Datacenter Sites in LINCOLN, Mississippi
LINCOLN has 35 scored datacenter candidate sites averaging 52.5/100 DC Readiness, with a catalogued aggregate of 2,700 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
35
Candidate sites
52.5/100
Avg DC Readiness
2,700 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
Site-selection context for LINCOLN
Yessales_tax_exemption
Datacenter tax incentive
13.79¢/kWh
Commercial electricity
8.72¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$3,880
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
By site type
Top datacenter sites in LINCOLN
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| FRANKLIN | Substation-Adjacent | 500 kV | 1,000 MW | 2.8 yrs | 63.9 |
| EC FFE Lincoln County | Greenfield | — | — | 1.4 yrs | 59.4 |
| UNKNOWN110834 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 55.9 |
| UNKNOWN110837 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 55.8 |
| TAP142765 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 55.7 |
| TAP142764 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 55.7 |
| UNKNOWN110161 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 55.6 |
| UNKNOWN110839 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 55.4 |
| UNKNOWN110831 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 54.9 |
| TAP142762 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 54.8 |
| UNKNOWN110832 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 54.7 |
| UNKNOWN110833 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 54.5 |
| ARLINGTON | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 54.5 |
| Greenfield (MCCOMB - FRANKLIN) | Greenfield | 230 kV | 300 MW | 8.2 yrs | 51.1 |
| Greenfield (MCCOMB - FRANKLIN) | Greenfield | 230 kV | 300 MW | 8.2 yrs | 50.8 |
| ABILITYWORKS, INC. (WOOD CONTAINER AND PALLET MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 50.5 |
| REDD LUMBER CO., GORDON (WOOD PRESERVATION) | Manufacturing | — | — | 3.5 yrs | 50.5 |
| SOUTHWEST PUBLISHERS, INC. (OTHER COMMERCIAL PRINTING) | Manufacturing | — | — | 3.5 yrs | 50.5 |
| DELPHI PACKARD ELECTRIC SYSTEMS (OTHER MOTOR VEHICLE ELECTRICAL AND ELECTRONIC EQUIPMENT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 50.5 |
| WASTEQUIP MAY FAB-MS, INC. (METAL CAN MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 50.5 |
| HARTLEY GOVE SONS (OTHER MEASURING AND CONTROLLING DEVICE MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 50.5 |
| CONTINENTAL CARBONIC PRODUCTS, INC. (INDUSTRIAL GAS MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 50.5 |
| COLUMBUS LUMBER CO., LLC (NOT AVAILABLE) | Manufacturing | — | — | 3.5 yrs | 50.5 |
| B & O MACHINE & WELDING CO. (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 50.4 |
| SMITH'S MACHINE & WELDING CO., INC. (MACHINE SHOPS) | Manufacturing | — | — | 3.5 yrs | 50.4 |
LINCOLN datacenter FAQ
- How many datacenter sites are in LINCOLN?
- 35 scored datacenter candidate sites, averaging 52.5/100 DC Readiness.
- Does LINCOLN offer datacenter tax incentives?
- Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
- What is the natural-hazard risk in LINCOLN?
- FEMA's National Risk Index rates LINCOLN as "Relatively High" (score 45).
- What are industrial electricity rates in LINCOLN?
- Average industrial electricity is 8.72¢/kWh and commercial is 13.79¢/kWh in LINCOLN.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for LINCOLN, Mississippi. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.