Datacenter Sites in DECATUR, Indiana

DECATUR has 43 scored datacenter candidate sites averaging 54.1/100 DC Readiness, with a catalogued aggregate of 3,800 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

43
Candidate sites
54.1/100
Avg DC Readiness
3,800 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating

Site-selection context for DECATUR

Yessales_tax_exemption
Datacenter tax incentive
12.16¢/kWh
Commercial electricity
8.54¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$9,415
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

By site type

Top datacenter sites in DECATUR

Top datacenter sites in DECATUR
SiteTypeVoltageCapacityQueue waitScore
Greenfield (JEFFERSON - GREENTOWN)Greenfield765 kV1,000 MW3.0 yrs67.4
UNKNOWN125096Substation-Adjacent138 kV100 MW3.0 yrs66.6
UNKNOWN125090Substation-Adjacent138 kV100 MW3.0 yrs66.3
UNKNOWN125230Substation-Adjacent138 kV100 MW3.0 yrs64.1
TAP169430Substation-Adjacent161 kV100 MW3.0 yrs63.8
UNKNOWN124902Substation-Adjacent161 kV100 MW3.0 yrs63.0
Greenfield (UNKNOWN124885 - HANNA)Greenfield345 kV600 MW3.0 yrs61.9
UNKNOWN125089Substation-Adjacent161 kV100 MW3.0 yrs61.4
Greenfield (JEFFERSON - GREENTOWN)Greenfield765 kV1,000 MW3.0 yrs61.1
Greenfield (UNKNOWN124895 - UNKNOWN125230)Greenfield138 kV100 MW3.0 yrs58.3
Greenfield (UNKNOWN124902 - TAP169430)Greenfield161 kV100 MW3.0 yrs58.3
Greenfield (UNKNOWN125230 - COLUMBUS (345K)Greenfield138 kV100 MW3.0 yrs58.0
Greenfield (UNKNOWN125090 - TAP137552)Greenfield138 kV100 MW3.0 yrs57.4
Greenfield (UNKNOWN125087 - UNKNOWN125089)Greenfield138 kV100 MW3.0 yrs54.9
Greenfield (UNKNOWN124895 - UNKNOWN125230)Greenfield138 kV100 MW3.0 yrs52.5
5K CORP., INC. (ALL OTHER MOTOR VEHICLE PARTS MANUFACTURING)Manufacturing52.3
ALCAN PACKAGING, INC. (GLASS CONTAINER MANUFACTURING)Manufacturing52.3
LOWE'S PELLETS & GRAIN, INC. (OTHER ANIMAL FOOD MANUFACTURING)Manufacturing51.2
PRINTPACK, INC. (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing51.0
KS BEARINGS, INC. (MECHANICAL POWER TRANSMISSION EQUIPMENT MANUFACTURING)Manufacturing51.0
HONDA MANUFACTURING (NOT AVAILABLE)Manufacturing50.9
DRIQUIK, INC. (INDUSTRIAL PROCESS FURNACE AND OVEN MANUFACTURING)Manufacturing50.9
DELTA FAUCET CO. (PLUMBING FIXTURE FITTING AND TRIM MANUFACTURING)Manufacturing50.9
DEVELOPMENTAL SERVICES, INC. (PRINTED CIRCUIT ASSEMBLY (ELECTRONIC ASSEMBLY) MANUFACTURING)Manufacturing50.8
ACRO ENGINEERING, INC. (SPECIAL DIE AND TOOL, DIE SET, JIG, AND FIXTURE MANUFACTURING)Manufacturing50.8

DECATUR datacenter FAQ

How many datacenter sites are in DECATUR?
43 scored datacenter candidate sites, averaging 54.1/100 DC Readiness.
Does DECATUR offer datacenter tax incentives?
Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
What is the natural-hazard risk in DECATUR?
FEMA's National Risk Index rates DECATUR as "Relatively Moderate" (score 32).
What are industrial electricity rates in DECATUR?
Average industrial electricity is 8.54¢/kWh and commercial is 12.16¢/kWh in DECATUR.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for DECATUR, Indiana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.