Datacenter Sites in Dodge County, Nebraska
Dodge County has 18 scored datacenter candidate sites averaging 54.8/100 DC Readiness, with a catalogued aggregate of 700 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
At a glance
Dodge County, Nebraska has 18 scored datacenter candidate sites averaging 54.8/100 DC Readiness, roughly in line with the Nebraska average of 51.8. It ranks 42nd of 79 Nebraska counties by number of sites and 18th by average score. The top-scoring site is OZ Dodge · c57d25bf at 59.4/100.
Site-selection context for Dodge County
Incentive detail: ImagiNE Nebraska Act: sales tax exemption on DC equipment; investment tax credits.
How does Dodge County compare with other counties in Nebraska?
By number of scored sites, Dodge County ranks 42nd of the 79 Nebraska counties with a county page, holding 0.8% of the state's 2,329 sites. Its average DC Readiness of 54.8/100 ranks 18th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1835th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 11 score 55 or higher.
What types of datacenter sites are in Dodge County?
Substation-Adjacent sites are the most common (9, 50% of the county's inventory), followed by industrial (5) and greenfield (3). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Dodge County?
Industrial electricity averages 5.82¢/kWh and commercial 8.71¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (28). WRI water stress is medium-high. 14 fiber providers report service in the county. The climate runs 1,000 cooling degree days a year with a mean temperature of 49°F. Land is valued around $7,512 an acre.
By site type
Top datacenter sites in Dodge County
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| OZ Dodge | Greenfield | — | — | 4.3 yrs | 59.4 |
| UNKNOWN131736 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 57.9 |
| UNKNOWN131760 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 57.6 |
| OZ Dodge | Greenfield | — | — | 4.3 yrs | 57.4 |
| UNKNOWN131846 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 56.8 |
| UNKNOWN148600 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 56.3 |
| UNKNOWN131761 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 56.2 |
| TAP159256 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 56.0 |
| UNKNOWN159257 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 56.0 |
| UNKNOWN156753 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 55.9 |
| RISER159259 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 55.7 |
| Mine Site | Former Mine | — | — | 4.3 yrs | 52.3 |
| Former Fremont Gas & Electric Light FMGP Site | Industrial | — | — | 4.3 yrs | 52.1 |
| Fremont City Auditorium | Industrial | — | — | 4.3 yrs | 52.1 |
| Fremont Police Department | Industrial | — | — | 4.3 yrs | 52.1 |
| Former Izaak Walton Trap Range | Industrial | — | — | 4.3 yrs | 51.9 |
| Greenfield (UNKNOWN131736 - UNKNOWN131846) | Greenfield | 115 kV | 100 MW | 4.3 yrs | 51.2 |
| Roemer Property | Industrial | — | — | 4.3 yrs | 50.1 |
Every scored site in Dodge County
All 18 sites, best first.
- OZ Dodge · c57d25bf · 59.4
- Substation-Adjacent site · 9c950ccb · 57.9
- Substation-Adjacent site · 3ced03c2 · 57.6
- OZ Dodge · 9f754434 · 57.4
- Substation-Adjacent site · 478fdcf1 · 56.8
- Substation-Adjacent site · 0ad7669b · 56.3
- Substation-Adjacent site · 6381a13a · 56.2
- Substation-Adjacent site · cad7d000 · 56.0
- Substation-Adjacent site · 67aa1fcd · 56.0
- Substation-Adjacent site · 3ca26661 · 55.9
- Substation-Adjacent site · d5b63f72 · 55.7
- Mine Site · fc53f626 · 52.3
- Former Fremont Gas & Electric Light FMGP Site · 52.1
- Fremont City Auditorium · 52.1
- Fremont Police Department · 52.1
- Former Izaak Walton Trap Range · 51.9
- Greenfield (UNKNOWN131736 - UNKNOWN131846) · 51.2
- Roemer Property · 50.1
Dodge County datacenter FAQ
How many datacenter sites are in Dodge County?
18 scored datacenter candidate sites, averaging 54.8/100 DC Readiness. That is the 42nd-most of 79 Nebraska counties with five or more sites.
What is the highest-scoring datacenter site in Dodge County?
OZ Dodge · c57d25bf scores 59.4/100 DC Readiness, the highest of the 18 scored sites in Dodge County (a greenfield site).
Does Dodge County offer datacenter tax incentives?
ImagiNE Nebraska Act: sales tax exemption on DC equipment; investment tax credits.
What is the natural-hazard risk in Dodge County?
FEMA's National Risk Index rates Dodge County as "Relatively Moderate" (score 28).
What are industrial electricity rates in Dodge County?
Average industrial electricity is 5.82¢/kWh and commercial is 8.71¢/kWh in Dodge County.
More in Nebraska
- All datacenter sites in Nebraska· 2,329 sites
- Operating datacenters in Nebraska
- Electric substations in Nebraska
- Furnas· 134 sites · avg 50.9
- Valley County· 124 sites · avg 48.3
- Douglas County· 93 sites · avg 58.8
- Scotts Bluff County· 93 sites · avg 52.2
- Franklin County· 86 sites · avg 50.2
- Lancaster County· 84 sites · avg 59.1
- Substation-Adjacent sites in Nebraska
- Industrial sites in Nebraska
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Dodge County, Nebraska”, https://gridcensus.com/datacenter-sites/nebraska/dodge-county (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Dodge County, Nebraska is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.