Former Mine site at 38.973, -97.014
Former MineDickinson, Kansas · SPP
At a glance
Former Mine site at 38.973, -97.014 is a former mine datacenter candidate site in Dickinson, Kansas, scoring 48.6/100 DC Readiness — 28th of 30 scored sites in the county. It sits in the SPP grid region and the EVERGY KANSAS CENTRAL, INC service territory, where interconnection has averaged 4.3 years from request to operation.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.
Site location
Get alerts
Track Mine Site
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Former Mine site at 38.973, -97.014 compare with other sites in Dickinson?
Former Mine site at 38.973, -97.014 ranks 28th of 30 scored candidate sites in Dickinson. Its 48.6/100 is about 13% below the county average of 55.6. It is roughly in line with the Kansas average of 53.2 and roughly in line with the national average of 53.2.
Against the Kansas average, its strongest sub-score is natural hazard (65 vs 64) and its weakest is power availability (30 vs 38). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Former Mine site at 38.973, -97.014 to power, fiber and other datacenters?
The nearest located transmission bottleneck is SMKSUMPOSAXT (SPP), 33 miles away. For connectivity, the nearest internet exchange facility is Beloit-NOC at 67.7 miles. 6 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Beloit-NOC, 67.7 miles away.
What are the flood, water and hazard risks at Former Mine site at 38.973, -97.014?
At the county level, FEMA's National Risk Index rates Dickinson "Relatively High".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Dickinson, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN118152 | Substation-Adjacent | 345 kV | 600 MW | 4.3 yrs | 60.7 |
| UNKNOWN173218 | Substation-Adjacent | 345 kV | 600 MW | 4.3 yrs | 60.7 |
| EC Dickinson Coal Area | Greenfield | — | — | 4.3 yrs | 59.0 |
| EC Near Herington | Greenfield | — | — | 4.3 yrs | 58.5 |
| EC Near Herington | Greenfield | — | — | 4.3 yrs | 58.2 |
| EC Dickinson Coal Area | Greenfield | — | — | 4.3 yrs | 58.2 |
| EC Dickinson Coal Area | Greenfield | — | — | 4.3 yrs | 58.0 |
| EC Dickinson Coal Area | Greenfield | — | — | 4.3 yrs | 57.9 |
Former Mine site at 38.973, -97.014: common questions
What is the DC Readiness score of Former Mine site at 38.973, -97.014?
Former Mine site at 38.973, -97.014 scores 48.6/100 on the GridCensus DC Readiness scale, rated fair. It ranks 28th of 30 scored sites in Dickinson. The Dickinson average is 55.6 and the Kansas average is 53.2.
Which electric utility serves Former Mine site at 38.973, -97.014?
EVERGY KANSAS CENTRAL, INC (investor owned) holds the retail service territory that contains the site; its holding company is WESTAR ENERGY INC.
What grid region is Former Mine site at 38.973, -97.014 in?
Former Mine site at 38.973, -97.014 is in the SPP region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.
How far is Former Mine site at 38.973, -97.014 from an internet exchange?
The nearest internet exchange facility is Beloit-NOC, about 67.7 miles away; 6 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Former Mine site at 38.973, -97.014, Dickinson, KS”, https://gridcensus.com/datacenter-sites/kansas/dickinson/mine-site-c53085cb (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Former Mine site at 38.973, -97.014, Dickinson is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.