Skip to content
Gridcensus

Datacenter Sites in Stevens, Kansas

Stevens has 22 scored datacenter candidate sites averaging 55.4/100 DC Readiness, with a catalogued aggregate of 651 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

22
Candidate sites
55.4/100
Avg DC Readiness
651 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 22 in Stevens

Site-selection context for Stevens

Yesproperty_tax_exemption
Datacenter tax incentive
11.47¢/kWh
Commercial electricity
9.88¢/kWh
Industrial electricity
1
Fiber providers
Medium-High
Water stress
$1,792
Land price / acre
1,400
Cooling degree days
5,000
Heating degree days
55°F
Mean annual temp

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

By site type

Top datacenter sites in Stevens

Top datacenter sites in Stevens
SiteTypeVoltageCapacityQueue waitScore
Hugoton 1Brownfield69 kV1 MW3.5 yrs59.5
EC Near Hugoton 1Greenfield3.5 yrs59.4
EC Near Hugoton 1Greenfield3.5 yrs59.1
EC Near Hugoton 1Greenfield3.5 yrs58.8
EC Near Hugoton 1Greenfield3.5 yrs58.7
EC Near Hugoton 1Greenfield3.5 yrs58.3
EC Near Hugoton 1Greenfield3.5 yrs57.7
EC Near Hugoton 1Greenfield3.5 yrs57.6
EC Near Hugoton 1Greenfield3.5 yrs57.3
EC Near Hugoton 1Greenfield3.5 yrs55.7
EC Near Hugoton 1Greenfield3.5 yrs55.6
UNKNOWN118178Substation-Adjacent115 kV100 MW3.3 yrs54.8
TAP173412Substation-Adjacent115 kV100 MW3.3 yrs54.8
UNKNOWN119559Substation-Adjacent115 kV100 MW3.3 yrs54.3
UNKNOWN148906Substation-Adjacent69 kV50 MW3.3 yrs52.9
UNKNOWN168668Substation-Adjacent69 kV50 MW3.3 yrs52.9
TAP168671Substation-Adjacent69 kV50 MW3.3 yrs52.8
TAP168669Substation-Adjacent69 kV50 MW3.3 yrs52.7
UNKNOWN168670Substation-Adjacent69 kV50 MW3.3 yrs52.6
TAP168672Substation-Adjacent69 kV50 MW3.3 yrs52.3
UNKNOWN119560Substation-Adjacent69 kV50 MW3.3 yrs52.2
Mine SiteFormer Mine3.3 yrs48.5

Stevens datacenter FAQ

How many datacenter sites are in Stevens?
22 scored datacenter candidate sites, averaging 55.4/100 DC Readiness.
Does Stevens offer datacenter tax incentives?
PEAK program payroll tax incentives; IRB property tax exemptions available.
What is the natural-hazard risk in Stevens?
FEMA's National Risk Index rates Stevens as "Relatively High" (score 35).
What are industrial electricity rates in Stevens?
Average industrial electricity is 9.88¢/kWh and commercial is 11.47¢/kWh in Stevens.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen