Former Hulse & Co.

Industrial

HENRY, Indiana · MISO

DC Readiness
52.1
Fair / 100

At a glance

Former Hulse & Co. is an industrial datacenter candidate site in HENRY, Indiana, scoring 52.1/100 DC Readiness — 15th of 68 scored sites in the county. It sits in the MISO grid region and the DUKE ENERGY INDIANA, LLC service territory, where interconnection has averaged 3.0 years from request to operation.

Power & interconnection

UtilityDUKE ENERGY INDIANA, LLCinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionMISO
Queue depth170
Avg queue wait3.0 yrs
Recent queue wait4.9 yrs
Completion rate14%
Withdrawal rate87%

Connectivity

Nearest IXPLifeline Eastgate
IXP distance27.1 mi
Fiber providers10
Fiber coverage67.3%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score68/100

Location context

Nearest datacenterVerizon Wireless DC
DC distance22.4 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.95¢/kWh
Industrial electricity8.12¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$8,606

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Former Hulse & Co.

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Former Hulse & Co. compare with other sites in HENRY?

Former Hulse & Co. ranks 15th of 68 scored candidate sites in HENRY. Its 52.1/100 is roughly in line with the county average of 52.5. It is roughly in line with the Indiana average of 54.0 and roughly in line with the national average of 53.2.

Against the Indiana average, its strongest sub-score is speed to power (47 vs 46) and its weakest is fiber connectivity (72 vs 79). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Former Hulse & Co. to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is Lifeline Eastgate at 27.1 miles. 10 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Verizon Wireless DC, 22.4 miles away.

What are the flood, water and hazard risks at Former Hulse & Co.?

At the county level, FEMA's National Risk Index rates HENRY "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
47
Fiber connectivity12%
72
Energy cost10%
50
Water risk7%
90
Natural hazard6%
68
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in HENRY, ranked by DC Readiness.

Sites near Former Hulse & Co.
SiteTypeVoltageCapacityQueue waitScore
FALL CREEKSubstation-Adjacent345 kV600 MW3.0 yrs64.5
GREENSBOROSubstation-Adjacent345 kV600 MW3.0 yrs63.5
UNKNOWN167570Substation-Adjacent345 kV600 MW3.0 yrs61.9
OZ HenryGreenfield——3.0 yrs58.6
UNKNOWN124068Substation-Adjacent138 kV100 MW3.0 yrs58.1
UNKNOWN124067Substation-Adjacent138 kV100 MW3.0 yrs57.8
NEW CASTLESubstation-Adjacent138 kV100 MW3.0 yrs57.2
UNKNOWN124483Substation-Adjacent138 kV100 MW3.0 yrs56.8

Former Hulse & Co.: common questions

What is the DC Readiness score of Former Hulse & Co.?

Former Hulse & Co. scores 52.1/100 on the GridCensus DC Readiness scale, rated fair. It ranks 15th of 68 scored sites in HENRY. The HENRY average is 52.5 and the Indiana average is 54.0.

Which electric utility serves Former Hulse & Co.?

DUKE ENERGY INDIANA, LLC (investor owned) holds the retail service territory that contains the site; its holding company is DUKE ENERGY CORP.

What grid region is Former Hulse & Co. in?

Former Hulse & Co. is in the MISO region. Projects interconnecting there have averaged a 3.0-year wait from queue request to operation.

How far is Former Hulse & Co. from an internet exchange?

The nearest internet exchange facility is Lifeline Eastgate, about 27.1 miles away; 10 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Former Hulse & Co., HENRY, IN”, https://gridcensus.com/datacenter-sites/indiana/henry/former-hulse-co-8bc5cdb5 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Former Hulse & Co., HENRY is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.