Skip to content
Gridcensus

Datacenter Sites in Shelby, Kentucky

Shelby has 35 scored datacenter candidate sites averaging 55.4/100 DC Readiness, with a catalogued aggregate of 600 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Shelby, Kentucky has 35 scored datacenter candidate sites averaging 55.4/100 DC Readiness, roughly in line with the Kentucky average of 51.8. It ranks 49th of 117 Kentucky counties by number of sites and 35th by average score. The top-scoring site is Substation-Adjacent site · 3f10529f at 60.1/100.

35
Candidate sites
55.4/100
Avg DC Readiness
600 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Shelby

Site-selection context for Shelby

Yessales_tax_exemption
Datacenter tax incentive
10.97¢/kWh
Commercial electricity
7.85¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$7,994
Land price / acre
1,300
Cooling degree days
4,300
Heating degree days
56°F
Mean annual temp

Incentive detail: Sales tax exemption on electricity for large industrial users; KBI tax credits.

How does Shelby compare with other counties in Kentucky?

By number of scored sites, Shelby ranks 49th of the 117 Kentucky counties with a county page, holding 0.5% of the state's 7,741 sites. Its average DC Readiness of 55.4/100 ranks 35th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1101st-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 17 score 55 or higher.

What types of datacenter sites are in Shelby?

Shovel-Ready sites are the most common (14, 40% of the county's inventory), followed by substation-adjacent (11) and industrial (10). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Shelby?

Industrial electricity averages 7.85¢/kWh and commercial 10.97¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 5 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 56°F. Land is valued around $7,994 an acre.

By site type

Top datacenter sites in Shelby

Top datacenter sites in Shelby
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN125703Substation-Adjacent69 kV50 MW3.9 yrs60.1
TAP140273Substation-Adjacent69 kV50 MW3.9 yrs59.5
TAP140274Substation-Adjacent69 kV50 MW3.9 yrs59.5
UNKNOWN125699Substation-Adjacent69 kV50 MW3.9 yrs59.4
UNKNOWN125698Substation-Adjacent161 kV100 MW4.7 yrs58.8
UNKNOWN125705Substation-Adjacent69 kV50 MW3.9 yrs58.7
UNKNOWN125707Substation-Adjacent69 kV50 MW3.9 yrs58.6
TAP155986Substation-Adjacent69 kV50 MW3.9 yrs58.0
Louisville Works - Chemours SiteShovel-Ready——3.9 yrs56.5
Simpsonville Interstate SiteShovel-Ready——3.9 yrs56.5
UNKNOWN160455Substation-Adjacent69 kV50 MW4.7 yrs56.2
Shelbyville -- Lewiston Site 211-010Shovel-Ready——3.9 yrs56.1
Simpsonville - 20 AcresShovel-Ready——3.9 yrs56.1
UNKNOWN125702Substation-Adjacent69 kV50 MW4.7 yrs56.1
436 Gordon Ln, Shelbyville -- Site 211-022Shovel-Ready——3.9 yrs56.1
Shelbyville -- Commerce CrossingsShovel-Ready——3.9 yrs55.3
Hi Point Industrial ParkShovel-Ready——3.9 yrs55.0
Potential Shelbyville Site 211-012Shovel-Ready——3.9 yrs54.8
Old Climax PropertyIndustrial——3.9 yrs54.7
Shelbyville Municipal Water and Sewer CommissionIndustrial——3.9 yrs54.7
Hall & Davis PropertyIndustrial——3.9 yrs54.7
219 7th StreetIndustrial——3.9 yrs54.7
Old Climax Property-Silo PropertyIndustrial——3.9 yrs54.7
6th and Henry ClayIndustrial——3.9 yrs54.7
Centro LatinoIndustrial——3.9 yrs54.6

Every scored site in Shelby

All 35 sites, best first.

Shelby datacenter FAQ

How many datacenter sites are in Shelby?

35 scored datacenter candidate sites, averaging 55.4/100 DC Readiness. That is the 49th-most of 117 Kentucky counties with five or more sites.

What is the highest-scoring datacenter site in Shelby?

Substation-Adjacent site · 3f10529f scores 60.1/100 DC Readiness, the highest of the 35 scored sites in Shelby (a substation-adjacent site).

Does Shelby offer datacenter tax incentives?

Sales tax exemption on electricity for large industrial users; KBI tax credits.

What is the natural-hazard risk in Shelby?

FEMA's National Risk Index rates Shelby as "Relatively Moderate" (score 30).

What are industrial electricity rates in Shelby?

Average industrial electricity is 7.85¢/kWh and commercial is 10.97¢/kWh in Shelby.

More in Kentucky

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 13, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Shelby, Kentucky”, https://gridcensus.com/datacenter-sites/kentucky/shelby (data as of November 13, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Shelby, Kentucky is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.