Skip to content
Gridcensus

Datacenter Sites in Gaston, North Carolina

Gaston has 43 scored datacenter candidate sites averaging 55.9/100 DC Readiness, with a catalogued aggregate of 2,600 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

43
Candidate sites
55.9/100
Avg DC Readiness
2,600 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Gaston

Site-selection context for Gaston

Yessales_tax_exemption
Datacenter tax incentive
10.84¢/kWh
Commercial electricity
7.54¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$8,015
Land price / acre
1,600
Cooling degree days
3,300
Heating degree days
59°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment and electricity for $75M+ investments; property tax abatement.

By site type

Top datacenter sites in Gaston

Top datacenter sites in Gaston
SiteTypeVoltageCapacityQueue waitScore
PEACOCKSubstation-Adjacent230 kV300 MW3.8 yrs61.6
EC Near RiverbendGreenfield4.3 yrs60.0
EC Near RiverbendGreenfield4.3 yrs58.7
EC Near G G AllenGreenfield4.3 yrs58.2
Greenfield (UNKNOWN111199 - MCGUIRE)Greenfield500 kV1,000 MW3.8 yrs58.2
EC Near Gastonia Rankin LakeGreenfield4.3 yrs57.9
EC Near G G AllenGreenfield4.3 yrs57.6
EC Near Gastonia Rankin LakeGreenfield4.3 yrs57.5
EC Near RiverbendGreenfield4.3 yrs56.9
HILLTOPSubstation-Adjacent100 kV50 MW3.8 yrs56.5
UNKNOWN112752Substation-Adjacent100 kV50 MW3.8 yrs56.5
EC Near Gastonia Rankin LakeGreenfield4.3 yrs56.4
TAP152813Substation-Adjacent100 kV50 MW3.8 yrs56.4
TAP150313Substation-Adjacent100 kV50 MW3.8 yrs56.4
EC Near Gastonia Rankin LakeGreenfield4.3 yrs56.2
UNKNOWN169719Substation-Adjacent100 kV50 MW3.8 yrs56.1
UNKNOWN112745Substation-Adjacent100 kV50 MW3.8 yrs56.1
UNKNOWN112735Substation-Adjacent100 kV50 MW3.8 yrs56.0
UNKNOWN112733Substation-Adjacent100 kV50 MW3.8 yrs56.0
TAP152808Substation-Adjacent100 kV50 MW3.8 yrs56.0
TAP112742Substation-Adjacent100 kV50 MW3.8 yrs56.0
MCADENVILLESubstation-Adjacent100 kV50 MW3.8 yrs56.0
EC Near Gastonia Rankin LakeGreenfield4.3 yrs55.9
UNKNOWN112737Substation-Adjacent100 kV50 MW3.8 yrs55.9
TAP150314Substation-Adjacent100 kV50 MW3.8 yrs55.8

Gaston datacenter FAQ

How many datacenter sites are in Gaston?
43 scored datacenter candidate sites, averaging 55.9/100 DC Readiness.
Does Gaston offer datacenter tax incentives?
Sales tax exemption on DC equipment and electricity for $75M+ investments; property tax abatement.
What is the natural-hazard risk in Gaston?
FEMA's National Risk Index rates Gaston as "Relatively High" (score 42).
What are industrial electricity rates in Gaston?
Average industrial electricity is 7.54¢/kWh and commercial is 10.84¢/kWh in Gaston.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Gaston, North Carolina. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.