Skip to content
Gridcensus

Datacenter Sites in Bay County, Florida

Bay County has 53 scored datacenter candidate sites averaging 54.3/100 DC Readiness, with a catalogued aggregate of 4,200 MW. FEMA rates local natural-hazard risk as "Very High". The county has a datacenter tax incentive on record.

At a glance

Bay County, Florida has 53 scored datacenter candidate sites averaging 54.3/100 DC Readiness, roughly in line with the Florida average of 56.0. It ranks 19th of 66 Florida counties by number of sites and 36th by average score. The top-scoring site is Substation-Adjacent site · 6478c8d4 at 61.8/100.

53
Candidate sites
54.3/100
Avg DC Readiness
4,200 MW
Catalogued capacity
theoretical aggregate
Very High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Bay County

Site-selection context for Bay County

Yessales_tax_exemption
Datacenter tax incentive
13.60¢/kWh
Commercial electricity
6.77¢/kWh
Industrial electricity
11
Fiber providers
Low-Medium
Water stress
$5,992
Land price / acre
3,500
Cooling degree days
700
Heating degree days
72°F
Mean annual temp

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

How does Bay County compare with other counties in Florida?

By number of scored sites, Bay County ranks 19th of the 66 Florida counties with a county page, holding 1.2% of the state's 4,344 sites. Its average DC Readiness of 54.3/100 ranks 36th in the state and is roughly in line with the national average of 53.0. Nationally it has the 710th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 33 score 55 or higher.

What types of datacenter sites are in Bay County?

Substation-Adjacent sites are the most common (29, 55% of the county's inventory), followed by greenfield (15) and industrial (4). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Bay County?

Industrial electricity averages 6.77¢/kWh and commercial 13.60¢/kWh. FEMA's National Risk Index rates the county "Very High" (55). WRI water stress is low-medium. 11 fiber providers report service in the county. The climate runs 3,500 cooling degree days a year with a mean temperature of 72°F. Land is valued around $5,992 an acre.

By site type

Top datacenter sites in Bay County

Top datacenter sites in Bay County
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN108172Substation-Adjacent230 kV300 MW3.7 yrs61.8
HIGHLAND CITYSubstation-Adjacent230 kV300 MW3.7 yrs60.8
UNKNOWN108173Substation-Adjacent230 kV300 MW3.7 yrs59.9
LAGUNA BEACHSubstation-Adjacent230 kV300 MW3.7 yrs59.8
CALLAWAYSubstation-Adjacent230 kV300 MW3.7 yrs59.7
OZ BayGreenfield——3.7 yrs59.7
EC Coal Bay CountyGreenfield——3.7 yrs59.1
EC Coal Bay CountyGreenfield——3.7 yrs58.7
EC Coal Bay CountyGreenfield——3.7 yrs57.6
SHIPYARDSubstation-Adjacent115 kV100 MW3.7 yrs56.4
GREENWOODSubstation-Adjacent115 kV100 MW3.7 yrs56.4
REDWOODSubstation-Adjacent115 kV100 MW3.7 yrs56.3
NORTHSIDESubstation-Adjacent115 kV100 MW3.7 yrs56.2
TAP142394Substation-Adjacent115 kV100 MW3.7 yrs56.2
HATHAWAYSubstation-Adjacent115 kV100 MW3.7 yrs56.2
HOLIDAYSubstation-Adjacent115 kV100 MW3.7 yrs56.1
TAP143303Substation-Adjacent115 kV100 MW3.7 yrs56.0
NORTH BAYSubstation-Adjacent115 kV100 MW3.7 yrs56.0
LONG BEACHSubstation-Adjacent115 kV100 MW3.7 yrs56.0
UNKNOWN108185Substation-Adjacent115 kV100 MW3.7 yrs55.8
TAP142393Substation-Adjacent115 kV100 MW3.7 yrs55.6
LULLWATERSubstation-Adjacent115 kV100 MW3.7 yrs55.6
UNKNOWN121007Substation-Adjacent115 kV100 MW3.7 yrs55.6
WEWA ROADSubstation-Adjacent115 kV100 MW3.7 yrs55.5
TAP161528Substation-Adjacent115 kV100 MW3.7 yrs55.5

Every scored site in Bay County

All 53 sites, best first.

Bay County datacenter FAQ

How many datacenter sites are in Bay County?

53 scored datacenter candidate sites, averaging 54.3/100 DC Readiness. That is the 19th-most of 66 Florida counties with five or more sites.

What is the highest-scoring datacenter site in Bay County?

Substation-Adjacent site · 6478c8d4 scores 61.8/100 DC Readiness, the highest of the 53 scored sites in Bay County (a substation-adjacent site).

Does Bay County offer datacenter tax incentives?

Sales tax exemption on manufacturing machinery including servers; no state income tax.

What is the natural-hazard risk in Bay County?

FEMA's National Risk Index rates Bay County as "Very High" (score 55).

What are industrial electricity rates in Bay County?

Average industrial electricity is 6.77¢/kWh and commercial is 13.60¢/kWh in Bay County.

More in Florida

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Bay County, Florida”, https://gridcensus.com/datacenter-sites/florida/bay-county (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Bay County, Florida is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.