Norfolk Southern Site

Shovel-Ready

Shelby, Kentucky · PJM

DC Readiness
54.9
Fair / 100

Norfolk Southern Site is a shovel-ready datacenter candidate site in Shelby, Kentucky, interconnecting through PJM. It screens at 54.9/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth221

Connectivity

Nearest IXPFlexential - Louisville/East (LOU5)
IXP distance12.2 mi

Site characteristics

Site typeShovel-Ready
Acreage200 ac
Former useShovel-ready

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterFlexential Louisville - East
DC distance12.2 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.97¢/kWh
Industrial electricity7.85¢/kWh
Cooling degree days1,300
Heating degree days4,300
Land price / acre$7,994

Incentive detail: Sales tax exemption on electricity for large industrial users; KBI tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
50
Fiber connectivity12%
68
Energy cost10%
50
Water risk8%
92
Natural hazard8%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
57
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Shelby, ranked by DC Readiness.

Sites near Norfolk Southern Site
SiteTypeVoltageCapacityQueue waitScore
Louisville Works - Chemours SiteShovel-Ready55.8
Simpsonville CommonsShovel-Ready55.3
Simpsonville Interstate SiteShovel-Ready55.3
Simpsonville - 20 AcresShovel-Ready54.9
Greenfield (UNKNOWN125698 - TAP140264)Greenfield161 kV100 MW3.0 yrs54.9
436 Gordon Ln, Shelbyville -- Site 211-022Shovel-Ready54.4
Pike Property-JoritaShovel-Ready54.4
Shelbyville -- Lewiston Site 211-010Shovel-Ready54.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Norfolk Southern Site, Shelby. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.