Skip to content
Gridcensus

Datacenter Sites in ADAMS, Indiana

ADAMS has 59 scored datacenter candidate sites averaging 52.1/100 DC Readiness, with a catalogued aggregate of 250 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

59
Candidate sites
52.1/100
Avg DC Readiness
250 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in ADAMS

Site-selection context for ADAMS

Yessales_tax_exemption
Datacenter tax incentive
10.30¢/kWh
Commercial electricity
12.35¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$10,771
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

By site type

Top datacenter sites in ADAMS

Top datacenter sites in ADAMS
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN123163Substation-Adjacent138 kV100 MW3.8 yrs57.2
YOST BRIDGESubstation-Adjacent69 kV50 MW3.8 yrs55.0
UNKNOWN123164Substation-Adjacent138 kV100 MW3.8 yrs54.8
PRESTRESS SERVICES INDUSTRIES, LLC (OTHER CONCRETE PRODUCT MANUFACTURING)Manufacturing——3.5 yrs53.8
HOOSIER PATTERN, INC. (INDUSTRIAL PATTERN MANUFACTURING)Manufacturing——3.5 yrs53.7
LINGENFELTER PERFORMANCE ENGINEERING (GASOLINE ENGINE AND ENGINE PARTS MANUFACTURING)Manufacturing——3.5 yrs53.7
HOOSIER WOOD SPECIALTIES, INC. (NOT AVAILABLE)Manufacturing——3.5 yrs53.7
BUNGE NORTH AMERICA, INC. (SOYBEAN PROCESSING)Manufacturing——3.5 yrs53.7
ALBERDING WOODWORKING, INC. (MOTOR HOME MANUFACTURING)Manufacturing——3.5 yrs53.7
SILBERLINE MFG. CO., INC. (INORGANIC DYE AND PIGMENT MANUFACTURING)Manufacturing——3.5 yrs53.6
ESTEVES-DWD, LLC (SPECIAL DIE AND TOOL, DIE SET, JIG, AND FIXTURE MANUFACTURING)Manufacturing——3.5 yrs53.6
MID-STATES TOOL & MACHINE, INC. (INDUSTRIAL MOLD MANUFACTURING)Manufacturing——3.5 yrs53.6
UNIVERSAL METALCRAFT, INC. (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING)Manufacturing——3.5 yrs53.6
DRIGGS FARMS OF INDIANA, INC. (ICE CREAM AND FROZEN DESSERT MANUFACTURING)Manufacturing——3.5 yrs53.6
GILPIN, INC (ORNAMENTAL AND ARCHITECTURAL METAL WORK MANUFACTURING)Manufacturing——3.5 yrs53.6
GOLD SHIELD OF INDIANA, INC. (MINERAL WOOL MANUFACTURING)Manufacturing——3.5 yrs53.6
DECATUR DAILY DEMOCRAT (NOT AVAILABLE)Manufacturing——3.5 yrs53.6
PORTER, INC. (BOAT BUILDING)Manufacturing——3.5 yrs53.6
DOLCO PACKAGING (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing——3.5 yrs53.6
ALL AMERICAN HOMES OF INDIANA, LLC (PREFABRICATED WOOD BUILDING MANUFACTURING)Manufacturing——3.5 yrs53.5
FLEETWOOD MOTOR HOMES OF INDIANA, INC. (MOTOR HOME MANUFACTURING)Manufacturing——3.5 yrs53.5
PRECISION WOODCRAFTERS (ALL OTHER MISCELLANEOUS WOOD PRODUCT MANUFACTURING)Manufacturing——3.5 yrs53.5
TRI TEC SYSTEMS, INC. (OTHER FABRICATED WIRE PRODUCT MANUFACTURING)Manufacturing——3.5 yrs53.5
SP3 CUTTING TOOLS, INC. (CUTTING TOOL AND MACHINE TOOL ACCESSORY MANUFACTURING)Manufacturing——3.5 yrs53.2
STRICK CORP. (TRUCK TRAILER MANUFACTURING)Manufacturing——3.5 yrs52.7

ADAMS datacenter FAQ

How many datacenter sites are in ADAMS?
59 scored datacenter candidate sites, averaging 52.1/100 DC Readiness.
Does ADAMS offer datacenter tax incentives?
Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
What is the natural-hazard risk in ADAMS?
FEMA's National Risk Index rates ADAMS as "Relatively Moderate" (score 32).
What are industrial electricity rates in ADAMS?
Average industrial electricity is 12.35¢/kWh and commercial is 10.30¢/kWh in ADAMS.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ADAMS, Indiana. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.