Lafayette has 5 scored datacenter candidate sites averaging 54.0/100 DC Readiness, with a catalogued aggregate of 150 MW. FEMA rates local natural-hazard risk as "Very High". The county has a datacenter tax incentive on record.

5
Candidate sites
54.0/100
Avg DC Readiness
150 MW
Catalogued capacity
theoretical aggregate
Very High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 5 in Lafayette

Site-selection context for Lafayette

Yessales_tax_exemption
Datacenter tax incentive
13.19¢/kWh
Commercial electricity
8.64¢/kWh
Industrial electricity
4
Fiber providers
Low-Medium
Water stress
$4,741
Land price / acre
3,500
Cooling degree days
700
Heating degree days
72°F
Mean annual temp

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

By site type

Top datacenter sites in Lafayette

Top datacenter sites in Lafayette
SiteTypeVoltageCapacityQueue waitScore
OZ LafayetteGreenfield3.6 yrs57.6
UNKNOWN107670Substation-Adjacent69 kV50 MW1.0 yrs55.2
UNKNOWN108407Substation-Adjacent69 kV50 MW1.0 yrs54.5
TAP154628Substation-Adjacent69 kV50 MW1.0 yrs54.4
Mine SiteFormer Mine1.0 yrs48.5

Lafayette datacenter FAQ

How many datacenter sites are in Lafayette?
5 scored datacenter candidate sites, averaging 54.0/100 DC Readiness.
Does Lafayette offer datacenter tax incentives?
Sales tax exemption on manufacturing machinery including servers; no state income tax.
What is the natural-hazard risk in Lafayette?
FEMA's National Risk Index rates Lafayette as "Very High" (score 55).
What are industrial electricity rates in Lafayette?
Average industrial electricity is 8.64¢/kWh and commercial is 13.19¢/kWh in Lafayette.