Datacenter Sites in Phillips, Arkansas

Phillips has 34 scored datacenter candidate sites averaging 51.0/100 DC Readiness, with a catalogued aggregate of 1,600 MW. FEMA rates local natural-hazard risk as "Relatively High".

34
Candidate sites
51.0/100
Avg DC Readiness
1,600 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Phillips

Site-selection context for Phillips

No
Datacenter tax incentive
10.41¢/kWh
Commercial electricity
11.54¢/kWh
Industrial electricity
2
Fiber providers
Low
Water stress
$3,345
Land price / acre
1,900
Cooling degree days
3,400
Heating degree days
60°F
Mean annual temp

By site type

Top datacenter sites in Phillips

Top datacenter sites in Phillips
SiteTypeVoltageCapacityQueue waitScore
RITCHIE STATIONSubstation-Adjacent230 kV300 MW2.8 yrs60.9
TAP149969Substation-Adjacent230 kV300 MW2.8 yrs56.1
TAP149970Substation-Adjacent230 kV300 MW2.8 yrs56.0
EC Near Robert E RitchieGreenfield1.4 yrs55.9
EC Near Robert E RitchieGreenfield1.4 yrs55.1
EC Near Robert E RitchieGreenfield1.4 yrs55.0
EC Near Robert E RitchieGreenfield1.4 yrs55.0
EC Near Robert E RitchieGreenfield1.4 yrs54.6
EC Near Robert E RitchieGreenfield1.4 yrs53.9
EC Near Robert E RitchieGreenfield1.4 yrs53.7
EC Near Robert E RitchieGreenfield1.4 yrs53.6
OZ PhillipsGreenfield1.4 yrs53.4
EC FFE Phillips CountyGreenfield1.4 yrs53.3
TAP149968Substation-Adjacent115 kV100 MW2.8 yrs52.4
UNKNOWN121328Substation-Adjacent115 kV100 MW2.8 yrs52.4
UNKNOWN121326Substation-Adjacent115 kV100 MW2.8 yrs52.3
UNKNOWN121327Substation-Adjacent115 kV100 MW2.8 yrs52.2
UNKNOWN107728Substation-Adjacent115 kV100 MW2.8 yrs52.1
UNKNOWN121329Substation-Adjacent115 kV100 MW2.8 yrs51.6
EC Near Robert E RitchieGreenfield1.4 yrs50.9
UNKNOWN107729Substation-Adjacent115 kV100 MW2.8 yrs50.9
Helena High SchoolIndustrial2.8 yrs46.5
Staton Auto RepairIndustrial2.8 yrs46.5
McVey PropertyIndustrial2.8 yrs46.5
Phillips County Library Vacant LotIndustrial2.8 yrs46.4

Phillips datacenter FAQ

How many datacenter sites are in Phillips?
34 scored datacenter candidate sites, averaging 51.0/100 DC Readiness.
Does Phillips offer datacenter tax incentives?
No datacenter-specific tax incentive is on record for Phillips in our dataset.
What is the natural-hazard risk in Phillips?
FEMA's National Risk Index rates Phillips as "Relatively High" (score 38).
What are industrial electricity rates in Phillips?
Average industrial electricity is 11.54¢/kWh and commercial is 10.41¢/kWh in Phillips.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Phillips, Arkansas. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.