Datacenter Sites in Hendricks County, Indiana
Hendricks County has 77 scored datacenter candidate sites averaging 55.1/100 DC Readiness, with a catalogued aggregate of 3,150 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
77
Candidate sites
55.1/100
Avg DC Readiness
3,150 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
Site-selection context for Hendricks County
Yessales_tax_exemption
Datacenter tax incentive
11.14¢/kWh
Commercial electricity
8.64¢/kWh
Industrial electricity
9
Fiber providers
Low
Water stress
$9,052
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
By site type
Top datacenter sites in Hendricks County
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| THOMPSON | Substation-Adjacent | 345 kV | 600 MW | 3.8 yrs | 64.5 |
| QUALITECH | Substation-Adjacent | 345 kV | 600 MW | 3.8 yrs | 63.0 |
| AMO | Substation-Adjacent | 345 kV | 600 MW | 3.8 yrs | 62.3 |
| TAP140380 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 58.7 |
| UNKNOWN124374 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 58.7 |
| TAP140381 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 58.4 |
| UNKNOWN124377 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 58.4 |
| PLAINFIELD SOUTH | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 58.1 |
| OZ Hendricks | Greenfield | — | — | 3.0 yrs | 57.6 |
| TAP156023 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 56.2 |
| UNKNOWN124381 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 56.1 |
| UNKNOWN124384 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 56.1 |
| UNKNOWN124382 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 56.1 |
| TAP156025 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 55.9 |
| UNKNOWN124562 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 55.9 |
| UNKNOWN124571 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 55.9 |
| UNKNOWN124376 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 55.9 |
| TAP139946 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 55.7 |
| UNKNOWN124597 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 55.6 |
| MEARS MACHINE CORP. (SPECIAL DIE AND TOOL, DIE SET, JIG, AND FIXTURE MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 55.1 |
| PHOENIX FABRICATORS & ERECTORS, INC. (IRON AND STEEL MILLS) | Manufacturing | — | — | 3.5 yrs | 55.1 |
| DREW, INC., P. H. (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 55.1 |
| MERRILL-STONE, INC. (FABRICATED STRUCTURAL METAL MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 55.1 |
| NHI MEDIA (NOT AVAILABLE) | Manufacturing | — | — | 3.5 yrs | 55.0 |
| INFINITY PRODUCTS, INC. (MEN'S AND BOYS' CUT AND SEW WORK CLOTHING MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 55.0 |
Hendricks County datacenter FAQ
- How many datacenter sites are in Hendricks County?
- 77 scored datacenter candidate sites, averaging 55.1/100 DC Readiness.
- Does Hendricks County offer datacenter tax incentives?
- Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
- What is the natural-hazard risk in Hendricks County?
- FEMA's National Risk Index rates Hendricks County as "Relatively Moderate" (score 32).
- What are industrial electricity rates in Hendricks County?
- Average industrial electricity is 8.64¢/kWh and commercial is 11.14¢/kWh in Hendricks County.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Hendricks County, Indiana. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.