Datacenter Sites in CLAY, Indiana

CLAY has 62 scored datacenter candidate sites averaging 51.7/100 DC Readiness, with a catalogued aggregate of 450 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

CLAY, Indiana has 62 scored datacenter candidate sites averaging 51.7/100 DC Readiness, roughly in line with the Indiana average of 53.8. It ranks 43rd of 91 Indiana counties by number of sites and 79th by average score. The top-scoring site is Substation-Adjacent site · ce9db753 at 61.1/100.

62
Candidate sites
51.7/100
Avg DC Readiness
450 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in CLAY

Site-selection context for CLAY

Yessales_tax_exemption
Datacenter tax incentive
12.03¢/kWh
Commercial electricity
9.01¢/kWh
Industrial electricity
6
Fiber providers
Low
Water stress
$6,679
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

How does CLAY compare with other counties in Indiana?

By number of scored sites, CLAY ranks 43rd of the 91 Indiana counties with a county page, holding 0.7% of the state's 8,629 sites. Its average DC Readiness of 51.7/100 ranks 79th in the state and is roughly in line with the national average of 53.0. Nationally it has the 597th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 6 score 55 or higher.

What types of datacenter sites are in CLAY?

Former Mine sites are the most common (28, 45% of the county's inventory), followed by manufacturing (16) and industrial (9). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in CLAY?

Industrial electricity averages 9.01¢/kWh and commercial 12.03¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (32). WRI water stress is low. 6 fiber providers report service in the county. The climate runs 1,000 cooling degree days a year with a mean temperature of 52°F. Land is valued around $6,679 an acre.

By site type

Top datacenter sites in CLAY

Top datacenter sites in CLAY
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN124767Substation-Adjacent230 kV300 MW3.0 yrs61.1
EC Coal Clay CountyGreenfield——3.0 yrs59.0
EC Coal Clay CountyGreenfield——3.0 yrs57.8
EC Coal Clay CountyGreenfield——3.0 yrs57.6
EC FFE Clay CountyGreenfield——3.0 yrs57.0
EC Coal Clay CountyGreenfield——3.0 yrs56.7
TAP158610Substation-Adjacent69 kV50 MW3.0 yrs54.5
TAP158609Substation-Adjacent69 kV50 MW3.0 yrs54.4
CLAY CITYSubstation-Adjacent69 kV50 MW3.0 yrs54.4
PIKE LUMBER CO., INC. (CUT STOCK, RESAWING LUMBER, AND PLANING)Manufacturing——3.0 yrs51.2
Mine SiteFormer Mine——3.0 yrs51.2
Mine SiteFormer Mine——3.0 yrs51.2
Mine SiteFormer Mine——3.0 yrs51.2
Mine SiteFormer Mine——3.0 yrs51.2
CONEQTEC UNIVERSAL CONSTRUCTION PRODUCTS (NOT AVAILABLE)Manufacturing——3.0 yrs51.2
Pauls PlaceIndustrial——3.0 yrs51.2
Mine SiteFormer Mine——3.0 yrs51.1
Mine SiteFormer Mine——3.0 yrs51.0
Mine SiteFormer Mine——3.0 yrs51.0
Mine SiteFormer Mine——3.0 yrs51.0
Mine SiteFormer Mine——3.0 yrs50.9
Mine SiteFormer Mine——3.0 yrs50.9
GREAT DANE TRAILERS L. P. (TRUCK TRAILER MANUFACTURING)Manufacturing——3.0 yrs50.9
Clay County Health Care CenterIndustrial——3.0 yrs50.9
INDIANA OXIDE CORP. (ALL OTHER BASIC INORGANIC CHEMICAL MANUFACTURING)Manufacturing——3.0 yrs50.9

Every scored site in CLAY

All 62 sites, best first.

CLAY datacenter FAQ

How many datacenter sites are in CLAY?

62 scored datacenter candidate sites, averaging 51.7/100 DC Readiness. That is the 43rd-most of 91 Indiana counties with five or more sites.

What is the highest-scoring datacenter site in CLAY?

Substation-Adjacent site · ce9db753 scores 61.1/100 DC Readiness, the highest of the 62 scored sites in CLAY (a substation-adjacent site).

Does CLAY offer datacenter tax incentives?

Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

What is the natural-hazard risk in CLAY?

FEMA's National Risk Index rates CLAY as "Relatively Moderate" (score 32).

What are industrial electricity rates in CLAY?

Average industrial electricity is 9.01¢/kWh and commercial is 12.03¢/kWh in CLAY.

More in Indiana

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in CLAY, Indiana”, https://gridcensus.com/datacenter-sites/indiana/clay (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for CLAY, Indiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.