Datacenter Sites in LINCOLN, Mississippi

LINCOLN has 35 scored datacenter candidate sites averaging 52.5/100 DC Readiness, with a catalogued aggregate of 2,700 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

35
Candidate sites
52.5/100
Avg DC Readiness
2,700 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in LINCOLN

Site-selection context for LINCOLN

Yessales_tax_exemption
Datacenter tax incentive
13.79¢/kWh
Commercial electricity
8.72¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$3,880
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

By site type

Top datacenter sites in LINCOLN

Top datacenter sites in LINCOLN
SiteTypeVoltageCapacityQueue waitScore
FRANKLINSubstation-Adjacent500 kV1,000 MW2.8 yrs63.9
EC FFE Lincoln CountyGreenfield1.4 yrs59.4
UNKNOWN110834Substation-Adjacent115 kV100 MW2.8 yrs55.9
UNKNOWN110837Substation-Adjacent115 kV100 MW2.8 yrs55.8
TAP142765Substation-Adjacent115 kV100 MW2.8 yrs55.7
TAP142764Substation-Adjacent115 kV100 MW2.8 yrs55.7
UNKNOWN110161Substation-Adjacent115 kV100 MW2.8 yrs55.6
UNKNOWN110839Substation-Adjacent115 kV100 MW2.8 yrs55.4
UNKNOWN110831Substation-Adjacent115 kV100 MW2.8 yrs54.9
TAP142762Substation-Adjacent115 kV100 MW2.8 yrs54.8
UNKNOWN110832Substation-Adjacent115 kV100 MW2.8 yrs54.7
UNKNOWN110833Substation-Adjacent115 kV100 MW2.8 yrs54.5
ARLINGTONSubstation-Adjacent115 kV100 MW2.8 yrs54.5
Greenfield (MCCOMB - FRANKLIN)Greenfield230 kV300 MW8.2 yrs51.1
Greenfield (MCCOMB - FRANKLIN)Greenfield230 kV300 MW8.2 yrs50.8
ABILITYWORKS, INC. (WOOD CONTAINER AND PALLET MANUFACTURING)Manufacturing3.5 yrs50.5
REDD LUMBER CO., GORDON (WOOD PRESERVATION)Manufacturing3.5 yrs50.5
SOUTHWEST PUBLISHERS, INC. (OTHER COMMERCIAL PRINTING)Manufacturing3.5 yrs50.5
DELPHI PACKARD ELECTRIC SYSTEMS (OTHER MOTOR VEHICLE ELECTRICAL AND ELECTRONIC EQUIPMENT MANUFACTURING)Manufacturing3.5 yrs50.5
WASTEQUIP MAY FAB-MS, INC. (METAL CAN MANUFACTURING)Manufacturing3.5 yrs50.5
HARTLEY GOVE SONS (OTHER MEASURING AND CONTROLLING DEVICE MANUFACTURING)Manufacturing3.5 yrs50.5
CONTINENTAL CARBONIC PRODUCTS, INC. (INDUSTRIAL GAS MANUFACTURING)Manufacturing3.5 yrs50.5
COLUMBUS LUMBER CO., LLC (NOT AVAILABLE)Manufacturing3.5 yrs50.5
B & O MACHINE & WELDING CO. (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING)Manufacturing3.5 yrs50.4
SMITH'S MACHINE & WELDING CO., INC. (MACHINE SHOPS)Manufacturing3.5 yrs50.4

LINCOLN datacenter FAQ

How many datacenter sites are in LINCOLN?
35 scored datacenter candidate sites, averaging 52.5/100 DC Readiness.
Does LINCOLN offer datacenter tax incentives?
Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
What is the natural-hazard risk in LINCOLN?
FEMA's National Risk Index rates LINCOLN as "Relatively High" (score 45).
What are industrial electricity rates in LINCOLN?
Average industrial electricity is 8.72¢/kWh and commercial is 13.79¢/kWh in LINCOLN.