Skip to content
Gridcensus

Datacenter Sites in TIPTON, Indiana

TIPTON has 22 scored datacenter candidate sites averaging 52.8/100 DC Readiness, with a catalogued aggregate of 350 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

22
Candidate sites
52.8/100
Avg DC Readiness
350 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 22 in TIPTON

Site-selection context for TIPTON

Yessales_tax_exemption
Datacenter tax incentive
10.22¢/kWh
Commercial electricity
7.96¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$11,110
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

By site type

Top datacenter sites in TIPTON

Top datacenter sites in TIPTON
SiteTypeVoltageCapacityQueue waitScore
TIPTON WESTSubstation-Adjacent230 kV300 MW3.8 yrs60.8
OHIO OILSubstation-Adjacent69 kV50 MW3.8 yrs54.1
PARK 100 FOODS, INC. (SPECIALTY CANNING)Manufacturing3.5 yrs53.3
APPLE GROUP, INC. (COMMERCIAL SCREEN PRINTING)Manufacturing3.5 yrs53.2
PIONEER HI-BRED INTERNATIONAL, INC. (FLOUR MILLING)Manufacturing3.5 yrs53.2
HIGH PERFORMANCE ALLOYS, INC. (IRON AND STEEL MILLS)Manufacturing3.5 yrs53.2
RAY BROS. & NOBLE CANNING CO., INC. (FRUIT AND VEGETABLE CANNING)Manufacturing3.5 yrs53.2
STEEL PARTS CORP. (METAL STAMPING)Manufacturing3.5 yrs53.2
WABASH ALLOYS, LLC (NOT AVAILABLE)Manufacturing3.5 yrs53.1
BOTTCHER AMERICA CORP. (PRINTING MACHINERY AND EQUIPMENT MANUFACTURING)Manufacturing3.5 yrs53.1
PACKAGE RIGHT CORP. (NOT AVAILABLE)Manufacturing3.5 yrs53.1
D C COATERS, INC. (NOT AVAILABLE)Manufacturing3.5 yrs53.1
RENEWED PERFORMANCE, INC. (LIGHT TRUCK AND UTILITY VEHICLE MANUFACTURING)Manufacturing3.5 yrs53.1
MIDWEST SHEETS (CORRUGATED AND SOLID FIBER BOX MANUFACTURING)Manufacturing3.5 yrs53.1
TOTAL SEED PRODUCTION, INC. (FLOUR MILLING)Manufacturing3.5 yrs52.6
ADLER SEEDS, INC. (FLOUR MILLING)Manufacturing3.5 yrs52.3
DUREX PRODUCTS, INC. (COPPER WIRE (EXCEPT MECHANICAL) DRAWING)Manufacturing3.5 yrs52.2
CHEGAR MFG. CO., INC. (OTHER FABRICATED WIRE PRODUCT MANUFACTURING)Manufacturing3.5 yrs52.1
CENTRAL METAL PRODUCTS, INC. (ALL OTHER LEATHER GOOD MANUFACTURING)Manufacturing3.5 yrs52.1
Cheese FactoryIndustrial3.8 yrs49.5
Windfall PropertiesIndustrial3.8 yrs49.5
Former Cheese FactoryIndustrial3.8 yrs49.5

TIPTON datacenter FAQ

How many datacenter sites are in TIPTON?
22 scored datacenter candidate sites, averaging 52.8/100 DC Readiness.
Does TIPTON offer datacenter tax incentives?
Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
What is the natural-hazard risk in TIPTON?
FEMA's National Risk Index rates TIPTON as "Relatively Moderate" (score 32).
What are industrial electricity rates in TIPTON?
Average industrial electricity is 7.96¢/kWh and commercial is 10.22¢/kWh in TIPTON.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TIPTON, Indiana. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.