UNKNOWN124767

Substation-Adjacent

CLAY, Indiana · PJM

DC Readiness
59.2
Good / 100

UNKNOWN124767 is a substation-adjacent datacenter candidate site in CLAY, Indiana, interconnecting through PJM. It screens at 59.2/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN124767
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW
UtilityDUKE ENERGY INDIANA, LLCinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth62
Avg queue wait3.8 yrs

Connectivity

Nearest IXPIndiana University Data Center
IXP distance40.2 mi
Fiber providers6
Fiber coverage77.4%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score68/100

Location context

Nearest datacenterIU Data Center
DC distance40.2 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.03¢/kWh
Industrial electricity9.01¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$6,679

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN124767

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power20%
38
Fiber connectivity12%
68
Energy cost10%
50
Water risk7%
90
Natural hazard6%
68
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in CLAY, ranked by DC Readiness.

Sites near UNKNOWN124767
SiteTypeVoltageCapacityQueue waitScore
EC Coal Clay CountyGreenfield——3.0 yrs57.4
EC Coal Clay CountyGreenfield——3.0 yrs56.2
EC Coal Clay CountyGreenfield——3.0 yrs56.0
EC FFE Clay CountyGreenfield——3.0 yrs55.4
EC Coal Clay CountyGreenfield——3.0 yrs55.1
TAP158610Substation-Adjacent69 kV50 MW3.8 yrs52.7
TAP158609Substation-Adjacent69 kV50 MW3.8 yrs52.5
CLAY CITYSubstation-Adjacent69 kV50 MW3.8 yrs52.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.