Datacenter Sites in Lyon, Kansas

Lyon has 8 scored datacenter candidate sites averaging 55.1/100 DC Readiness, with a catalogued aggregate of 1,100 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

8
Candidate sites
55.1/100
Avg DC Readiness
1,100 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 8 in Lyon

Site-selection context for Lyon

Yesproperty_tax_exemption
Datacenter tax incentive
11.47¢/kWh
Commercial electricity
9.09¢/kWh
Industrial electricity
8
Fiber providers
Medium-High
Water stress
$2,515
Land price / acre
1,400
Cooling degree days
5,000
Heating degree days
55°F
Mean annual temp

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

By site type

Top datacenter sites in Lyon

Top datacenter sites in Lyon
SiteTypeVoltageCapacityQueue waitScore
LANGSubstation-Adjacent345 kV600 MW3.3 yrs61.4
OZ LyonGreenfield3.5 yrs61.2
UNKNOWN118051Substation-Adjacent115 kV100 MW3.3 yrs55.3
UNKNOWN119228Substation-Adjacent115 kV100 MW3.3 yrs55.3
UNKNOWN119353Substation-Adjacent115 kV100 MW3.3 yrs55.2
UNKNOWN119287Substation-Adjacent115 kV100 MW3.3 yrs55.1
Greenfield (LANG - UNKNOWN158201)Greenfield115 kV100 MW3.3 yrs48.8
Mine SiteFormer Mine3.3 yrs48.5

Lyon datacenter FAQ

How many datacenter sites are in Lyon?
8 scored datacenter candidate sites, averaging 55.1/100 DC Readiness.
Does Lyon offer datacenter tax incentives?
PEAK program payroll tax incentives; IRB property tax exemptions available.
What is the natural-hazard risk in Lyon?
FEMA's National Risk Index rates Lyon as "Relatively High" (score 35).
What are industrial electricity rates in Lyon?
Average industrial electricity is 9.09¢/kWh and commercial is 11.47¢/kWh in Lyon.