Skip to content
Gridcensus

Datacenter Sites in Canadian County, Oklahoma

Canadian County has 43 scored datacenter candidate sites averaging 58.5/100 DC Readiness, with a catalogued aggregate of 5,850 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

Canadian County, Oklahoma has 43 scored datacenter candidate sites averaging 58.5/100 DC Readiness, about 11% above the Oklahoma average of 52.8. It ranks 20th of 76 Oklahoma counties by number of sites and 1st by average score. The top-scoring site is CIMARRON at 66.3/100.

43
Candidate sites
58.5/100
Avg DC Readiness
5,850 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Canadian County

Site-selection context for Canadian County

Yessales_tax_exemption
Datacenter tax incentive
9.70¢/kWh
Commercial electricity
5.82¢/kWh
Industrial electricity
9
Fiber providers
Low-Medium
Water stress
$3,406
Land price / acre
1,900
Cooling degree days
3,600
Heating degree days
60°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.

How does Canadian County compare with other counties in Oklahoma?

By number of scored sites, Canadian County ranks 20th of the 76 Oklahoma counties with a county page, holding 1.2% of the state's 3,723 sites. Its average DC Readiness of 58.5/100 ranks 1st in the state and is about 10% above the national average of 53.0. Nationally it has the 887th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 32 score 55 or higher.

What types of datacenter sites are in Canadian County?

Substation-Adjacent sites are the most common (28, 65% of the county's inventory), followed by greenfield (7) and former mine (4). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Canadian County?

Industrial electricity averages 5.82¢/kWh and commercial 9.70¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (42). WRI water stress is low-medium. 9 fiber providers report service in the county. The climate runs 1,900 cooling degree days a year with a mean temperature of 60°F. Land is valued around $3,406 an acre.

By site type

Top datacenter sites in Canadian County

Top datacenter sites in Canadian County
SiteTypeVoltageCapacityQueue waitScore
CIMARRONSubstation-Adjacent345 kV600 MW4.3 yrs66.3
EC Near MustangGreenfield——4.3 yrs65.8
MATHEWSONSubstation-Adjacent345 kV600 MW4.3 yrs65.6
EC Near MustangGreenfield——4.3 yrs65.1
EC Near MustangGreenfield——4.3 yrs64.0
MINCOSubstation-Adjacent345 kV600 MW4.3 yrs63.6
UNKNOWN119062Substation-Adjacent345 kV600 MW4.3 yrs63.6
EC Near MustangGreenfield——4.3 yrs63.1
UNKNOWN119132Substation-Adjacent345 kV600 MW4.3 yrs62.9
UNKNOWN118467Substation-Adjacent138 kV100 MW4.3 yrs61.7
UNKNOWN118465Substation-Adjacent138 kV100 MW4.3 yrs60.8
UNKNOWN118518Substation-Adjacent138 kV100 MW4.3 yrs60.7
UNKNOWN118464Substation-Adjacent138 kV100 MW4.3 yrs60.6
UNKNOWN118463Substation-Adjacent138 kV100 MW4.3 yrs60.6
UNKNOWN119066Substation-Adjacent138 kV100 MW4.3 yrs60.5
UNKNOWN119065Substation-Adjacent138 kV100 MW4.3 yrs60.4
Greenfield (CIMARRON - MINCO)Greenfield345 kV600 MW4.3 yrs60.0
UNKNOWN168552Substation-Adjacent138 kV100 MW4.3 yrs59.8
TAP149226Substation-Adjacent138 kV100 MW4.3 yrs59.8
TAP168551Substation-Adjacent138 kV100 MW4.3 yrs58.8
EL RENOSubstation-Adjacent138 kV100 MW4.3 yrs58.8
EL RENOSubstation-Adjacent138 kV100 MW4.3 yrs58.7
UNKNOWN118516Substation-Adjacent138 kV100 MW4.3 yrs58.5
UNKNOWN118466Substation-Adjacent69 kV50 MW4.3 yrs58.2
UNKNOWN119067Substation-Adjacent69 kV50 MW4.3 yrs58.1

Every scored site in Canadian County

All 43 sites, best first.

Canadian County datacenter FAQ

How many datacenter sites are in Canadian County?

43 scored datacenter candidate sites, averaging 58.5/100 DC Readiness. That is the 20th-most of 76 Oklahoma counties with five or more sites.

What is the highest-scoring datacenter site in Canadian County?

CIMARRON scores 66.3/100 DC Readiness, the highest of the 43 scored sites in Canadian County (a substation-adjacent site).

Does Canadian County offer datacenter tax incentives?

Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.

What is the natural-hazard risk in Canadian County?

FEMA's National Risk Index rates Canadian County as "Relatively High" (score 42).

What are industrial electricity rates in Canadian County?

Average industrial electricity is 5.82¢/kWh and commercial is 9.70¢/kWh in Canadian County.

More in Oklahoma

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Canadian County, Oklahoma”, https://gridcensus.com/datacenter-sites/oklahoma/canadian-county (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Canadian County, Oklahoma is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.