Datacenter Sites in SMITH, Mississippi

SMITH has 16 scored datacenter candidate sites averaging 52.8/100 DC Readiness, with a catalogued aggregate of 800 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

16
Candidate sites
52.8/100
Avg DC Readiness
800 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 16 in SMITH

Site-selection context for SMITH

Yessales_tax_exemption
Datacenter tax incentive
11.71¢/kWh
Commercial electricity
7.95¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$3,551
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

By site type

Top datacenter sites in SMITH

Top datacenter sites in SMITH
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN109393Substation-Adjacent115 kV100 MW2.8 yrs56.2
UNKNOWN109392Substation-Adjacent115 kV100 MW2.8 yrs56.2
UNKNOWN109396Substation-Adjacent115 kV100 MW2.8 yrs55.9
TAP169504Substation-Adjacent115 kV100 MW2.8 yrs55.7
TAP169459Substation-Adjacent115 kV100 MW2.8 yrs55.7
UNKNOWN109391Substation-Adjacent115 kV100 MW2.8 yrs55.7
UNKNOWN109394Substation-Adjacent115 kV100 MW2.8 yrs55.6
GEORGIA-PACIFIC LLC (SAWMILLS)Manufacturing3.5 yrs50.8
GEORGIA-PACIFIC LLC, PLYWOOD PLT. (SOFTWOOD VENEER AND PLYWOOD MANUFACTURING)Manufacturing3.5 yrs50.8
GEORGIA-PACIFIC CHEMICAL, LLC (ALL OTHER BASIC ORGANIC CHEMICAL MANUFACTURING)Manufacturing3.5 yrs50.8
ROSEBURG FOREST PRODUCTS CO. (SAWMILLS)Manufacturing3.5 yrs50.8
WARMKRAFT, INC. (ALL OTHER MISCELLANEOUS ELECTRICAL EQUIPMENT AND COMPONENT MANUFACTURING)Manufacturing3.5 yrs50.7
SOLAR GROUP, INC. (HARDWARE MANUFACTURING)Manufacturing3.5 yrs50.7
BRYANT MEATS, INC. (MEAT PROCESSED FROM CARCASSES)Manufacturing3.5 yrs50.7
BATTE & SONS, INC., JACK (SAWMILLS)Manufacturing3.5 yrs49.6
Greenfield (UNKNOWN109392 - SYLVARENA)Greenfield115 kV100 MW2.8 yrs49.5

SMITH datacenter FAQ

How many datacenter sites are in SMITH?
16 scored datacenter candidate sites, averaging 52.8/100 DC Readiness.
Does SMITH offer datacenter tax incentives?
Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
What is the natural-hazard risk in SMITH?
FEMA's National Risk Index rates SMITH as "Relatively High" (score 45).
What are industrial electricity rates in SMITH?
Average industrial electricity is 7.95¢/kWh and commercial is 11.71¢/kWh in SMITH.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SMITH, Mississippi. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.