Datacenter Sites in Cedar, Iowa

Cedar has 24 scored datacenter candidate sites averaging 59.6/100 DC Readiness, with a catalogued aggregate of 3 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Cedar, Iowa has 24 scored datacenter candidate sites averaging 59.6/100 DC Readiness, roughly in line with the Iowa average of 56.3. It ranks 32nd of 85 Iowa counties by number of sites and 5th by average score. The top-scoring site is EC Near Durant · 811338b2 at 62.2/100.

24
Candidate sites
59.6/100
Avg DC Readiness
3 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 24 in Cedar

Site-selection context for Cedar

Yessales_tax_exemption
Datacenter tax incentive
12.50¢/kWh
Commercial electricity
8.04¢/kWh
Industrial electricity
13
Fiber providers
Low
Water stress
$10,621
Land price / acre
900
Cooling degree days
6,500
Heating degree days
48°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $1M+ investments; property tax phase-in for new construction.

How does Cedar compare with other counties in Iowa?

By number of scored sites, Cedar ranks 32nd of the 85 Iowa counties with a county page, holding 0.9% of the state's 2,572 sites. Its average DC Readiness of 59.6/100 ranks 5th in the state and is about 12% above the national average of 53.0. Nationally it has the 1511th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 23 score 55 or higher.

What types of datacenter sites are in Cedar?

Greenfield sites are the most common (22, 92% of the county's inventory), followed by brownfield (1) and industrial (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Cedar?

Industrial electricity averages 8.04¢/kWh and commercial 12.50¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 13 fiber providers report service in the county. The climate runs 900 cooling degree days a year with a mean temperature of 48°F. Land is valued around $10,621 an acre.

By site type

Top datacenter sites in Cedar

Top datacenter sites in Cedar
SiteTypeVoltageCapacityQueue waitScore
EC Near DurantGreenfield——4.3 yrs62.2
EC Near DurantGreenfield——4.3 yrs61.8
EC Near TiptonGreenfield——4.3 yrs61.7
EC Near TiptonGreenfield——4.3 yrs61.5
EC Near TiptonGreenfield——4.3 yrs61.2
EC Near DurantGreenfield——4.3 yrs61.0
EC Near DurantGreenfield——4.3 yrs60.9
EC Coal Cedar CountyGreenfield——4.3 yrs60.7
EC Near DurantGreenfield——4.3 yrs60.5
EC Near TiptonGreenfield——4.3 yrs60.5
EC Near TiptonGreenfield——4.3 yrs60.5
EC Near TiptonGreenfield——4.3 yrs60.2
EC Near TiptonGreenfield——4.3 yrs60.0
EC Near TiptonGreenfield——4.3 yrs59.8
EC Near TiptonGreenfield——4.3 yrs59.7
EC Coal Cedar CountyGreenfield——4.3 yrs59.5
EC Near DurantGreenfield——4.3 yrs59.5
EC Near TiptonGreenfield——4.3 yrs59.3
EC Near TiptonGreenfield——4.3 yrs58.5
EC Near DurantGreenfield——4.3 yrs58.4
TiptonBrownfield—3 MW4.3 yrs57.4
EC Near DurantGreenfield——4.3 yrs55.6
EC Near TiptonGreenfield——4.3 yrs55.6
325 E Green St, former Croell Redi-MixIndustrial——4.3 yrs54.9

Every scored site in Cedar

All 24 sites, best first.

Cedar datacenter FAQ

How many datacenter sites are in Cedar?

24 scored datacenter candidate sites, averaging 59.6/100 DC Readiness. That is the 32nd-most of 85 Iowa counties with five or more sites.

What is the highest-scoring datacenter site in Cedar?

EC Near Durant · 811338b2 scores 62.2/100 DC Readiness, the highest of the 24 scored sites in Cedar (a greenfield site).

Does Cedar offer datacenter tax incentives?

Sales tax exemption on DC equipment for $1M+ investments; property tax phase-in for new construction.

What is the natural-hazard risk in Cedar?

FEMA's National Risk Index rates Cedar as "Relatively Moderate" (score 30).

What are industrial electricity rates in Cedar?

Average industrial electricity is 8.04¢/kWh and commercial is 12.50¢/kWh in Cedar.

More in Iowa

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Cedar, Iowa”, https://gridcensus.com/datacenter-sites/iowa/cedar (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Cedar, Iowa is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.