Datacenter Sites in Caddo County, Oklahoma

Caddo County has 138 scored datacenter candidate sites averaging 50.8/100 DC Readiness, with a catalogued aggregate of 3,050 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

Caddo County, Oklahoma has 138 scored datacenter candidate sites averaging 50.8/100 DC Readiness, roughly in line with the Oklahoma average of 52.9. It ranks 6th of 76 Oklahoma counties by number of sites and 66th by average score. The top-scoring site is Substation-Adjacent site · f457ee77 at 62.9/100.

138
Candidate sites
50.8/100
Avg DC Readiness
3,050 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Caddo County

Site-selection context for Caddo County

Yessales_tax_exemption
Datacenter tax incentive
9.18¢/kWh
Commercial electricity
5.87¢/kWh
Industrial electricity
8
Fiber providers
Low-Medium
Water stress
$2,275
Land price / acre
1,900
Cooling degree days
3,600
Heating degree days
60°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.

How does Caddo County compare with other counties in Oklahoma?

By number of scored sites, Caddo County ranks 6th of the 76 Oklahoma counties with a county page, holding 3.7% of the state's 3,727 sites. Its average DC Readiness of 50.8/100 ranks 66th in the state and is roughly in line with the national average of 53.0. Nationally it has the 196th-largest site inventory of 2,943 counties with five or more sites. 0 sites score 70 or higher and 24 score 55 or higher.

What types of datacenter sites are in Caddo County?

Federal Excess sites are the most common (81, 59% of the county's inventory), followed by substation-adjacent (26) and industrial (14). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Caddo County?

Industrial electricity averages 5.87¢/kWh and commercial 9.18¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (42). WRI water stress is low-medium. 8 fiber providers report service in the county. The climate runs 1,900 cooling degree days a year with a mean temperature of 60°F. Land is valued around $2,275 an acre.

By site type

Top datacenter sites in Caddo County

Top datacenter sites in Caddo County
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN119132Substation-Adjacent345 kV600 MW4.3 yrs62.9
EC Near Anadarko PlantGreenfield——4.3 yrs59.7
EC Near Anadarko PlantGreenfield——4.3 yrs59.7
EC Near Anadarko PlantGreenfield——4.3 yrs59.7
EC Near Anadarko PlantGreenfield——4.3 yrs59.4
EC Near Anadarko PlantGreenfield——4.3 yrs58.3
EC Near Anadarko PlantGreenfield——4.3 yrs57.9
UNKNOWN161775Substation-Adjacent138 kV100 MW4.3 yrs56.7
UNKNOWN118959Substation-Adjacent138 kV100 MW4.3 yrs56.4
TAP149168Substation-Adjacent138 kV100 MW4.3 yrs56.4
TAP149167Substation-Adjacent138 kV100 MW4.3 yrs56.3
HINTONSubstation-Adjacent138 kV100 MW4.3 yrs56.2
ANANDARKOSubstation-Adjacent138 kV100 MW4.3 yrs56.1
UNKNOWN118961Substation-Adjacent138 kV100 MW4.3 yrs56.1
UNKNOWN118665Substation-Adjacent138 kV100 MW4.3 yrs55.9
UNKNOWN118953Substation-Adjacent138 kV100 MW4.3 yrs55.7
UNKNOWN118809Substation-Adjacent138 kV100 MW4.3 yrs55.6
UNKNOWN118955Substation-Adjacent138 kV100 MW4.3 yrs55.4
TAP149754Substation-Adjacent138 kV100 MW4.3 yrs55.3
TAP149488Substation-Adjacent138 kV100 MW4.3 yrs55.2
TAP159835Substation-Adjacent138 kV100 MW4.3 yrs55.1
UNKNOWN159834Substation-Adjacent138 kV100 MW4.3 yrs55.1
UNKNOWN118506Substation-Adjacent138 kV100 MW4.3 yrs55.0
TAP159836Substation-Adjacent138 kV100 MW4.3 yrs55.0
TAP149163Substation-Adjacent138 kV100 MW4.3 yrs54.9

Every scored site in Caddo County

All 138 sites, best first.

Caddo County datacenter FAQ

How many datacenter sites are in Caddo County?

138 scored datacenter candidate sites, averaging 50.8/100 DC Readiness. That is the 6th-most of 76 Oklahoma counties with five or more sites.

What is the highest-scoring datacenter site in Caddo County?

Substation-Adjacent site · f457ee77 scores 62.9/100 DC Readiness, the highest of the 138 scored sites in Caddo County (a substation-adjacent site).

Does Caddo County offer datacenter tax incentives?

Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.

What is the natural-hazard risk in Caddo County?

FEMA's National Risk Index rates Caddo County as "Relatively High" (score 42).

What are industrial electricity rates in Caddo County?

Average industrial electricity is 5.87¢/kWh and commercial is 9.18¢/kWh in Caddo County.

More in Oklahoma

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 22, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Caddo County, Oklahoma”, https://gridcensus.com/datacenter-sites/oklahoma/caddo-county (data as of November 22, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Caddo County, Oklahoma is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.