Datacenter Sites in YALOBUSHA, Mississippi
YALOBUSHA has 13 scored datacenter candidate sites averaging 54.6/100 DC Readiness, with a catalogued aggregate of 900 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
At a glance
YALOBUSHA, Mississippi has 13 scored datacenter candidate sites averaging 54.6/100 DC Readiness, roughly in line with the Mississippi average of 53.0. It ranks 64th of 80 Mississippi counties by number of sites and 15th by average score. The top-scoring site is TILLATOBA at 60.2/100.
Site-selection context for YALOBUSHA
Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
How does YALOBUSHA compare with other counties in Mississippi?
By number of scored sites, YALOBUSHA ranks 64th of the 80 Mississippi counties with a county page, holding 0.4% of the state's 3,104 sites. Its average DC Readiness of 54.6/100 ranks 15th in the state and is roughly in line with the national average of 53.0. Nationally it has the 2184th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 6 score 55 or higher.
What types of datacenter sites are in YALOBUSHA?
Manufacturing sites are the most common (6, 46% of the county's inventory), followed by substation-adjacent (5) and greenfield (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in YALOBUSHA?
Industrial electricity averages 7.39¢/kWh and commercial 11.84¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (45). WRI water stress is low. 7 fiber providers report service in the county. The climate runs 2,400 cooling degree days a year with a mean temperature of 64°F. Land is valued around $2,519 an acre.
By site type
Top datacenter sites in YALOBUSHA
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| TILLATOBA | Substation-Adjacent | 230 kV | 300 MW | 4.3 yrs | 60.2 |
| NORTH OAKLAND | Substation-Adjacent | 230 kV | 300 MW | 4.3 yrs | 60.2 |
| COFFEEVILLE | Substation-Adjacent | 161 kV | 100 MW | 3.9 yrs | 59.0 |
| TAP169524 | Substation-Adjacent | 161 kV | 100 MW | 3.9 yrs | 58.1 |
| UNKNOWN169523 | Substation-Adjacent | 161 kV | 100 MW | 3.9 yrs | 57.3 |
| EC FFE Yalobusha County | Greenfield | — | — | 4.3 yrs | 56.6 |
| AVERY OUTDOORS, INC. (SPORTING AND ATHLETIC GOODS MANUFACTURING) | Manufacturing | — | — | 3.9 yrs | 52.4 |
| K & D CULTURED MARBLE, INC. (CUT STONE AND STONE PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.9 yrs | 52.4 |
| WATER VALLEY POULTRY, LLC (NOT AVAILABLE) | Manufacturing | — | — | 3.9 yrs | 51.3 |
| Water Valley Manufacturing | Industrial | — | — | 3.9 yrs | 50.9 |
| BORGWARNER EMISSION SYSTEMS, INC. (ALL OTHER MOTOR VEHICLE PARTS MANUFACTURING) | Manufacturing | — | — | 3.9 yrs | 50.7 |
| VALLEY TOOL, INC. (SPECIAL DIE AND TOOL, DIE SET, JIG, AND FIXTURE MANUFACTURING) | Manufacturing | — | — | 3.9 yrs | 50.7 |
| D & B MATERIALS (SAWMILLS) | Manufacturing | — | — | 4.3 yrs | 50.0 |
Every scored site in YALOBUSHA
All 13 sites, best first.
- TILLATOBA · 60.2
- NORTH OAKLAND · 60.2
- COFFEEVILLE · 59.0
- Substation-Adjacent site · 339e2851 · 58.1
- Substation-Adjacent site · f0cf067f · 57.3
- EC FFE Yalobusha County · 56.6
- AVERY OUTDOORS, INC. (SPORTING AND ATHLETIC GOODS MANUFACTURING) · 52.4
- K & D CULTURED MARBLE, INC. (CUT STONE AND STONE PRODUCT MANUFACTURING) · 52.4
- WATER VALLEY POULTRY, LLC (NOT AVAILABLE) · 51.3
- Water Valley Manufacturing · 50.9
- BORGWARNER EMISSION SYSTEMS, INC. (ALL OTHER MOTOR VEHICLE PARTS MANUFACTURING) · 50.7
- VALLEY TOOL, INC. (SPECIAL DIE AND TOOL, DIE SET, JIG, AND FIXTURE MANUFACTURING) · 50.7
- D & B MATERIALS (SAWMILLS) · 50.0
YALOBUSHA datacenter FAQ
How many datacenter sites are in YALOBUSHA?
13 scored datacenter candidate sites, averaging 54.6/100 DC Readiness. That is the 64th-most of 80 Mississippi counties with five or more sites.
What is the highest-scoring datacenter site in YALOBUSHA?
TILLATOBA scores 60.2/100 DC Readiness, the highest of the 13 scored sites in YALOBUSHA (a substation-adjacent site).
Does YALOBUSHA offer datacenter tax incentives?
Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
What is the natural-hazard risk in YALOBUSHA?
FEMA's National Risk Index rates YALOBUSHA as "Relatively High" (score 45).
What are industrial electricity rates in YALOBUSHA?
Average industrial electricity is 7.39¢/kWh and commercial is 11.84¢/kWh in YALOBUSHA.
More in Mississippi
- All datacenter sites in Mississippi· 3,104 sites
- Operating datacenters in Mississippi
- Electric substations in Mississippi
- Hinds· 201 sites · avg 52.4
- Forrest County· 146 sites · avg 51.6
- DeSoto County· 137 sites · avg 55.9
- Jackson County· 132 sites · avg 53.6
- Lee County· 126 sites · avg 53.5
- Harrison County· 118 sites · avg 53.5
- Manufacturing sites in Mississippi
- Substation-Adjacent sites in Mississippi
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in YALOBUSHA, Mississippi”, https://gridcensus.com/datacenter-sites/mississippi/yalobusha (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for YALOBUSHA, Mississippi is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.