Skip to content
Gridcensus

Greenfield (LANG - UNKNOWN158201)

Greenfield

Lyon, Kansas · SPP

DC Readiness
48.8
Fair / 100

Greenfield (LANG - UNKNOWN158201) is a greenfield datacenter candidate site in Lyon, Kansas, interconnecting through SPP. It screens at 48.8/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationLANG
Nearest grid bottleneckJECAUBHOYJEC · 74 km (SPP)
Substation voltage115 kV
Available capacity100 MW
UtilityEVERGY KANSAS CENTRAL, INCinvestor ownedfavorable to large load · terms ≥ 75 MWLarge Load Power Service (LLPS, ≥75 MW) · 80% min take · 12 yr

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth64
Avg queue wait3.3 yrs

Connectivity

Nearest IXPLightEdge Kansas City Cavern (KCI2)
IXP distance72.8 mi
Fiber providers8
Fiber coverage84.9%

Site characteristics

Site typeGreenfield

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score65/100

Location context

Nearest datacenterState Farm Data Center
DC distance68.7 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity11.47¢/kWh
Industrial electricity9.09¢/kWh
Cooling degree days1,400
Heating degree days5,000
Land price / acre$2,515

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 7 nearby

Get alerts

Track Greenfield (LANG - UNKNOWN158201)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
28
Speed to power20%
54
Fiber connectivity12%
72
Energy cost10%
50
Water risk7%
52
Natural hazard6%
65
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
55

Nearby comparable sites

Other scored datacenter candidate sites in Lyon, ranked by DC Readiness.

Sites near Greenfield (LANG - UNKNOWN158201)
SiteTypeVoltageCapacityQueue waitScore
LANGSubstation-Adjacent345 kV600 MW3.3 yrs61.4
OZ LyonGreenfield3.5 yrs61.2
UNKNOWN118051Substation-Adjacent115 kV100 MW3.3 yrs55.3
UNKNOWN119228Substation-Adjacent115 kV100 MW3.3 yrs55.3
UNKNOWN119353Substation-Adjacent115 kV100 MW3.3 yrs55.2
UNKNOWN119287Substation-Adjacent115 kV100 MW3.3 yrs55.1
Mine SiteFormer Mine3.3 yrs48.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (LANG - UNKNOWN158201), Lyon. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.