Datacenter Sites in SMITH, Mississippi
SMITH has 16 scored datacenter candidate sites averaging 52.8/100 DC Readiness, with a catalogued aggregate of 800 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
16
Candidate sites
52.8/100
Avg DC Readiness
800 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
Site-selection context for SMITH
Yessales_tax_exemption
Datacenter tax incentive
11.71¢/kWh
Commercial electricity
7.95¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$3,551
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
By site type
Top datacenter sites in SMITH
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN109393 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 56.2 |
| UNKNOWN109392 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 56.2 |
| UNKNOWN109396 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 55.9 |
| TAP169504 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 55.7 |
| TAP169459 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 55.7 |
| UNKNOWN109391 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 55.7 |
| UNKNOWN109394 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 55.6 |
| GEORGIA-PACIFIC LLC (SAWMILLS) | Manufacturing | — | — | 3.5 yrs | 50.8 |
| GEORGIA-PACIFIC LLC, PLYWOOD PLT. (SOFTWOOD VENEER AND PLYWOOD MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 50.8 |
| GEORGIA-PACIFIC CHEMICAL, LLC (ALL OTHER BASIC ORGANIC CHEMICAL MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 50.8 |
| ROSEBURG FOREST PRODUCTS CO. (SAWMILLS) | Manufacturing | — | — | 3.5 yrs | 50.8 |
| WARMKRAFT, INC. (ALL OTHER MISCELLANEOUS ELECTRICAL EQUIPMENT AND COMPONENT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 50.7 |
| SOLAR GROUP, INC. (HARDWARE MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 50.7 |
| BRYANT MEATS, INC. (MEAT PROCESSED FROM CARCASSES) | Manufacturing | — | — | 3.5 yrs | 50.7 |
| BATTE & SONS, INC., JACK (SAWMILLS) | Manufacturing | — | — | 3.5 yrs | 49.6 |
| Greenfield (UNKNOWN109392 - SYLVARENA) | Greenfield | 115 kV | 100 MW | 2.8 yrs | 49.5 |
SMITH datacenter FAQ
- How many datacenter sites are in SMITH?
- 16 scored datacenter candidate sites, averaging 52.8/100 DC Readiness.
- Does SMITH offer datacenter tax incentives?
- Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
- What is the natural-hazard risk in SMITH?
- FEMA's National Risk Index rates SMITH as "Relatively High" (score 45).
- What are industrial electricity rates in SMITH?
- Average industrial electricity is 7.95¢/kWh and commercial is 11.71¢/kWh in SMITH.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for SMITH, Mississippi. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.