Datacenter Sites in Alachua, Florida
Alachua has 49 scored datacenter candidate sites averaging 61.4/100 DC Readiness, with a catalogued aggregate of 3,843 MW. FEMA rates local natural-hazard risk as "Very High". The county has a datacenter tax incentive on record.
49
Candidate sites
61.4/100
Avg DC Readiness
3,843 MW
Catalogued capacity
theoretical aggregate
Very High
Hazard rating
Site-selection context for Alachua
Yessales_tax_exemption
Datacenter tax incentive
12.69¢/kWh
Commercial electricity
9.05¢/kWh
Industrial electricity
12
Fiber providers
Low-Medium
Water stress
$8,209
Land price / acre
3,500
Cooling degree days
700
Heating degree days
72°F
Mean annual temp
Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.
By site type
Top datacenter sites in Alachua
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| OZ Alachua | Greenfield | — | — | 3.6 yrs | 63.9 |
| EC Near John R Kelly | Greenfield | — | — | 3.6 yrs | 63.1 |
| EC Near John R Kelly | Greenfield | — | — | 3.6 yrs | 62.9 |
| OZ Alachua | Greenfield | — | — | 3.6 yrs | 62.8 |
| PARKER | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 59.7 |
| EC Near John R Kelly | Greenfield | — | — | 3.6 yrs | 59.7 |
| ARCHER | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 59.7 |
| EC Near John R Kelly | Greenfield | — | — | 3.6 yrs | 59.6 |
| EC Near John R Kelly | Greenfield | — | — | 3.6 yrs | 58.7 |
| EC Near John R Kelly | Greenfield | — | — | 3.6 yrs | 57.6 |
| MCMICHEN | Substation-Adjacent | 138 kV | 100 MW | 1.0 yrs | 56.5 |
| EC Near John R Kelly | Greenfield | — | — | 3.6 yrs | 55.9 |
| JOHN KELLY | Substation-Adjacent | 138 kV | 100 MW | 1.0 yrs | 55.8 |
| DEERHAVEN | Substation-Adjacent | 138 kV | 100 MW | 1.0 yrs | 55.7 |
| TAP151115 | Substation-Adjacent | 138 kV | 100 MW | 1.0 yrs | 55.7 |
| IDYLWILD | Substation-Adjacent | 138 kV | 100 MW | 1.0 yrs | 55.7 |
| KANAPAHA | Substation-Adjacent | 138 kV | 100 MW | 1.0 yrs | 55.7 |
| MILLHOPPER | Substation-Adjacent | 138 kV | 100 MW | 1.0 yrs | 55.7 |
| UNKNOWN150439 | Substation-Adjacent | 138 kV | 100 MW | 1.0 yrs | 55.7 |
| TAP143299 | Substation-Adjacent | 138 kV | 100 MW | 1.0 yrs | 55.7 |
| SUGARFOOT | Substation-Adjacent | 138 kV | 100 MW | 1.0 yrs | 55.7 |
| SERENOLA | Substation-Adjacent | 138 kV | 100 MW | 1.0 yrs | 55.7 |
| UNKNOWN152760 | Substation-Adjacent | 138 kV | 100 MW | 1.0 yrs | 55.7 |
| UNKNOWN108209 | Substation-Adjacent | 138 kV | 100 MW | 1.0 yrs | 55.7 |
| GE ALACHUA | Substation-Adjacent | 138 kV | 100 MW | 1.0 yrs | 55.7 |
Alachua datacenter FAQ
- How many datacenter sites are in Alachua?
- 49 scored datacenter candidate sites, averaging 61.4/100 DC Readiness.
- Does Alachua offer datacenter tax incentives?
- Sales tax exemption on manufacturing machinery including servers; no state income tax.
- What is the natural-hazard risk in Alachua?
- FEMA's National Risk Index rates Alachua as "Very High" (score 55).
- What are industrial electricity rates in Alachua?
- Average industrial electricity is 9.05¢/kWh and commercial is 12.69¢/kWh in Alachua.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Alachua, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.