Datacenter Sites in Alachua, Florida

Alachua has 49 scored datacenter candidate sites averaging 61.4/100 DC Readiness, with a catalogued aggregate of 3,843 MW. FEMA rates local natural-hazard risk as "Very High". The county has a datacenter tax incentive on record.

49
Candidate sites
61.4/100
Avg DC Readiness
3,843 MW
Catalogued capacity
theoretical aggregate
Very High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Alachua

Site-selection context for Alachua

Yessales_tax_exemption
Datacenter tax incentive
12.69¢/kWh
Commercial electricity
9.05¢/kWh
Industrial electricity
12
Fiber providers
Low-Medium
Water stress
$8,209
Land price / acre
3,500
Cooling degree days
700
Heating degree days
72°F
Mean annual temp

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

By site type

Top datacenter sites in Alachua

Top datacenter sites in Alachua
SiteTypeVoltageCapacityQueue waitScore
OZ AlachuaGreenfield3.6 yrs63.9
EC Near John R KellyGreenfield3.6 yrs63.1
EC Near John R KellyGreenfield3.6 yrs62.9
OZ AlachuaGreenfield3.6 yrs62.8
PARKERSubstation-Adjacent230 kV300 MW1.0 yrs59.7
EC Near John R KellyGreenfield3.6 yrs59.7
ARCHERSubstation-Adjacent230 kV300 MW1.0 yrs59.7
EC Near John R KellyGreenfield3.6 yrs59.6
EC Near John R KellyGreenfield3.6 yrs58.7
EC Near John R KellyGreenfield3.6 yrs57.6
MCMICHENSubstation-Adjacent138 kV100 MW1.0 yrs56.5
EC Near John R KellyGreenfield3.6 yrs55.9
JOHN KELLYSubstation-Adjacent138 kV100 MW1.0 yrs55.8
DEERHAVENSubstation-Adjacent138 kV100 MW1.0 yrs55.7
TAP151115Substation-Adjacent138 kV100 MW1.0 yrs55.7
IDYLWILDSubstation-Adjacent138 kV100 MW1.0 yrs55.7
KANAPAHASubstation-Adjacent138 kV100 MW1.0 yrs55.7
MILLHOPPERSubstation-Adjacent138 kV100 MW1.0 yrs55.7
UNKNOWN150439Substation-Adjacent138 kV100 MW1.0 yrs55.7
TAP143299Substation-Adjacent138 kV100 MW1.0 yrs55.7
SUGARFOOTSubstation-Adjacent138 kV100 MW1.0 yrs55.7
SERENOLASubstation-Adjacent138 kV100 MW1.0 yrs55.7
UNKNOWN152760Substation-Adjacent138 kV100 MW1.0 yrs55.7
UNKNOWN108209Substation-Adjacent138 kV100 MW1.0 yrs55.7
GE ALACHUASubstation-Adjacent138 kV100 MW1.0 yrs55.7

Alachua datacenter FAQ

How many datacenter sites are in Alachua?
49 scored datacenter candidate sites, averaging 61.4/100 DC Readiness.
Does Alachua offer datacenter tax incentives?
Sales tax exemption on manufacturing machinery including servers; no state income tax.
What is the natural-hazard risk in Alachua?
FEMA's National Risk Index rates Alachua as "Very High" (score 55).
What are industrial electricity rates in Alachua?
Average industrial electricity is 9.05¢/kWh and commercial is 12.69¢/kWh in Alachua.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Alachua, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.