WAYNE has 111 scored datacenter candidate sites averaging 52.4/100 DC Readiness, with a catalogued aggregate of 1,150 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

111
Candidate sites
52.4/100
Avg DC Readiness
1,150 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in WAYNE

Site-selection context for WAYNE

Yessales_tax_exemption
Datacenter tax incentive
11.55¢/kWh
Commercial electricity
8.33¢/kWh
Industrial electricity
10
Fiber providers
Low
Water stress
$7,341
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

By site type

Top datacenter sites in WAYNE

Top datacenter sites in WAYNE
SiteTypeVoltageCapacityQueue waitScore
OZ WayneGreenfield——3.0 yrs56.9
UNKNOWN124061Substation-Adjacent138 kV100 MW3.8 yrs55.9
UNKNOWN124055Substation-Adjacent138 kV100 MW3.8 yrs55.8
TAP137549Substation-Adjacent138 kV100 MW3.8 yrs55.8
TAP160333Substation-Adjacent69 kV50 MW3.8 yrs53.6
UNKNOWN124064Substation-Adjacent69 kV50 MW3.8 yrs53.6
UNKNOWN124405Substation-Adjacent69 kV50 MW3.8 yrs53.6
UNKNOWN124406Substation-Adjacent69 kV50 MW3.8 yrs53.6
UNKNOWN124056Substation-Adjacent69 kV50 MW3.8 yrs53.6
UNKNOWN124410Substation-Adjacent69 kV50 MW3.8 yrs53.6
TAP137551Substation-Adjacent69 kV50 MW3.8 yrs53.6
UNKNOWN124057Substation-Adjacent69 kV50 MW3.8 yrs53.6
UNKNOWN124058Substation-Adjacent69 kV50 MW3.8 yrs53.6
TAP137550Substation-Adjacent69 kV50 MW3.8 yrs53.5
UNKNOWN160329Substation-Adjacent69 kV50 MW3.8 yrs53.4
TAP160330Substation-Adjacent69 kV50 MW3.8 yrs53.4
UNKNOWN124062Substation-Adjacent69 kV50 MW3.8 yrs53.4
UNKNOWN160334Substation-Adjacent69 kV50 MW3.8 yrs53.4
TAP160331Substation-Adjacent69 kV50 MW3.8 yrs53.2
UNKNOWN124408Substation-Adjacent69 kV50 MW3.8 yrs53.2
UNKNOWN160332Substation-Adjacent69 kV50 MW3.8 yrs53.1
PAUL CASKET CO., INC. (BURIAL CASKET MANUFACTURING)Manufacturing——3.5 yrs52.4
BELDEN (COPPER WIRE (EXCEPT MECHANICAL) DRAWING)Manufacturing——3.5 yrs52.4
RICHMOND BAKING CO. (COMMERCIAL BAKERIES)Manufacturing——3.5 yrs52.4
ROGERS ENGINEERING & MFG. CO., INC. (INDUSTRIAL PROCESS FURNACE AND OVEN MANUFACTURING)Manufacturing——3.5 yrs52.4

WAYNE datacenter FAQ

How many datacenter sites are in WAYNE?
111 scored datacenter candidate sites, averaging 52.4/100 DC Readiness.
Does WAYNE offer datacenter tax incentives?
Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
What is the natural-hazard risk in WAYNE?
FEMA's National Risk Index rates WAYNE as "Relatively Moderate" (score 32).
What are industrial electricity rates in WAYNE?
Average industrial electricity is 8.33¢/kWh and commercial is 11.55¢/kWh in WAYNE.