Datacenter Sites in Stevens, Kansas
Stevens has 22 scored datacenter candidate sites averaging 55.4/100 DC Readiness, with a catalogued aggregate of 651 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
22
Candidate sites
55.4/100
Avg DC Readiness
651 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
Site-selection context for Stevens
Yesproperty_tax_exemption
Datacenter tax incentive
11.47¢/kWh
Commercial electricity
9.88¢/kWh
Industrial electricity
1
Fiber providers
Medium-High
Water stress
$1,792
Land price / acre
1,400
Cooling degree days
5,000
Heating degree days
55°F
Mean annual temp
Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.
By site type
Top datacenter sites in Stevens
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| Hugoton 1 | Brownfield | 69 kV | 1 MW | 3.5 yrs | 59.5 |
| EC Near Hugoton 1 | Greenfield | — | — | 3.5 yrs | 59.4 |
| EC Near Hugoton 1 | Greenfield | — | — | 3.5 yrs | 59.1 |
| EC Near Hugoton 1 | Greenfield | — | — | 3.5 yrs | 58.8 |
| EC Near Hugoton 1 | Greenfield | — | — | 3.5 yrs | 58.7 |
| EC Near Hugoton 1 | Greenfield | — | — | 3.5 yrs | 58.3 |
| EC Near Hugoton 1 | Greenfield | — | — | 3.5 yrs | 57.7 |
| EC Near Hugoton 1 | Greenfield | — | — | 3.5 yrs | 57.6 |
| EC Near Hugoton 1 | Greenfield | — | — | 3.5 yrs | 57.3 |
| EC Near Hugoton 1 | Greenfield | — | — | 3.5 yrs | 55.7 |
| EC Near Hugoton 1 | Greenfield | — | — | 3.5 yrs | 55.6 |
| UNKNOWN118178 | Substation-Adjacent | 115 kV | 100 MW | 3.3 yrs | 54.8 |
| TAP173412 | Substation-Adjacent | 115 kV | 100 MW | 3.3 yrs | 54.8 |
| UNKNOWN119559 | Substation-Adjacent | 115 kV | 100 MW | 3.3 yrs | 54.3 |
| UNKNOWN148906 | Substation-Adjacent | 69 kV | 50 MW | 3.3 yrs | 52.9 |
| UNKNOWN168668 | Substation-Adjacent | 69 kV | 50 MW | 3.3 yrs | 52.9 |
| TAP168671 | Substation-Adjacent | 69 kV | 50 MW | 3.3 yrs | 52.8 |
| TAP168669 | Substation-Adjacent | 69 kV | 50 MW | 3.3 yrs | 52.7 |
| UNKNOWN168670 | Substation-Adjacent | 69 kV | 50 MW | 3.3 yrs | 52.6 |
| TAP168672 | Substation-Adjacent | 69 kV | 50 MW | 3.3 yrs | 52.3 |
| UNKNOWN119560 | Substation-Adjacent | 69 kV | 50 MW | 3.3 yrs | 52.2 |
| Mine Site | Former Mine | — | — | 3.3 yrs | 48.5 |
Stevens datacenter FAQ
- How many datacenter sites are in Stevens?
- 22 scored datacenter candidate sites, averaging 55.4/100 DC Readiness.
- Does Stevens offer datacenter tax incentives?
- PEAK program payroll tax incentives; IRB property tax exemptions available.
- What is the natural-hazard risk in Stevens?
- FEMA's National Risk Index rates Stevens as "Relatively High" (score 35).
- What are industrial electricity rates in Stevens?
- Average industrial electricity is 9.88¢/kWh and commercial is 11.47¢/kWh in Stevens.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Stevens, Kansas. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.