Datacenter Sites in LINCOLN, Mississippi
LINCOLN has 35 scored datacenter candidate sites averaging 52.4/100 DC Readiness, with a catalogued aggregate of 2,700 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
At a glance
LINCOLN, Mississippi has 35 scored datacenter candidate sites averaging 52.4/100 DC Readiness, roughly in line with the Mississippi average of 53.0. It ranks 29th of 80 Mississippi counties by number of sites and 48th by average score. The top-scoring site is FRANKLIN at 64.1/100.
Site-selection context for LINCOLN
Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
How does LINCOLN compare with other counties in Mississippi?
By number of scored sites, LINCOLN ranks 29th of the 80 Mississippi counties with a county page, holding 1.1% of the state's 3,104 sites. Its average DC Readiness of 52.4/100 ranks 48th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1101st-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 10 score 55 or higher.
What types of datacenter sites are in LINCOLN?
Manufacturing sites are the most common (17, 49% of the county's inventory), followed by substation-adjacent (12) and greenfield (3). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in LINCOLN?
Industrial electricity averages 8.72¢/kWh and commercial 13.79¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (45). WRI water stress is low. 5 fiber providers report service in the county. The climate runs 2,400 cooling degree days a year with a mean temperature of 64°F. Land is valued around $3,880 an acre.
By site type
Top datacenter sites in LINCOLN
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| FRANKLIN | Substation-Adjacent | 500 kV | 1,000 MW | 4.3 yrs | 64.1 |
| EC FFE Lincoln County | Greenfield | — | — | 4.3 yrs | 58.3 |
| UNKNOWN110834 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 56.1 |
| UNKNOWN110837 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 56.0 |
| TAP142764 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 55.9 |
| TAP142765 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 55.9 |
| UNKNOWN110161 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 55.8 |
| UNKNOWN110839 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 55.6 |
| UNKNOWN110831 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 55.1 |
| TAP142762 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 55.0 |
| UNKNOWN110832 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 54.9 |
| UNKNOWN110833 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 54.7 |
| ARLINGTON | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 54.7 |
| Greenfield (MCCOMB - FRANKLIN) | Greenfield | 230 kV | 300 MW | 7.6 yrs | 51.4 |
| Greenfield (MCCOMB - FRANKLIN) | Greenfield | 230 kV | 300 MW | 7.6 yrs | 51.1 |
| HARTLEY GOVE SONS (OTHER MEASURING AND CONTROLLING DEVICE MANUFACTURING) | Manufacturing | — | — | 4.3 yrs | 50.2 |
| WASTEQUIP MAY FAB-MS, INC. (METAL CAN MANUFACTURING) | Manufacturing | — | — | 4.3 yrs | 50.2 |
| REDD LUMBER CO., GORDON (WOOD PRESERVATION) | Manufacturing | — | — | 4.3 yrs | 50.2 |
| DELPHI PACKARD ELECTRIC SYSTEMS (OTHER MOTOR VEHICLE ELECTRICAL AND ELECTRONIC EQUIPMENT MANUFACTURING) | Manufacturing | — | — | 4.3 yrs | 50.2 |
| CONTINENTAL CARBONIC PRODUCTS, INC. (INDUSTRIAL GAS MANUFACTURING) | Manufacturing | — | — | 4.3 yrs | 50.2 |
| COLUMBUS LUMBER CO., LLC (NOT AVAILABLE) | Manufacturing | — | — | 4.3 yrs | 50.2 |
| ABILITYWORKS, INC. (WOOD CONTAINER AND PALLET MANUFACTURING) | Manufacturing | — | — | 4.3 yrs | 50.2 |
| Keystone Seneca Wire Cloth Company | Industrial | — | — | 4.3 yrs | 50.2 |
| SMITH'S MACHINE & WELDING CO., INC. (MACHINE SHOPS) | Manufacturing | — | — | 4.3 yrs | 50.1 |
| B & O MACHINE & WELDING CO. (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING) | Manufacturing | — | — | 4.3 yrs | 50.1 |
Every scored site in LINCOLN
All 35 sites, best first.
- FRANKLIN · 64.1
- EC FFE Lincoln County · 58.3
- Substation-Adjacent site · 63db27cc · 56.1
- Substation-Adjacent site · 95dd35a1 · 56.0
- Substation-Adjacent site · d81a3c33 · 55.9
- Substation-Adjacent site · 2c20fc79 · 55.9
- Substation-Adjacent site · ce969912 · 55.8
- Substation-Adjacent site · e633cc2b · 55.6
- Substation-Adjacent site · b1798f2a · 55.1
- Substation-Adjacent site · cf9ac128 · 55.0
- Substation-Adjacent site · 8eed1264 · 54.9
- Substation-Adjacent site · bfcceea6 · 54.7
- ARLINGTON · 54.7
- Greenfield (MCCOMB - FRANKLIN) · bbeda068 · 51.4
- Greenfield (MCCOMB - FRANKLIN) · 25cb2370 · 51.1
- HARTLEY GOVE SONS (OTHER MEASURING AND CONTROLLING DEVICE MANUFACTURING) · 50.2
- WASTEQUIP MAY FAB-MS, INC. (METAL CAN MANUFACTURING) · 50.2
- REDD LUMBER CO., GORDON (WOOD PRESERVATION) · 50.2
- DELPHI PACKARD ELECTRIC SYSTEMS (OTHER MOTOR VEHICLE ELECTRICAL AND ELECTRONIC EQUIPMENT MANUFACTURING) · 50.2
- CONTINENTAL CARBONIC PRODUCTS, INC. (INDUSTRIAL GAS MANUFACTURING) · 50.2
- COLUMBUS LUMBER CO., LLC (NOT AVAILABLE) · 50.2
- ABILITYWORKS, INC. (WOOD CONTAINER AND PALLET MANUFACTURING) · 50.2
- Keystone Seneca Wire Cloth Company · 50.2
- SMITH'S MACHINE & WELDING CO., INC. (MACHINE SHOPS) · 50.1
- B & O MACHINE & WELDING CO. (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING) · 50.1
- SOUTHWEST PUBLISHERS, INC. (OTHER COMMERCIAL PRINTING) · 50.1
- Mine Site · b0bd5117 · 50.0
- LINCOLN LUMBER CO. (SAWMILLS) · 50.0
- Mine Site · df33a2f4 · 50.0
- PHILLIPS BARK PROCESSING CO., INC. (NOT AVAILABLE) · 50.0
- GATLIN CORP. (MACHINE SHOPS) · 50.0
- REED'S METALS, INC. (SHEET METAL WORK MANUFACTURING) · 49.9
- PEPPER'S MACHINE & WELDING CO., INC. (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING) · 49.2
- BYRD CHIPS, INC., CORTEZ (CUT STOCK, RESAWING LUMBER, AND PLANING) · 49.1
- BYRD LUMBER CO., INC., W. L. (SAWMILLS) · 48.6
LINCOLN datacenter FAQ
How many datacenter sites are in LINCOLN?
35 scored datacenter candidate sites, averaging 52.4/100 DC Readiness. That is the 29th-most of 80 Mississippi counties with five or more sites.
What is the highest-scoring datacenter site in LINCOLN?
FRANKLIN scores 64.1/100 DC Readiness, the highest of the 35 scored sites in LINCOLN (a substation-adjacent site).
Does LINCOLN offer datacenter tax incentives?
Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
What is the natural-hazard risk in LINCOLN?
FEMA's National Risk Index rates LINCOLN as "Relatively High" (score 45).
What are industrial electricity rates in LINCOLN?
Average industrial electricity is 8.72¢/kWh and commercial is 13.79¢/kWh in LINCOLN.
More in Mississippi
- All datacenter sites in Mississippi· 3,104 sites
- Operating datacenters in Mississippi
- Electric substations in Mississippi
- Hinds· 201 sites · avg 52.4
- Forrest County· 146 sites · avg 51.6
- DeSoto County· 137 sites · avg 55.9
- Jackson County· 132 sites · avg 53.6
- Lee County· 126 sites · avg 53.5
- Harrison County· 118 sites · avg 53.5
- Manufacturing sites in Mississippi
- Substation-Adjacent sites in Mississippi
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in LINCOLN, Mississippi”, https://gridcensus.com/datacenter-sites/mississippi/lincoln (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for LINCOLN, Mississippi is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.