Datacenter Sites in WABASH, Indiana

WABASH has 68 scored datacenter candidate sites averaging 52.3/100 DC Readiness, with a catalogued aggregate of 300 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

WABASH, Indiana has 68 scored datacenter candidate sites averaging 52.3/100 DC Readiness, roughly in line with the Indiana average of 53.8. It ranks 38th of 91 Indiana counties by number of sites and 67th by average score. The top-scoring site is EC Near Miami Wabash · 9f506b3a at 59.5/100.

68
Candidate sites
52.3/100
Avg DC Readiness
300 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in WABASH

Site-selection context for WABASH

Yessales_tax_exemption
Datacenter tax incentive
10.42¢/kWh
Commercial electricity
8.11¢/kWh
Industrial electricity
10
Fiber providers
Low
Water stress
$8,802
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

How does WABASH compare with other counties in Indiana?

By number of scored sites, WABASH ranks 38th of the 91 Indiana counties with a county page, holding 0.8% of the state's 8,629 sites. Its average DC Readiness of 52.3/100 ranks 67th in the state and is roughly in line with the national average of 53.0. Nationally it has the 543rd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 10 score 55 or higher.

What types of datacenter sites are in WABASH?

Manufacturing sites are the most common (38, 56% of the county's inventory), followed by industrial (15) and greenfield (13). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in WABASH?

Industrial electricity averages 8.11¢/kWh and commercial 10.42¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (32). WRI water stress is low. 10 fiber providers report service in the county. The climate runs 1,000 cooling degree days a year with a mean temperature of 52°F. Land is valued around $8,802 an acre.

By site type

Top datacenter sites in WABASH

Top datacenter sites in WABASH
SiteTypeVoltageCapacityQueue waitScore
EC Near Miami WabashGreenfield——3.0 yrs59.5
WABASHSubstation-Adjacent138 kV100 MW3.0 yrs58.9
EC Near Miami WabashGreenfield——3.0 yrs57.5
EC Near Miami WabashGreenfield——3.0 yrs56.5
EC Near Miami WabashGreenfield——3.0 yrs56.4
EC Near Miami WabashGreenfield——3.0 yrs56.4
EC Near Miami WabashGreenfield——3.0 yrs56.4
EC Near Miami WabashGreenfield——3.0 yrs56.3
EC Near Miami WabashGreenfield——3.0 yrs56.2
EC Near Miami WabashGreenfield——3.0 yrs55.6
HF GroupIndustrial——3.0 yrs52.3
DEXTER AXLE CO. (MOTOR VEHICLE TRANSMISSION AND POWER TRAIN PARTS MANUFACTURING)Manufacturing——3.0 yrs52.3
106 East Main StreetIndustrial——3.0 yrs52.3
HF GROUP, LLC, THE (TRADEBINDING AND RELATED WORK)Manufacturing——3.0 yrs52.3
CUSTOM MAGNETICS, INC. (ELECTRONIC COIL, TRANSFORMER, AND OTHER INDUCTOR MANUFACTURING)Manufacturing——3.0 yrs52.3
Rivers Edge PropertyIndustrial——3.0 yrs52.3
HI-GRADE EGG PRODUCERS (ALL OTHER MISCELLANEOUS FOOD MANUFACTURING)Manufacturing——3.0 yrs52.3
602 West Main StreetIndustrial——3.0 yrs52.3
EC Near Miami WabashGreenfield——3.0 yrs52.1
WABASH ALLOYS, LLC (PRIMARY ALUMINUM PRODUCTION)Manufacturing——3.0 yrs51.5
Tri-Lakes ContainerIndustrial——3.0 yrs51.5
FORMER ABE SPOSEEP & SONS, INC. IIIndustrial——3.0 yrs51.5
Former Brown Trucking/J&M EnterprisesIndustrial——3.0 yrs51.5
GRAPHIC PACKAGING INTERNATIONAL, INC. (ALL OTHER CONVERTED PAPER PRODUCT MANUFACTURING)Manufacturing——3.0 yrs51.5
MANCHESTER METALS, LLC (IRON FOUNDRIES)Manufacturing——3.0 yrs51.5

Every scored site in WABASH

All 68 sites, best first.

WABASH datacenter FAQ

How many datacenter sites are in WABASH?

68 scored datacenter candidate sites, averaging 52.3/100 DC Readiness. That is the 38th-most of 91 Indiana counties with five or more sites.

What is the highest-scoring datacenter site in WABASH?

EC Near Miami Wabash · 9f506b3a scores 59.5/100 DC Readiness, the highest of the 68 scored sites in WABASH (a greenfield site).

Does WABASH offer datacenter tax incentives?

Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

What is the natural-hazard risk in WABASH?

FEMA's National Risk Index rates WABASH as "Relatively Moderate" (score 32).

What are industrial electricity rates in WABASH?

Average industrial electricity is 8.11¢/kWh and commercial is 10.42¢/kWh in WABASH.

More in Indiana

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in WABASH, Indiana”, https://gridcensus.com/datacenter-sites/indiana/wabash (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for WABASH, Indiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.