OZ Adams

Greenfield

ADAMS, Indiana · PJM

DC Readiness
51.2
Fair / 100

OZ Adams is a greenfield datacenter candidate site in ADAMS, Indiana, interconnecting through PJM. It screens at 51.2/100 DC Readiness and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.10¢/kWh
UtilityINDIANA MICHIGAN POWER COinvestor ownedmoderate to large load · terms ≥ 70 MWLarge Load / Industrial Power tariff (≥70 MW) · 80% min take · 12 yr

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth406
Avg queue wait3.0 yrs
Recent queue wait4.9 yrs
Completion rate14%
Withdrawal rate87%

Connectivity

Nearest IXPLifeline Ft Wayne
IXP distance29.1 mi
Fiber providers7
Fiber coverage55.0%
Nearest cloud providerAWS
Nearest cloud regionus-east-2
Cloud region distance111.6 mi

Site characteristics

Site typeGreenfield
Land contactAdams County Assessor
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops

Risk & environment

Environmental constraintLow (25/100)
Flood zoneZone AE (SFHA)
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score53/100
Construction cost index71.7 (avg 100)

Location context

Nearest datacenterMicrotronix Datacenter Ottoville
DC distance38.0 mi
Nearest rail12.8 mi
Nearest gas pipeline6.4 mi
Nearest fiber route72.4 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.30¢/kWh
Industrial electricity12.35¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$10,771

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track OZ Adams

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
42
Fiber connectivity12%
22
Energy cost10%
89
Water risk7%
92
Natural hazard6%
53
Buildability7%
65
Labor market4%
50
DC cluster4%
45
Land / acreage3%
42
Construction cost3%
90
Gas pipeline2%
79
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in ADAMS, ranked by DC Readiness.

Sites near OZ Adams
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN123163Substation-Adjacent138 kV100 MW3.0 yrs57.9
YOST BRIDGESubstation-Adjacent69 kV50 MW3.0 yrs55.8
UNKNOWN123164Substation-Adjacent138 kV100 MW3.0 yrs55.6
PRESTRESS SERVICES INDUSTRIES, LLC (OTHER CONCRETE PRODUCT MANUFACTURING)Manufacturing——3.0 yrs51.9
HOOSIER WOOD SPECIALTIES, INC. (NOT AVAILABLE)Manufacturing——3.0 yrs51.8
ALBERDING WOODWORKING, INC. (MOTOR HOME MANUFACTURING)Manufacturing——3.0 yrs51.8
HOOSIER PATTERN, INC. (INDUSTRIAL PATTERN MANUFACTURING)Manufacturing——3.0 yrs51.8
LINGENFELTER PERFORMANCE ENGINEERING (GASOLINE ENGINE AND ENGINE PARTS MANUFACTURING)Manufacturing——3.0 yrs51.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for OZ Adams, ADAMS is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.