Datacenter Sites in ADAMS, Indiana

ADAMS has 59 scored datacenter candidate sites averaging 49.9/100 DC Readiness, with a catalogued aggregate of 250 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

ADAMS, Indiana has 59 scored datacenter candidate sites averaging 49.9/100 DC Readiness, roughly in line with the Indiana average of 53.8. It ranks 48th of 91 Indiana counties by number of sites and 87th by average score. The top-scoring site is Substation-Adjacent site · 3b7e316c at 56.8/100.

59
Candidate sites
49.9/100
Avg DC Readiness
250 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in ADAMS

Site-selection context for ADAMS

Yessales_tax_exemption
Datacenter tax incentive
10.30¢/kWh
Commercial electricity
12.35¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$10,771
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

How does ADAMS compare with other counties in Indiana?

By number of scored sites, ADAMS ranks 48th of the 91 Indiana counties with a county page, holding 0.7% of the state's 8,629 sites. Its average DC Readiness of 49.9/100 ranks 87th in the state and is roughly in line with the national average of 53.0. Nationally it has the 634th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 1 score 55 or higher.

What types of datacenter sites are in ADAMS?

Manufacturing sites are the most common (41, 69% of the county's inventory), followed by industrial (14) and substation-adjacent (3). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in ADAMS?

Industrial electricity averages 12.35¢/kWh and commercial 10.30¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (32). WRI water stress is low. 7 fiber providers report service in the county. The climate runs 1,000 cooling degree days a year with a mean temperature of 52°F. Land is valued around $10,771 an acre.

By site type

Top datacenter sites in ADAMS

Top datacenter sites in ADAMS
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN123163Substation-Adjacent138 kV100 MW3.0 yrs56.8
YOST BRIDGESubstation-Adjacent69 kV50 MW3.0 yrs54.6
UNKNOWN123164Substation-Adjacent138 kV100 MW3.0 yrs54.5
PRESTRESS SERVICES INDUSTRIES, LLC (OTHER CONCRETE PRODUCT MANUFACTURING)Manufacturing——3.0 yrs50.8
HOOSIER WOOD SPECIALTIES, INC. (NOT AVAILABLE)Manufacturing——3.0 yrs50.7
LINGENFELTER PERFORMANCE ENGINEERING (GASOLINE ENGINE AND ENGINE PARTS MANUFACTURING)Manufacturing——3.0 yrs50.7
HOOSIER PATTERN, INC. (INDUSTRIAL PATTERN MANUFACTURING)Manufacturing——3.0 yrs50.6
GOLD SHIELD OF INDIANA, INC. (MINERAL WOOL MANUFACTURING)Manufacturing——3.0 yrs50.6
MID-STATES TOOL & MACHINE, INC. (INDUSTRIAL MOLD MANUFACTURING)Manufacturing——3.0 yrs50.6
J & D Real Estate VenturesIndustrial——3.0 yrs50.6
ESTEVES-DWD, LLC (SPECIAL DIE AND TOOL, DIE SET, JIG, AND FIXTURE MANUFACTURING)Manufacturing——3.0 yrs50.6
BUNGE NORTH AMERICA, INC. (SOYBEAN PROCESSING)Manufacturing——3.0 yrs50.6
PORTER, INC. (BOAT BUILDING)Manufacturing——3.0 yrs50.6
DOLCO PACKAGING (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing——3.0 yrs50.6
DRIGGS FARMS OF INDIANA, INC. (ICE CREAM AND FROZEN DESSERT MANUFACTURING)Manufacturing——3.0 yrs50.6
ALBERDING WOODWORKING, INC. (MOTOR HOME MANUFACTURING)Manufacturing——3.0 yrs50.6
SILBERLINE MFG. CO., INC. (INORGANIC DYE AND PIGMENT MANUFACTURING)Manufacturing——3.0 yrs50.6
UNIVERSAL METALCRAFT, INC. (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING)Manufacturing——3.0 yrs50.6
GILPIN, INC (ORNAMENTAL AND ARCHITECTURAL METAL WORK MANUFACTURING)Manufacturing——3.0 yrs50.6
GKB Entrprises LLCIndustrial——3.0 yrs50.5
Urban Habitat Preservation ProjectIndustrial——3.0 yrs50.5
AffolderIndustrial——3.0 yrs50.5
JC LLCIndustrial——3.0 yrs50.5
DECATUR DAILY DEMOCRAT (NOT AVAILABLE)Manufacturing——3.0 yrs50.5
TRI TEC SYSTEMS, INC. (OTHER FABRICATED WIRE PRODUCT MANUFACTURING)Manufacturing——3.0 yrs50.5

Every scored site in ADAMS

All 59 sites, best first.

ADAMS datacenter FAQ

How many datacenter sites are in ADAMS?

59 scored datacenter candidate sites, averaging 49.9/100 DC Readiness. That is the 48th-most of 91 Indiana counties with five or more sites.

What is the highest-scoring datacenter site in ADAMS?

Substation-Adjacent site · 3b7e316c scores 56.8/100 DC Readiness, the highest of the 59 scored sites in ADAMS (a substation-adjacent site).

Does ADAMS offer datacenter tax incentives?

Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

What is the natural-hazard risk in ADAMS?

FEMA's National Risk Index rates ADAMS as "Relatively Moderate" (score 32).

What are industrial electricity rates in ADAMS?

Average industrial electricity is 12.35¢/kWh and commercial is 10.30¢/kWh in ADAMS.

More in Indiana

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in ADAMS, Indiana”, https://gridcensus.com/datacenter-sites/indiana/adams (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for ADAMS, Indiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.