Datacenter Sites in LEFLORE, Mississippi

LEFLORE has 40 scored datacenter candidate sites averaging 50.9/100 DC Readiness, with a catalogued aggregate of 1,100 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

40
Candidate sites
50.9/100
Avg DC Readiness
1,100 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in LEFLORE

Site-selection context for LEFLORE

Yessales_tax_exemption
Datacenter tax incentive
12.93¢/kWh
Commercial electricity
9.90¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$3,665
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

By site type

Top datacenter sites in LEFLORE

Top datacenter sites in LEFLORE
SiteTypeVoltageCapacityQueue waitScore
OZ LefloreGreenfield1.4 yrs56.9
UNKNOWN110735Substation-Adjacent115 kV100 MW2.8 yrs55.0
UNKNOWN110729Substation-Adjacent115 kV100 MW2.8 yrs55.0
UNKNOWN110732Substation-Adjacent115 kV100 MW2.8 yrs55.0
UNKNOWN110733Substation-Adjacent115 kV100 MW2.8 yrs55.0
TAP145955Substation-Adjacent115 kV100 MW2.8 yrs54.8
UNKNOWN110728Substation-Adjacent115 kV100 MW2.8 yrs54.6
UNKNOWN110731Substation-Adjacent115 kV100 MW2.8 yrs54.5
UNKNOWN111032Substation-Adjacent115 kV100 MW2.8 yrs54.5
TAP142160Substation-Adjacent115 kV100 MW2.8 yrs54.4
UNKNOWN110726Substation-Adjacent115 kV100 MW2.8 yrs54.2
EC FFE Leflore CountyGreenfield1.4 yrs52.2
Mine SiteFormer Mine2.8 yrs49.7
LAWRENCE PRINTING CO., INC. (OTHER COMMERCIAL PRINTING)Manufacturing3.5 yrs49.6
COMMONWEALTH PUBLISHING, INC. (OTHER COMMERCIAL PRINTING)Manufacturing3.5 yrs49.6
MILWAUKEE ELECTRIC TOOL CORP. (POWER-DRIVEN HAND TOOL MANUFACTURING)Manufacturing3.5 yrs49.6
4-WAY ELECTRIC, INC. (ELECTRONIC COIL, TRANSFORMER, AND OTHER INDUCTOR MANUFACTURING)Manufacturing3.5 yrs49.6
S & N AIROFLO (MOTOR AND GENERATOR MANUFACTURING)Manufacturing3.5 yrs49.6
VIKING RANGE CORPORATION (KITCHEN UTENSIL, POT, AND PAN MANUFACTURING)Manufacturing3.5 yrs49.6
FRICTION HOLDINGS, LLC (MOTOR VEHICLE TRANSMISSION AND POWER TRAIN PARTS MANUFACTURING)Manufacturing3.5 yrs49.6
VIKING RANGE CORP. (H Q) (OTHER MAJOR HOUSEHOLD APPLIANCE MANUFACTURING)Manufacturing3.5 yrs49.6
JOHN-RICHARD CO. (RESIDENTIAL ELECTRIC LIGHTING FIXTURE MANUFACTURING)Manufacturing3.5 yrs49.6
AG SPRAY EQUIPMENT, INC. (AIR AND GAS COMPRESSOR MANUFACTURING)Manufacturing3.5 yrs49.6
PYCO INDUSTRIES, INC. (OTHER OILSEED PROCESSING)Manufacturing3.5 yrs49.6
HICKOK SUPREME ELECTRONICS CORP. (ELECTROMEDICAL AND ELECTROTHERAPEUTIC APPARATUS MANUFACTURING)Manufacturing3.5 yrs49.5

LEFLORE datacenter FAQ

How many datacenter sites are in LEFLORE?
40 scored datacenter candidate sites, averaging 50.9/100 DC Readiness.
Does LEFLORE offer datacenter tax incentives?
Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
What is the natural-hazard risk in LEFLORE?
FEMA's National Risk Index rates LEFLORE as "Relatively High" (score 45).
What are industrial electricity rates in LEFLORE?
Average industrial electricity is 9.90¢/kWh and commercial is 12.93¢/kWh in LEFLORE.

Dataset updated . Screening estimates derived from public data sources.