5K CORP., INC. (ALL OTHER MOTOR VEHICLE PARTS MANUFACTURING)

Manufacturing

DECATUR, Indiana

DC Readiness
53.5
Fair / 100

5K CORP., INC. (ALL OTHER MOTOR VEHICLE PARTS MANUFACTURING) is a manufacturing datacenter candidate site in DECATUR, Indiana. It screens at 53.5/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

UtilityDUKE ENERGY INDIANA, LLCinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 3.5 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

Avg queue wait3.5 yrs

Connectivity

Nearest IXPDartPoints Columbus, IN - CLU1
IXP distance17.2 mi
Fiber providers5
Fiber coverage50.2%

Site characteristics

Site typeManufacturing

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score68/100

Location context

Nearest datacenterDatacenter 567894059
DC distance16.6 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.16¢/kWh
Industrial electricity8.54¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$9,415

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track 5K CORP., INC. (ALL OTHER MOTOR VEHICLE PARTS MANUFACTURING)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
49
Fiber connectivity12%
68
Energy cost10%
50
Water risk7%
90
Natural hazard6%
68
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in DECATUR, ranked by DC Readiness.

Sites near 5K CORP., INC. (ALL OTHER MOTOR VEHICLE PARTS MANUFACTURING)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN125230Substation-Adjacent138 kV100 MW3.8 yrs58.4
UNKNOWN125089Substation-Adjacent161 kV100 MW3.8 yrs57.7
UNKNOWN125096Substation-Adjacent138 kV100 MW3.8 yrs57.7
UNKNOWN125090Substation-Adjacent138 kV100 MW3.8 yrs57.2
UNKNOWN125095Substation-Adjacent69 kV50 MW3.8 yrs55.3
UNKNOWN125245Substation-Adjacent69 kV50 MW3.8 yrs54.9
UNKNOWN125517Substation-Adjacent69 kV50 MW3.8 yrs54.4
LOWE'S PELLETS & GRAIN, INC. (OTHER ANIMAL FOOD MANUFACTURING)Manufacturing——3.5 yrs53.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for 5K CORP., INC. (ALL OTHER MOTOR VEHICLE PARTS MANUFACTURING), DECATUR is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.