Datacenter Sites in BARTHOLOMEW, Indiana

BARTHOLOMEW has 109 scored datacenter candidate sites averaging 56.2/100 DC Readiness, with a catalogued aggregate of 1,300 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

109
Candidate sites
56.2/100
Avg DC Readiness
1,300 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in BARTHOLOMEW

Site-selection context for BARTHOLOMEW

Yessales_tax_exemption
Datacenter tax incentive
11.87¢/kWh
Commercial electricity
8.84¢/kWh
Industrial electricity
9
Fiber providers
Low
Water stress
$6,180
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

By site type

Top datacenter sites in BARTHOLOMEW

Top datacenter sites in BARTHOLOMEW
SiteTypeVoltageCapacityQueue waitScore
COLUMBUS (345KV)Substation-Adjacent345 kV600 MW3.8 yrs66.3
OZ BartholomewGreenfield——3.0 yrs64.0
COLUMBUS DENOIS CREEKSubstation-Adjacent230 kV300 MW3.8 yrs63.4
UNKNOWN125100Substation-Adjacent230 kV300 MW3.8 yrs63.2
BOYER MACHINE & TOOL CO., INC. (MACHINE SHOPS)Manufacturing——3.5 yrs57.1
B B & H TOOL OF COLUMBUS, INC. (SPECIAL DIE AND TOOL, DIE SET, JIG, AND FIXTURE MANUFACTURING)Manufacturing——3.5 yrs57.1
CE-SYSTEMS (IRON FOUNDRIES)Manufacturing——3.5 yrs57.1
ROCK-TENN CO., PAPERBOARD PRODUCTS DIV. (PAPERBOARD MILLS)Manufacturing——3.5 yrs57.1
LNP ENGINEERING PLASTICS, INC. (CUSTOM COMPOUNDING OF PURCHASED RESINS)Manufacturing——3.5 yrs57.1
HRC ROOFING & SHEET METAL CO., INC. (NOT AVAILABLE)Manufacturing——3.5 yrs57.1
DAVID'S, INC. (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING)Manufacturing——3.5 yrs57.1
PYRAMID PAPER PRODUCTS (ALL OTHER CONVERTED PAPER PRODUCT MANUFACTURING)Manufacturing——3.5 yrs57.1
CALTHERM CORP. (TOTALIZING FLUID METER AND COUNTING DEVICE MANUFACTURING)Manufacturing——3.5 yrs57.1
INDIANA CUSTOM MACHINE & TOOL (MACHINE SHOPS)Manufacturing——3.5 yrs57.1
CENTRAL SHEET METAL CO., INC. (SHEET METAL WORK MANUFACTURING)Manufacturing——3.5 yrs57.1
PERMAWICK CO., INC. (BALL AND ROLLER BEARING MANUFACTURING)Manufacturing——3.5 yrs57.0
TOUCHDOWN MACHINE SHOP, INC. (MACHINE SHOPS)Manufacturing——3.5 yrs57.0
VOGEL BROS. CORP. (CUTLERY AND FLATWARE (EXCEPT PRECIOUS) MANUFACTURING)Manufacturing——3.5 yrs57.0
NAGAKURA ENGINEERING WORKS CO., INC. (IRON AND STEEL FORGING)Manufacturing——3.5 yrs57.0
SMURFIT-STONE CONTAINER CORP. (CORRUGATED AND SOLID FIBER BOX MANUFACTURING)Manufacturing——3.5 yrs57.0
TURNER'S MACHINING SPECIALTIES, INC. (MACHINE SHOPS)Manufacturing——3.5 yrs57.0
TOOL DYNAMICS (NOT AVAILABLE)Manufacturing——3.5 yrs57.0
EMCON TECHNOLOGIES, LLC (GASOLINE ENGINE AND ENGINE PARTS MANUFACTURING)Manufacturing——3.5 yrs57.0
HOPE SUPPLY, INC. (NOT AVAILABLE)Manufacturing——3.5 yrs57.0
KROOT CORP. (SECONDARY SMELTING, REFINING, AND ALLOYING OF NONFERROUS METAL (EXCEPT COPPER AND ALUMINUM))Manufacturing——3.5 yrs57.0

BARTHOLOMEW datacenter FAQ

How many datacenter sites are in BARTHOLOMEW?
109 scored datacenter candidate sites, averaging 56.2/100 DC Readiness.
Does BARTHOLOMEW offer datacenter tax incentives?
Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
What is the natural-hazard risk in BARTHOLOMEW?
FEMA's National Risk Index rates BARTHOLOMEW as "Relatively Moderate" (score 32).
What are industrial electricity rates in BARTHOLOMEW?
Average industrial electricity is 8.84¢/kWh and commercial is 11.87¢/kWh in BARTHOLOMEW.