Datacenter Sites in Delaware, Oklahoma

Delaware has 31 scored datacenter candidate sites averaging 54.8/100 DC Readiness, with a catalogued aggregate of 2,200 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

Delaware, Oklahoma has 31 scored datacenter candidate sites averaging 54.8/100 DC Readiness, roughly in line with the Oklahoma average of 52.8. It ranks 35th of 76 Oklahoma counties by number of sites and 16th by average score. The top-scoring site is Substation-Adjacent site · 245edce4 at 63.7/100.

31
Candidate sites
54.8/100
Avg DC Readiness
2,200 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Delaware

Site-selection context for Delaware

Yessales_tax_exemption
Datacenter tax incentive
11.30¢/kWh
Commercial electricity
8.66¢/kWh
Industrial electricity
10
Fiber providers
Low-Medium
Water stress
$3,409
Land price / acre
1,900
Cooling degree days
3,600
Heating degree days
60°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.

How does Delaware compare with other counties in Oklahoma?

By number of scored sites, Delaware ranks 35th of the 76 Oklahoma counties with a county page, holding 0.8% of the state's 3,723 sites. Its average DC Readiness of 54.8/100 ranks 16th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1237th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 14 score 55 or higher.

What types of datacenter sites are in Delaware?

Substation-Adjacent sites are the most common (23, 74% of the county's inventory), followed by industrial (3) and greenfield (2). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Delaware?

Industrial electricity averages 8.66¢/kWh and commercial 11.30¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (42). WRI water stress is low-medium. 10 fiber providers report service in the county. The climate runs 1,900 cooling degree days a year with a mean temperature of 60°F. Land is valued around $3,409 an acre.

By site type

Top datacenter sites in Delaware

Top datacenter sites in Delaware
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN133415Substation-Adjacent345 kV600 MW4.3 yrs63.7
UNKNOWN119193Substation-Adjacent161 kV100 MW4.3 yrs58.1
TAP159796Substation-Adjacent161 kV100 MW4.3 yrs57.9
UNKNOWN119229Substation-Adjacent161 kV100 MW4.3 yrs57.9
UNKNOWN119194Substation-Adjacent161 kV100 MW4.3 yrs57.6
UNKNOWN118668Substation-Adjacent161 kV100 MW4.3 yrs57.6
UNKNOWN119236Substation-Adjacent138 kV100 MW4.3 yrs57.2
UNKNOWN119240Substation-Adjacent138 kV100 MW4.3 yrs57.2
OZ DelawareGreenfield——4.3 yrs56.5
UNKNOWN119241Substation-Adjacent138 kV100 MW4.3 yrs56.4
UNKNOWN159798Substation-Adjacent69 kV50 MW4.3 yrs55.2
TAP168578Substation-Adjacent69 kV50 MW4.3 yrs55.1
UNKNOWN168577Substation-Adjacent69 kV50 MW4.3 yrs55.1
UNKNOWN168580Substation-Adjacent69 kV50 MW4.3 yrs55.0
UNKNOWN107922Substation-Adjacent69 kV50 MW4.3 yrs54.9
TAP159797Substation-Adjacent69 kV50 MW4.3 yrs54.9
TAP168579Substation-Adjacent69 kV50 MW4.3 yrs54.9
UNKNOWN117649Substation-Adjacent69 kV50 MW3.9 yrs54.8
UNKNOWN119237Substation-Adjacent69 kV50 MW4.3 yrs54.6
UNKNOWN148805Substation-Adjacent69 kV50 MW4.3 yrs54.2
TAP149106Substation-Adjacent69 kV50 MW4.3 yrs54.2
UNKNOWN119235Substation-Adjacent69 kV50 MW4.3 yrs54.2
UNKNOWN119230Substation-Adjacent69 kV50 MW4.3 yrs54.0
UNKNOWN119245Substation-Adjacent69 kV50 MW4.3 yrs53.8
Greenfield (UNKNOWN119193 - TAP159796)Greenfield161 kV100 MW4.3 yrs51.8

Every scored site in Delaware

All 31 sites, best first.

Delaware datacenter FAQ

How many datacenter sites are in Delaware?

31 scored datacenter candidate sites, averaging 54.8/100 DC Readiness. That is the 35th-most of 76 Oklahoma counties with five or more sites.

What is the highest-scoring datacenter site in Delaware?

Substation-Adjacent site · 245edce4 scores 63.7/100 DC Readiness, the highest of the 31 scored sites in Delaware (a substation-adjacent site).

Does Delaware offer datacenter tax incentives?

Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.

What is the natural-hazard risk in Delaware?

FEMA's National Risk Index rates Delaware as "Relatively High" (score 42).

What are industrial electricity rates in Delaware?

Average industrial electricity is 8.66¢/kWh and commercial is 11.30¢/kWh in Delaware.

More in Oklahoma

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Delaware, Oklahoma”, https://gridcensus.com/datacenter-sites/oklahoma/delaware (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Delaware, Oklahoma is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.