Datacenter Sites in JASPER, Mississippi

JASPER has 32 scored datacenter candidate sites averaging 53.9/100 DC Readiness, with a catalogued aggregate of 950 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

JASPER, Mississippi has 32 scored datacenter candidate sites averaging 53.9/100 DC Readiness, roughly in line with the Mississippi average of 53.0. It ranks 30th of 80 Mississippi counties by number of sites and 22nd by average score. The top-scoring site is EC Near Paulding · a1e53163 at 59.0/100.

32
Candidate sites
53.9/100
Avg DC Readiness
950 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in JASPER

Site-selection context for JASPER

Yessales_tax_exemption
Datacenter tax incentive
11.88¢/kWh
Commercial electricity
8.10¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$3,476
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

How does JASPER compare with other counties in Mississippi?

By number of scored sites, JASPER ranks 30th of the 80 Mississippi counties with a county page, holding 1.0% of the state's 3,104 sites. Its average DC Readiness of 53.9/100 ranks 22nd in the state and is roughly in line with the national average of 53.0. Nationally it has the 1196th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 12 score 55 or higher.

What types of datacenter sites are in JASPER?

Substation-Adjacent sites are the most common (12, 38% of the county's inventory), followed by greenfield (10) and manufacturing (9). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in JASPER?

Industrial electricity averages 8.10¢/kWh and commercial 11.88¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (45). WRI water stress is low. 5 fiber providers report service in the county. The climate runs 2,400 cooling degree days a year with a mean temperature of 64°F. Land is valued around $3,476 an acre.

By site type

Top datacenter sites in JASPER

Top datacenter sites in JASPER
SiteTypeVoltageCapacityQueue waitScore
EC Near PauldingGreenfield——3.9 yrs59.0
EC Near PauldingGreenfield——3.9 yrs58.4
UNKNOWN109395Substation-Adjacent115 kV100 MW3.9 yrs57.0
EC Near PauldingGreenfield——3.9 yrs56.5
TAP144749Substation-Adjacent115 kV100 MW3.9 yrs56.2
TAP143455Substation-Adjacent115 kV100 MW3.9 yrs56.2
TAP169455Substation-Adjacent115 kV100 MW3.9 yrs56.2
UNKNOWN169454Substation-Adjacent115 kV100 MW3.9 yrs56.1
EC Near PauldingGreenfield——3.9 yrs55.6
UNKNOWN109407Substation-Adjacent115 kV100 MW3.9 yrs55.5
UNKNOWN109408Substation-Adjacent115 kV100 MW3.9 yrs55.5
EC Near PauldingGreenfield——3.9 yrs55.0
EC Near PauldingGreenfield——3.9 yrs54.9
EC Near PauldingGreenfield——3.9 yrs54.7
EC Near PauldingGreenfield——3.9 yrs54.5
EC Near PauldingGreenfield——3.9 yrs54.3
UNKNOWN109610Substation-Adjacent69 kV50 MW3.9 yrs54.1
UNKNOWN169456Substation-Adjacent69 kV50 MW3.9 yrs53.6
TAP169457Substation-Adjacent69 kV50 MW3.9 yrs53.6
UNKNOWN109403Substation-Adjacent69 kV50 MW3.9 yrs53.4
UNKNOWN109406Substation-Adjacent69 kV50 MW3.9 yrs52.9
EC Near PauldingGreenfield——3.9 yrs52.3
HOL-MAC CORP. (FLUID POWER CYLINDER AND ACTUATOR MANUFACTURING)Manufacturing——3.9 yrs51.2
GEORGIA-PACIFIC LLC (SAWMILLS)Manufacturing——3.9 yrs51.1
MCNEIL CABINET & MILLWORK, INC. (NONUPHOLSTERED WOOD HOUSEHOLD FURNITURE MANUFACTURING)Manufacturing——3.9 yrs51.0

Every scored site in JASPER

All 32 sites, best first.

JASPER datacenter FAQ

How many datacenter sites are in JASPER?

32 scored datacenter candidate sites, averaging 53.9/100 DC Readiness. That is the 30th-most of 80 Mississippi counties with five or more sites.

What is the highest-scoring datacenter site in JASPER?

EC Near Paulding · a1e53163 scores 59.0/100 DC Readiness, the highest of the 32 scored sites in JASPER (a greenfield site).

Does JASPER offer datacenter tax incentives?

Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

What is the natural-hazard risk in JASPER?

FEMA's National Risk Index rates JASPER as "Relatively High" (score 45).

What are industrial electricity rates in JASPER?

Average industrial electricity is 8.10¢/kWh and commercial is 11.88¢/kWh in JASPER.

More in Mississippi

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in JASPER, Mississippi”, https://gridcensus.com/datacenter-sites/mississippi/jasper (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for JASPER, Mississippi is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.