HENRY

Yessales_tax_exemption
Datacenter tax incentive
10.95¢/kWh
Commercial electricity
8.12¢/kWh
Industrial electricity
10
Fiber providers
Low
Water stress
$8,606
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

How does HENRY compare with other counties in Indiana?

By number of scored sites, HENRY ranks 38th of the 91 Indiana counties with a county page, holding 0.8% of the state's 8,629 sites. Its average DC Readiness of 52.5/100 ranks 62nd in the state and is roughly in line with the national average of 53.0. Nationally it has the 543rd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 13 score 55 or higher.

What types of datacenter sites are in HENRY?

Industrial sites are the most common (34, 50% of the county's inventory), followed by manufacturing (19) and substation-adjacent (13). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in HENRY?

Industrial electricity averages 8.12¢/kWh and commercial 10.95¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (32). WRI water stress is low. 10 fiber providers report service in the county. The climate runs 1,000 cooling degree days a year with a mean temperature of 52°F. Land is valued around $8,606 an acre.

By site type

Top datacenter sites in HENRY

Top datacenter sites in HENRY
SiteTypeVoltageCapacityQueue waitScore
FALL CREEKSubstation-Adjacent345 kV600 MW3.0 yrs64.5
GREENSBOROSubstation-Adjacent345 kV600 MW3.0 yrs63.5
UNKNOWN167570Substation-Adjacent345 kV600 MW3.0 yrs60.8
OZ HenryGreenfield——3.0 yrs58.6
UNKNOWN124068Substation-Adjacent138 kV100 MW3.0 yrs58.1
UNKNOWN124067Substation-Adjacent138 kV100 MW3.0 yrs57.8
NEW CASTLESubstation-Adjacent138 kV100 MW3.0 yrs57.2
UNKNOWN124483Substation-Adjacent138 kV100 MW3.0 yrs56.8
UNKNOWN160340Substation-Adjacent69 kV50 MW3.0 yrs56.6
UNKNOWN124487Substation-Adjacent69 kV50 MW3.0 yrs56.0
TAP160336Substation-Adjacent69 kV50 MW3.0 yrs55.7
TAP160339Substation-Adjacent69 kV50 MW3.0 yrs55.6
TAP160338Substation-Adjacent69 kV50 MW3.0 yrs55.3
TAP160335Substation-Adjacent69 kV50 MW3.0 yrs54.8
Former Hulse & Co.Industrial——3.0 yrs52.1
Former Kuhns EngineeringIndustrial——3.0 yrs52.1
Former Hoosier FeederIndustrial——3.0 yrs52.1
E-BIOFUELS, LLC (NOT AVAILABLE)Manufacturing——3.0 yrs52.0
DMG WORLD MEDIA (PREPRESS SERVICES)Manufacturing——3.0 yrs52.0
AUCTION EXCHANGE & COLLECTORS NEWS (NOT AVAILABLE)Manufacturing——3.0 yrs52.0
Former Corner TavernIndustrial——3.0 yrs51.9
Proposed Kennard ParkIndustrial——3.0 yrs51.4
Mine SiteFormer Mine——3.0 yrs51.4
SPICELAND WOOD PRODUCTS, INC. (ALL OTHER MISCELLANEOUS WOOD PRODUCT MANUFACTURING)Manufacturing——3.0 yrs51.3
Former Speedway Station #5229Industrial——3.0 yrs51.3

Every scored site in HENRY

All 68 sites, best first.

HENRY datacenter FAQ

How many datacenter sites are in HENRY?

68 scored datacenter candidate sites, averaging 52.5/100 DC Readiness. That is the 38th-most of 91 Indiana counties with five or more sites.

What is the highest-scoring datacenter site in HENRY?

FALL CREEK scores 64.5/100 DC Readiness, the highest of the 68 scored sites in HENRY (a substation-adjacent site).

Does HENRY offer datacenter tax incentives?

Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

What is the natural-hazard risk in HENRY?

FEMA's National Risk Index rates HENRY as "Relatively Moderate" (score 32).

What are industrial electricity rates in HENRY?

Average industrial electricity is 8.12¢/kWh and commercial is 10.95¢/kWh in HENRY.

More in Indiana

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in HENRY, Indiana”, https://gridcensus.com/datacenter-sites/indiana/henry (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for HENRY, Indiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.