Gaston has 43 scored datacenter candidate sites averaging 58.9/100 DC Readiness, with a catalogued aggregate of 2,600 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

Gaston, North Carolina has 43 scored datacenter candidate sites averaging 58.9/100 DC Readiness, roughly in line with the North Carolina average of 55.1. It ranks 17th of 88 North Carolina counties by number of sites and 8th by average score. The top-scoring site is PEACOCK at 64.6/100.

43
Candidate sites
58.9/100
Avg DC Readiness
2,600 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Gaston

Site-selection context for Gaston

Yessales_tax_exemption
Datacenter tax incentive
10.84¢/kWh
Commercial electricity
7.54¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$8,015
Land price / acre
1,600
Cooling degree days
3,300
Heating degree days
59°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment and electricity for $75M+ investments; property tax abatement.

How does Gaston compare with other counties in North Carolina?

By number of scored sites, Gaston ranks 17th of the 88 North Carolina counties with a county page, holding 1.5% of the state's 2,778 sites. Its average DC Readiness of 58.9/100 ranks 8th in the state and is about 11% above the national average of 53.0. Nationally it has the 887th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 40 score 55 or higher.

What types of datacenter sites are in Gaston?

Substation-Adjacent sites are the most common (27, 63% of the county's inventory), followed by greenfield (13) and former mine (2). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Gaston?

Industrial electricity averages 7.54¢/kWh and commercial 10.84¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (42). WRI water stress is low. 5 fiber providers report service in the county. The climate runs 1,600 cooling degree days a year with a mean temperature of 59°F. Land is valued around $8,015 an acre.

By site type

Top datacenter sites in Gaston

Top datacenter sites in Gaston
SiteTypeVoltageCapacityQueue waitScore
PEACOCKSubstation-Adjacent230 kV300 MW5.3 yrs64.6
EC Near RiverbendGreenfield——5.3 yrs63.1
EC Near RiverbendGreenfield——5.3 yrs61.7
EC Near G G AllenGreenfield——5.3 yrs61.3
Greenfield (UNKNOWN111199 - MCGUIRE)Greenfield500 kV1,000 MW5.3 yrs61.2
EC Near Gastonia Rankin LakeGreenfield——5.3 yrs61.0
EC Near G G AllenGreenfield——5.3 yrs60.7
EC Near Gastonia Rankin LakeGreenfield——5.3 yrs60.5
EC Near RiverbendGreenfield——5.3 yrs60.0
EC Near Gastonia Rankin LakeGreenfield——5.3 yrs59.5
TAP152813Substation-Adjacent100 kV50 MW5.3 yrs59.4
HILLTOPSubstation-Adjacent100 kV50 MW5.3 yrs59.4
UNKNOWN112752Substation-Adjacent100 kV50 MW5.3 yrs59.4
EC Near Gastonia Rankin LakeGreenfield——5.3 yrs59.3
UNKNOWN169719Substation-Adjacent100 kV50 MW5.3 yrs59.0
UNKNOWN112745Substation-Adjacent100 kV50 MW5.3 yrs59.0
TAP112742Substation-Adjacent100 kV50 MW5.3 yrs59.0
EC Near Gastonia Rankin LakeGreenfield——5.3 yrs59.0
UNKNOWN112733Substation-Adjacent100 kV50 MW5.3 yrs59.0
TAP152808Substation-Adjacent100 kV50 MW5.3 yrs59.0
UNKNOWN112735Substation-Adjacent100 kV50 MW5.3 yrs59.0
MCADENVILLESubstation-Adjacent100 kV50 MW5.3 yrs58.9
UNKNOWN112737Substation-Adjacent100 kV50 MW5.3 yrs58.9
TAP150314Substation-Adjacent100 kV50 MW5.3 yrs58.8
UNKNOWN112327Substation-Adjacent100 kV50 MW5.3 yrs58.8

Every scored site in Gaston

All 43 sites, best first.

Gaston datacenter FAQ

How many datacenter sites are in Gaston?

43 scored datacenter candidate sites, averaging 58.9/100 DC Readiness. That is the 17th-most of 88 North Carolina counties with five or more sites.

What is the highest-scoring datacenter site in Gaston?

PEACOCK scores 64.6/100 DC Readiness, the highest of the 43 scored sites in Gaston (a substation-adjacent site).

Does Gaston offer datacenter tax incentives?

Sales tax exemption on DC equipment and electricity for $75M+ investments; property tax abatement.

What is the natural-hazard risk in Gaston?

FEMA's National Risk Index rates Gaston as "Relatively High" (score 42).

What are industrial electricity rates in Gaston?

Average industrial electricity is 7.54¢/kWh and commercial is 10.84¢/kWh in Gaston.

More in North Carolina

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Gaston, North Carolina”, https://gridcensus.com/datacenter-sites/north-carolina/gaston (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Gaston, North Carolina is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.