Datacenter Sites in LEFLORE, Mississippi

LEFLORE has 40 scored datacenter candidate sites averaging 50.9/100 DC Readiness, with a catalogued aggregate of 1,100 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

LEFLORE, Mississippi has 40 scored datacenter candidate sites averaging 50.9/100 DC Readiness, roughly in line with the Mississippi average of 53.0. It ranks 24th of 80 Mississippi counties by number of sites and 64th by average score. The top-scoring site is OZ Leflore at 55.8/100.

40
Candidate sites
50.9/100
Avg DC Readiness
1,100 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in LEFLORE

Site-selection context for LEFLORE

Yessales_tax_exemption
Datacenter tax incentive
12.93¢/kWh
Commercial electricity
9.90¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$3,665
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

How does LEFLORE compare with other counties in Mississippi?

By number of scored sites, LEFLORE ranks 24th of the 80 Mississippi counties with a county page, holding 1.3% of the state's 3,104 sites. Its average DC Readiness of 50.9/100 ranks 64th in the state and is roughly in line with the national average of 53.0. Nationally it has the 969th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 6 score 55 or higher.

What types of datacenter sites are in LEFLORE?

Manufacturing sites are the most common (16, 40% of the county's inventory), followed by substation-adjacent (10) and industrial (9). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in LEFLORE?

Industrial electricity averages 9.90¢/kWh and commercial 12.93¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (45). WRI water stress is low. 7 fiber providers report service in the county. The climate runs 2,400 cooling degree days a year with a mean temperature of 64°F. Land is valued around $3,665 an acre.

By site type

Top datacenter sites in LEFLORE

Top datacenter sites in LEFLORE
SiteTypeVoltageCapacityQueue waitScore
OZ LefloreGreenfield——4.3 yrs55.8
UNKNOWN110735Substation-Adjacent115 kV100 MW4.3 yrs55.2
UNKNOWN110729Substation-Adjacent115 kV100 MW4.3 yrs55.2
UNKNOWN110733Substation-Adjacent115 kV100 MW4.3 yrs55.2
UNKNOWN110732Substation-Adjacent115 kV100 MW4.3 yrs55.2
TAP145955Substation-Adjacent115 kV100 MW4.3 yrs55.0
UNKNOWN110728Substation-Adjacent115 kV100 MW4.3 yrs54.8
UNKNOWN110731Substation-Adjacent115 kV100 MW4.3 yrs54.7
UNKNOWN111032Substation-Adjacent115 kV100 MW4.3 yrs54.7
TAP142160Substation-Adjacent115 kV100 MW4.3 yrs54.6
UNKNOWN110726Substation-Adjacent115 kV100 MW4.3 yrs54.4
EC FFE Leflore CountyGreenfield——4.3 yrs51.1
GREENWOOD - VORFederal Excess——4.3 yrs50.2
Mine SiteFormer Mine——4.3 yrs49.9
Greenfield (TAP142159 - TAP142177)Greenfield115 kV100 MW4.3 yrs49.4
Former Ferguson Machine ShopIndustrial——4.3 yrs49.3
Yazoo Valley Oil MillIndustrial——4.3 yrs49.3
PYCO INDUSTRIES, INC. (OTHER OILSEED PROCESSING)Manufacturing——4.3 yrs49.3
Former Farmer's Market SupplyIndustrial——4.3 yrs49.3
4-WAY ELECTRIC, INC. (ELECTRONIC COIL, TRANSFORMER, AND OTHER INDUCTOR MANUFACTURING)Manufacturing——4.3 yrs49.3
AG SPRAY EQUIPMENT, INC. (AIR AND GAS COMPRESSOR MANUFACTURING)Manufacturing——4.3 yrs49.3
Former Delta ChevroletIndustrial——4.3 yrs49.3
Former Mallette FurnitureIndustrial——4.3 yrs49.3
COMMONWEALTH PUBLISHING, INC. (OTHER COMMERCIAL PRINTING)Manufacturing——4.3 yrs49.3
VIKING RANGE CORPORATION (KITCHEN UTENSIL, POT, AND PAN MANUFACTURING)Manufacturing——4.3 yrs49.3

Every scored site in LEFLORE

All 40 sites, best first.

LEFLORE datacenter FAQ

How many datacenter sites are in LEFLORE?

40 scored datacenter candidate sites, averaging 50.9/100 DC Readiness. That is the 24th-most of 80 Mississippi counties with five or more sites.

What is the highest-scoring datacenter site in LEFLORE?

OZ Leflore scores 55.8/100 DC Readiness, the highest of the 40 scored sites in LEFLORE (a greenfield site).

Does LEFLORE offer datacenter tax incentives?

Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

What is the natural-hazard risk in LEFLORE?

FEMA's National Risk Index rates LEFLORE as "Relatively High" (score 45).

What are industrial electricity rates in LEFLORE?

Average industrial electricity is 9.90¢/kWh and commercial is 12.93¢/kWh in LEFLORE.

More in Mississippi

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in LEFLORE, Mississippi”, https://gridcensus.com/datacenter-sites/mississippi/leflore (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for LEFLORE, Mississippi is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.