Datacenter Sites in TIPTON, Indiana

TIPTON has 22 scored datacenter candidate sites averaging 52.5/100 DC Readiness, with a catalogued aggregate of 350 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

TIPTON, Indiana has 22 scored datacenter candidate sites averaging 52.5/100 DC Readiness, roughly in line with the Indiana average of 53.8. It ranks 77th of 91 Indiana counties by number of sites and 62nd by average score. The top-scoring site is TIPTON WEST at 62.6/100.

22
Candidate sites
52.5/100
Avg DC Readiness
350 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 22 in TIPTON

Site-selection context for TIPTON

Yessales_tax_exemption
Datacenter tax incentive
10.22¢/kWh
Commercial electricity
7.96¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$11,110
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

How does TIPTON compare with other counties in Indiana?

By number of scored sites, TIPTON ranks 77th of the 91 Indiana counties with a county page, holding 0.3% of the state's 8,629 sites. Its average DC Readiness of 52.5/100 ranks 62nd in the state and is roughly in line with the national average of 53.0. Nationally it has the 1603rd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 1 score 55 or higher.

What types of datacenter sites are in TIPTON?

Manufacturing sites are the most common (17, 77% of the county's inventory), followed by industrial (3) and substation-adjacent (2). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in TIPTON?

Industrial electricity averages 7.96¢/kWh and commercial 10.22¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (32). WRI water stress is low. 7 fiber providers report service in the county. The climate runs 1,000 cooling degree days a year with a mean temperature of 52°F. Land is valued around $11,110 an acre.

By site type

Top datacenter sites in TIPTON

Top datacenter sites in TIPTON
SiteTypeVoltageCapacityQueue waitScore
TIPTON WESTSubstation-Adjacent230 kV300 MW3.0 yrs62.6
OHIO OILSubstation-Adjacent69 kV50 MW3.0 yrs53.8
APPLE GROUP, INC. (COMMERCIAL SCREEN PRINTING)Manufacturing——3.0 yrs52.4
PARK 100 FOODS, INC. (SPECIALTY CANNING)Manufacturing——3.0 yrs52.4
PIONEER HI-BRED INTERNATIONAL, INC. (FLOUR MILLING)Manufacturing——3.0 yrs52.4
RAY BROS. & NOBLE CANNING CO., INC. (FRUIT AND VEGETABLE CANNING)Manufacturing——3.0 yrs52.4
RENEWED PERFORMANCE, INC. (LIGHT TRUCK AND UTILITY VEHICLE MANUFACTURING)Manufacturing——3.0 yrs52.3
STEEL PARTS CORP. (METAL STAMPING)Manufacturing——3.0 yrs52.3
WABASH ALLOYS, LLC (NOT AVAILABLE)Manufacturing——3.0 yrs52.3
HIGH PERFORMANCE ALLOYS, INC. (IRON AND STEEL MILLS)Manufacturing——3.0 yrs52.3
D C COATERS, INC. (NOT AVAILABLE)Manufacturing——3.0 yrs52.3
PACKAGE RIGHT CORP. (NOT AVAILABLE)Manufacturing——3.0 yrs52.3
BOTTCHER AMERICA CORP. (PRINTING MACHINERY AND EQUIPMENT MANUFACTURING)Manufacturing——3.0 yrs52.3
MIDWEST SHEETS (CORRUGATED AND SOLID FIBER BOX MANUFACTURING)Manufacturing——3.0 yrs52.3
TOTAL SEED PRODUCTION, INC. (FLOUR MILLING)Manufacturing——3.0 yrs51.7
ADLER SEEDS, INC. (FLOUR MILLING)Manufacturing——3.0 yrs51.5
Windfall PropertiesIndustrial——3.0 yrs51.4
Former Cheese FactoryIndustrial——3.0 yrs51.3
DUREX PRODUCTS, INC. (COPPER WIRE (EXCEPT MECHANICAL) DRAWING)Manufacturing——3.0 yrs51.3
Cheese FactoryIndustrial——3.0 yrs51.3
CENTRAL METAL PRODUCTS, INC. (ALL OTHER LEATHER GOOD MANUFACTURING)Manufacturing——3.0 yrs51.3
CHEGAR MFG. CO., INC. (OTHER FABRICATED WIRE PRODUCT MANUFACTURING)Manufacturing——3.0 yrs51.2

Every scored site in TIPTON

All 22 sites, best first.

TIPTON datacenter FAQ

How many datacenter sites are in TIPTON?

22 scored datacenter candidate sites, averaging 52.5/100 DC Readiness. That is the 77th-most of 91 Indiana counties with five or more sites.

What is the highest-scoring datacenter site in TIPTON?

TIPTON WEST scores 62.6/100 DC Readiness, the highest of the 22 scored sites in TIPTON (a substation-adjacent site).

Does TIPTON offer datacenter tax incentives?

Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

What is the natural-hazard risk in TIPTON?

FEMA's National Risk Index rates TIPTON as "Relatively Moderate" (score 32).

What are industrial electricity rates in TIPTON?

Average industrial electricity is 7.96¢/kWh and commercial is 10.22¢/kWh in TIPTON.

More in Indiana

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in TIPTON, Indiana”, https://gridcensus.com/datacenter-sites/indiana/tipton (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for TIPTON, Indiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.