Skip to content
Gridcensus

Datacenter Sites in Dickinson, Kansas

Dickinson has 30 scored datacenter candidate sites averaging 56.2/100 DC Readiness, with a catalogued aggregate of 1,800 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

30
Candidate sites
56.2/100
Avg DC Readiness
1,800 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Dickinson

Site-selection context for Dickinson

Yesproperty_tax_exemption
Datacenter tax incentive
11.02¢/kWh
Commercial electricity
9.10¢/kWh
Industrial electricity
6
Fiber providers
Medium-High
Water stress
$2,714
Land price / acre
1,400
Cooling degree days
5,000
Heating degree days
55°F
Mean annual temp

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

By site type

Top datacenter sites in Dickinson

Top datacenter sites in Dickinson
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN173218Substation-Adjacent345 kV600 MW3.3 yrs60.6
UNKNOWN118152Substation-Adjacent345 kV600 MW3.3 yrs60.6
EC Dickinson Coal AreaGreenfield3.5 yrs60.0
EC Near HeringtonGreenfield3.5 yrs59.5
EC Dickinson Coal AreaGreenfield3.5 yrs59.2
EC Near HeringtonGreenfield3.5 yrs59.2
EC Dickinson Coal AreaGreenfield3.5 yrs59.0
EC Dickinson Coal AreaGreenfield3.5 yrs58.9
EC Dickinson Coal AreaGreenfield3.5 yrs58.8
EC Near HeringtonGreenfield3.5 yrs58.8
EC Dickinson Coal AreaGreenfield3.5 yrs58.4
EC Dickinson Coal AreaGreenfield3.5 yrs58.4
EC Near HeringtonGreenfield3.5 yrs58.1
EC Near HeringtonGreenfield3.5 yrs57.9
EC Near HeringtonGreenfield3.5 yrs57.9
EC Dickinson Coal AreaGreenfield3.5 yrs57.4
EC Near HeringtonGreenfield3.5 yrs57.2
EC Near HeringtonGreenfield3.5 yrs57.2
EC Dickinson Coal AreaGreenfield3.5 yrs57.0
EC Near HeringtonGreenfield3.5 yrs56.4
EC Dickinson Coal AreaGreenfield3.5 yrs56.1
UNKNOWN119571Substation-Adjacent115 kV100 MW3.3 yrs55.3
UNKNOWN119776Substation-Adjacent115 kV100 MW3.3 yrs54.6
UNKNOWN119979Substation-Adjacent115 kV100 MW3.3 yrs54.3
Greenfield (UNKNOWN118152 - UNKNOWN176024)Greenfield230 kV300 MW3.3 yrs52.5

Dickinson datacenter FAQ

How many datacenter sites are in Dickinson?
30 scored datacenter candidate sites, averaging 56.2/100 DC Readiness.
Does Dickinson offer datacenter tax incentives?
PEAK program payroll tax incentives; IRB property tax exemptions available.
What is the natural-hazard risk in Dickinson?
FEMA's National Risk Index rates Dickinson as "Relatively High" (score 35).
What are industrial electricity rates in Dickinson?
Average industrial electricity is 9.10¢/kWh and commercial is 11.02¢/kWh in Dickinson.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Dickinson, Kansas. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.