TAP149969 is a substation-adjacent datacenter candidate site in Phillips, Arkansas, interconnecting through MISO. It screens at 56.1/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP149969
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW
UtilityENTERGY ARKANSAS LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth136
Avg queue wait2.8 yrs

Connectivity

Nearest IXPARE-ON Forrest City
IXP distance39.5 mi
Fiber providers2
Fiber coverage7.7%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score62/100

Location context

Nearest datacenterARE-ON Forrest City
DC distance39.5 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveNo
Commercial electricity10.41¢/kWh
Industrial electricity11.54¢/kWh
Cooling degree days1,900
Heating degree days3,400
Land price / acre$3,345

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP149969

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power20%
46
Fiber connectivity12%
45
Energy cost10%
50
Water risk7%
84
Natural hazard6%
62
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
49
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
30

Nearby comparable sites

Other scored datacenter candidate sites in Phillips, ranked by DC Readiness.

Sites near TAP149969
SiteTypeVoltageCapacityQueue waitScore
RITCHIE STATIONSubstation-Adjacent230 kV300 MW2.8 yrs60.9
TAP149970Substation-Adjacent230 kV300 MW2.8 yrs56.0
EC Near Robert E RitchieGreenfield1.4 yrs55.9
EC Near Robert E RitchieGreenfield1.4 yrs55.1
EC Near Robert E RitchieGreenfield1.4 yrs55.0
EC Near Robert E RitchieGreenfield1.4 yrs55.0
EC Near Robert E RitchieGreenfield1.4 yrs54.6
EC Near Robert E RitchieGreenfield1.4 yrs53.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP149969, Phillips. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.