Skip to content
Gridcensus

Datacenter Sites in Neosho, Kansas

Neosho has 48 scored datacenter candidate sites averaging 53.2/100 DC Readiness, with a catalogued aggregate of 600 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

Neosho, Kansas has 48 scored datacenter candidate sites averaging 53.2/100 DC Readiness, roughly in line with the Kansas average of 53.6. It ranks 10th of 90 Kansas counties by number of sites and 50th by average score. The top-scoring site is EC Near Chanute 1 · 335f5718 at 57.9/100.

48
Candidate sites
53.2/100
Avg DC Readiness
600 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Neosho

Site-selection context for Neosho

Yesproperty_tax_exemption
Datacenter tax incentive
11.19¢/kWh
Commercial electricity
8.43¢/kWh
Industrial electricity
5
Fiber providers
Medium-High
Water stress
$2,282
Land price / acre
1,400
Cooling degree days
5,000
Heating degree days
55°F
Mean annual temp

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

How does Neosho compare with other counties in Kansas?

By number of scored sites, Neosho ranks 10th of the 90 Kansas counties with a county page, holding 2.0% of the state's 2,352 sites. Its average DC Readiness of 53.2/100 ranks 50th in the state and is roughly in line with the national average of 53.0. Nationally it has the 793rd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 17 score 55 or higher.

What types of datacenter sites are in Neosho?

Greenfield sites are the most common (26, 54% of the county's inventory), followed by industrial (11) and substation-adjacent (9). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Neosho?

Industrial electricity averages 8.43¢/kWh and commercial 11.19¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (35). WRI water stress is medium-high. 5 fiber providers report service in the county. The climate runs 1,400 cooling degree days a year with a mean temperature of 55°F. Land is valued around $2,282 an acre.

By site type

Top datacenter sites in Neosho

Top datacenter sites in Neosho
SiteTypeVoltageCapacityQueue waitScore
EC Near Chanute 1Greenfield——4.3 yrs57.9
EC Near Chanute 1Greenfield——4.3 yrs57.8
EC Coal Neosho CountyGreenfield——4.3 yrs57.8
EC Near Chanute 1Greenfield——4.3 yrs57.5
EC Near ErieGreenfield——4.3 yrs57.4
EC Near ErieGreenfield——4.3 yrs57.4
EC Near ErieGreenfield——4.3 yrs57.3
EC Near ErieGreenfield——4.3 yrs57.0
EC Near ErieGreenfield——4.3 yrs56.9
EC Near Chanute 1Greenfield——4.3 yrs56.7
EC Near Chanute 1Greenfield——4.3 yrs56.4
EC Near Chanute 1Greenfield——4.3 yrs56.4
EC Near ErieGreenfield——4.3 yrs56.0
EC Near ErieGreenfield——4.3 yrs55.8
EC Near Chanute 1Greenfield——4.3 yrs55.8
EC Near ErieGreenfield——4.3 yrs55.1
UNKNOWN119963Substation-Adjacent138 kV100 MW4.3 yrs55.0
EC Near Chanute 1Greenfield——4.3 yrs54.7
EC Near Chanute 1Greenfield——4.3 yrs54.5
EC Near ErieGreenfield——4.3 yrs54.5
EC Near Chanute 1Greenfield——4.3 yrs54.3
EC Near ErieGreenfield——4.3 yrs54.2
EC Near Chanute 1Greenfield——4.3 yrs54.0
EC Near Chanute 1Greenfield——4.3 yrs53.8
EC Near ErieGreenfield——4.3 yrs53.5

Every scored site in Neosho

All 48 sites, best first.

Neosho datacenter FAQ

How many datacenter sites are in Neosho?

48 scored datacenter candidate sites, averaging 53.2/100 DC Readiness. That is the 10th-most of 90 Kansas counties with five or more sites.

What is the highest-scoring datacenter site in Neosho?

EC Near Chanute 1 · 335f5718 scores 57.9/100 DC Readiness, the highest of the 48 scored sites in Neosho (a greenfield site).

Does Neosho offer datacenter tax incentives?

PEAK program payroll tax incentives; IRB property tax exemptions available.

What is the natural-hazard risk in Neosho?

FEMA's National Risk Index rates Neosho as "Relatively High" (score 35).

What are industrial electricity rates in Neosho?

Average industrial electricity is 8.43¢/kWh and commercial is 11.19¢/kWh in Neosho.

More in Kansas

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 13, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Neosho, Kansas”, https://gridcensus.com/datacenter-sites/kansas/neosho (data as of November 13, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Neosho, Kansas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.