Skip to content
Gridcensus

Hendricks County, Indiana · PJM

DC Readiness
55.9
Good / 100

TAP156025 is a substation-adjacent datacenter candidate site in Hendricks County, Indiana, interconnecting through PJM. It screens at 55.9/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP156025
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityDUKE ENERGY INDIANA, LLCinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth62
Avg queue wait3.8 yrs

Connectivity

Nearest IXPNetrality - Indy Telcom Center - 733 W. Henry
IXP distance13.9 mi
Fiber providers9
Fiber coverage57.8%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score68/100

Location context

Nearest datacenterNetrality - Indy Telcom Center - 733 W. Henry
DC distance13.9 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.14¢/kWh
Industrial electricity8.64¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$9,052

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP156025

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
38
Fiber connectivity12%
80
Energy cost10%
50
Water risk7%
90
Natural hazard6%
68
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Hendricks County, ranked by DC Readiness.

Sites near TAP156025
SiteTypeVoltageCapacityQueue waitScore
THOMPSONSubstation-Adjacent345 kV600 MW3.8 yrs64.5
QUALITECHSubstation-Adjacent345 kV600 MW3.8 yrs63.0
AMOSubstation-Adjacent345 kV600 MW3.8 yrs62.3
TAP140380Substation-Adjacent138 kV100 MW3.8 yrs58.7
UNKNOWN124374Substation-Adjacent138 kV100 MW3.8 yrs58.7
UNKNOWN124377Substation-Adjacent138 kV100 MW3.8 yrs58.4
TAP140381Substation-Adjacent138 kV100 MW3.8 yrs58.4
PLAINFIELD SOUTHSubstation-Adjacent138 kV100 MW3.8 yrs58.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP156025, Hendricks County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.